ARMY UFGS-32 13 17-2008 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVEMENTS《机场路面用石胶泥沥青(SMA)》.pdf
《ARMY UFGS-32 13 17-2008 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVEMENTS《机场路面用石胶泥沥青(SMA)》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 13 17-2008 STONE MATRIX ASPHALT (SMA) FOR AIRFIELD PAVEMENTS《机场路面用石胶泥沥青(SMA)》.pdf(35页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 13 17 (April 2008)-Preparing Activity: USACE SupersedingUFGS-32 13 17 (January 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 13 17STONE
2、MATRIX ASPHALT (SMA) FOR AIRFIELD PAVEMENTS04/08PART 1 GENERAL1.1 METHOD OF MEASUREMENT1.2 BASIS OF PAYMENT1.3 PERCENT PAYMENT1.3.1 Mat and Joint Densities1.3.2 Pay Factor Based on In-Place Density1.3.3 Payment Adjustment for Smoothness1.3.4 Laboratory Air Voids and Theoretical Maximum Density1.3.5
3、Mean Absolute Deviation1.3.6 Pay Adjustment Based on Grade1.4 REFERENCES1.5 SYSTEM DESCRIPTION1.5.1 Truck Scales1.5.2 Testing Facilities1.5.3 Inspection of Plant1.5.4 Storage Bins1.5.5 Hauling Equipment1.5.6 Asphalt Pavers1.5.6.1 Receiving Hopper1.5.6.2 Automatic Grade Screed Controls1.5.7 Rollers1.
4、6 SUBMITTALS1.7 QUALITY ASSURANCE1.7.1 Sublot Sampling1.7.2 Additional Smpling and Testing1.7.3 In-Place Density1.7.4 Surface Smoothness1.7.5 Smoothness Requirements1.7.6 Testing Method1.8 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 AGGREGATES2.1.1 Coarse AggregateSECTION 32 13 17 Page 1Provided by
5、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.2 Fine Aggregate2.1.3 Mineral Filler2.1.4 Aggregate Gradation2.1.5 Fiber Stabilizer2.2 ASPHALT CEMENT BINDER2.3 MIX DESIGN2.3.1 JMF Requirements2.3.2 Adjustments to JMFPART 3 EXECUTION3.1 CONTRACTOR QUALITY CO
6、NTROL3.1.1 General Requirements3.1.2 Testing Laboratory3.1.3 Quality Control Testing3.1.3.1 Asphalt Content3.1.3.2 Gradation and Specific Gravity3.1.3.3 Temperatures3.1.3.4 Moisture Contents3.1.3.5 Laboratory Air Voids3.1.3.6 In-Place Density3.1.3.7 Grade and Smoothness3.1.3.8 Additional Testing3.1.
7、3.9 QC Monitoring3.1.4 Sampling3.1.5 Control Charts3.2 PREPARATION OF ASPHALT BINDER MATERIAL3.3 PREPARATION OF MINERAL AGGREGATE3.4 PREPARATION OF STONE MATRIX ASPHALT MIXTURE3.5 PREPARATION OF THE UNDERLYING SURFACE3.6 TEST SECTION3.6.1 Sampling and Testing for Test Section3.6.2 Additional Test Se
8、ctions3.7 TESTING LABORATORY3.8 TRANSPORTING AND PLACING3.8.1 Transporting3.8.2 Placing3.9 COMPACTION OF MIXTURE3.10 JOINTS3.10.1 Transverse Joints3.10.2 Longitudinal Joints- End of Section Table of Contents -SECTION 32 13 17 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted
9、 without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 13 17 (April 2008)-Preparing Activity: USACE SupersedingUFGS-32 13 17 (January 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 32 13 17STONE MATRIX ASPHALT (SMA) FOR AIRFI
10、ELD PAVEMENTS04/08*NOTE: This guide specification covers the requirements for stone matrix asphalt (SMA) for both heavy duty roadway and airfield pavements.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable it
11、ems(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of t
12、echnical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This guide specification only pertains to the stone matrix asphalt aspects of the project
13、and not to any surface preparation requirements dealing with aggregate base courses, milling, or tack or prime coats. Surface preparation requirements should be covered by either including them in this guide specification or by adding pertinent sections to the project documents.SMA can be used as a
14、surface course for any airfield pavement. SMA provides increased durability, resistance to rutting, resistance to reflective cracking over HMA. Local state highway experiences with SMA should be considered when developing the SECTION 32 13 17 Page 3Provided by IHSNot for ResaleNo reproduction or net
15、working permitted without license from IHS-,-,-job specification.This specification utilizes a Quality Assurance and Quality Control (QA/QC) construction management philosophy. Quality Assurance refers to the actions performed by the Government or designated representative Engineer to assure the fin
16、al product meets the job requirements. Results of QA testing are the basis for pay. Quality Control refers to the actions of the Contractor to monitor the construction and production processes and to correct these processes when out of control. Results of QC testing are reported daily on the process
17、 control charts maintained by the Contractor. Quality Control is covered in paragraph CONTRACTOR QUALITY CONTROL.*1.1 METHOD OF MEASUREMENT*NOTE: For unit-price contracts, include first bracketed statements and delete the second set. For lump-sum contracts, delete the first bracketed statements and
18、include the second set. Lump-sum contracts should not be used when the job exceeds 1000 metric tons (1000 short tons).*The amount paid for will be the number of metric short tons of SMA used in the accepted work. Weigh the SMA after mixing, and no adjustment will be made for weight of asphalt cement
19、 material incorporated herein. The measured quantity will be divided by the mix adjustment factor (MAF) to determine the pay quantity. The MAF equals the maximum theoretical specific gravity from the JMF divided by 2.500. If the MAF calculation results in a value less than or equal to 1.020 and grea
20、ter than or equal to 0.98, then the MAF shall be considered to be 1.000. If the calculated MAF is outside the range, then the actual calculated value shall be used.Measurement of the quantity of SMA, per metric short ton placed and accepted, shall be made for the purposes of assessing the pay factor
21、s stipulated in this section.1.2 BASIS OF PAYMENT*NOTE: For unit-price contracts, include first bracketed statements and delete the second set. For lump-sum contracts, delete the first bracketed statements and include the second set. Include prescriptive unit price based on the Government/Engineer e
22、stimate for payment adjustment. Lump-sum contracts should not be used when the job exceeds 1000 metric tons (1000 tons).*Quantities of SMA mixture, determined as specified above, will be paid for at respective contract unit prices or at reduced prices adjusted in accordance with paragraphs PERCENT P
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3213172008STONEMATRIXASPHALTSMAFORAIRFIELDPAVEMENTS 机场 路面 胶泥 沥青 SMAPDF

链接地址:http://www.mydoc123.com/p-449733.html