1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 13 16.16 (November 2008)-Preparing Activity: USACE SupersedingUFGS-32 13 16.16 (July 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 13
2、16.16ROLLER COMPACTED CONCRETE (RCC) PAVEMENT11/08PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT PROCEDURES1.1.1 Concrete Quantity1.1.1.1 Measurement of Concrete Quantity1.1.1.2 Payment for Concrete Quantity1.1.2 Cement Quantity1.1.2.1 Measurement of Cement Quantity1.1.2.2 Payment for Cement Quantity1.1.
3、3 Pozzolan Quantity1.1.3.1 Measurement of Pozzolan Quantity1.1.3.2 Payment for Pozzolan Quantity1.1.4 Ground Granulated Blast Furnace Slag (GGBFS)1.1.4.1 Measurement of GGBFS Quantity1.1.4.2 Payment for GGBFS Quantity1.1.5 Portland-Pozzolan Cement1.1.5.1 Measurement of Portland-Pozzolan Cement Quant
4、ity1.1.5.2 Payment for Portland-Pozzolan Cement1.1.6 RCC Lump Sum Contract1.2 PAYMENT ADJUSTMENT1.2.1 General Considerations1.2.2 Percent Payment/Acceptance of Lots1.2.3 Density1.2.3.1 Field Density1.2.3.2 Target Density1.2.3.3 Computed Percent Payment for Density1.2.4 Surface Smoothness1.2.5 Thickn
5、ess1.2.6 Surface Texture1.3 REFERENCES1.4 DEFINITIONS1.5 SYSTEM DESCRIPTION1.5.1 General Requirements1.5.2 Batching and Mixing Plant1.5.2.1 Location of Plant1.5.2.2 Type of PlantSECTION 32 13 16.16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-
6、,-1.5.2.3 Cementitious Material Feed Unit1.5.2.4 Aggregate Bins1.5.2.5 Water Control Units1.5.2.6 Batching or Feeding Tolerances1.5.2.7 Additional Requirements for Batch-Type Mixing Plants1.5.2.8 Additional Requirements for Continuous-Mixing Plants1.6 SUBMITTALS1.7 QUALITY ASSURANCE1.7.1 Sampling an
7、d Testing1.7.2 Allowable Variations1.8 DELIVERY, STORAGE, AND HANDLING1.8.1 Bulk Cementitious Materials1.8.1.1 Transporting Cementitious Materials1.8.1.2 Storage of Cementitious Materials1.8.2 Aggregate Materials1.8.2.1 Storage1.8.2.2 HandlingPART 2 PRODUCTS2.1 MATERIAL SOURCES2.1.1 Aggregate Source
8、s2.1.2 Portland Cement Source2.1.3 Aggregate Samples2.1.4 Pozzolan Source2.1.5 Ground Granulated Blast Furnace Slag Source2.2 CEMENTITIOUS MATERIALS2.2.1 Portland Cement2.2.2 Pozzolan2.2.3 Portland-Pozzolan Cement2.2.4 Ground Granulated Blast Furnace Slag2.3 WATER2.4 CURING MATERIALS2.5 AGGREGATES2.
9、5.1 Coarse Aggregate2.5.2 Fine Aggregate2.5.2.1 General Requirements2.5.2.2 Blending Material2.5.3 Alkali-Silica Reactivity2.5.3.1 Class F Flyash Option2.5.3.2 GGBF Option2.5.4 Aggregate Gradation2.5.4.1 Initial Combined Aggregate Grading Limits2.5.4.2 Base Aggregate Grading Limits2.6 ADMIXTURES2.7
10、EQUIPMENT2.7.1 Paver Requirements2.7.2 Paver Control2.7.3 Compaction Equipment2.7.3.1 Vibratory Rollers2.7.3.2 Rubber-Tired Roller2.7.3.3 Finish Roller2.7.3.4 Other Compaction Equipment2.7.4 Straightedge2.7.5 Nuclear Density Gauge2.7.6 Curing Equipment2.8 MIXTURE PROPORTIONING2.8.1 Laboratory and St
11、aff Qualifications2.8.2 CompositionSECTION 32 13 16.16 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.8.3 Criteria for Mixture Proportions2.8.4 Mix Design ProcedurePART 3 EXECUTION3.1 PRE-PLACEMENT ACTIONS3.1.1 Calibration Block for the Nucl
12、ear Density Gauge3.1.2 Test Strips3.1.3 Test Section3.1.4 Subgrade Preparation3.1.5 Grade Control3.2 TRANSPORTING AND PLACING METHODS3.3 BATCHING AND MIXING3.3.1 Mixing3.3.2 Water Content3.3.3 Mixture Uniformity Testing3.3.3.1 Mixer Performance Test3.3.3.2 Process Uniformity Test3.4 PLACING AND SPRE
13、ADING3.4.1 Placing3.4.2 Placing Adjacent Lanes3.4.3 Special Requirements for Placing Lanes Succeeding Initial Lanes3.4.4 Handwork3.4.5 Placing Odd-Shaped Areas3.4.6 Placing During Cold Weather3.4.7 Placing During Hot Weather3.5 COMPACTION3.5.1 Timing3.5.2 Initial Rolling3.5.3 Deficiency Evaluation3.
14、5.4 Vibratory Rolling and Testing3.5.5 Final Rolling3.5.6 Operation of Rollers and Tampers3.5.7 Rolling Pattern3.6 JOINTS3.6.1 Longitudinal Construction Joints3.6.2 Transverse Construction Joints3.6.3 Joints in Multilift Construction3.6.4 Slip Joints3.6.5 Sawing of Contraction Joints3.6.6 Routing Cr
15、acks3.6.7 Sealing Joints and Cracks3.7 CURING AND PROTECTION3.7.1 General3.7.2 Membrane Curing3.7.3 Burlap3.7.4 Protection of Pavement3.8 TREATMENT OF DEFECTIVE PAVEMENT3.8.1 Pavement Removal and Replacement3.8.2 Cracks in Pavement3.8.3 Mix Proportion Variations3.8.4 Voids3.8.5 Grade Variations3.9 C
16、ONTRACTOR QUALITY CONTROL3.9.1 Contractor Quality Control Staff3.9.2 Laboratory Accreditation3.9.3 Reports3.9.4 Lots and Sublots3.9.5 Additional Sampling and TestingSECTION 32 13 16.16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.9.6 Testi
17、ng and Evaluation3.9.7 Calibration of Mixing Plant3.9.8 Field Density Testing3.9.9 Concrete Strength3.9.10 Surface-Smoothness Determination (Straightedge Testing)3.9.11 Surface Texture3.9.12 Determine Pavement Thickness3.9.13 Inspection During Placing3.10 APPENDIX A3.11 Appendix B3.12 APPENDIX C- En
18、d of Section Table of Contents -SECTION 32 13 16.16 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 13 16.16 (November 2008)-Preparing Activity: USACE SupersedingUFGS-32 13 16.16 (July 2007)UNIFIED FACILI
19、TIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 32 13 16.16ROLLER COMPACTED CONCRETE (RCC) PAVEMENT11/08*NOTE: This guide specification covers the requirements for roller compacted concrete (RCC) pavements for airfields, roads, streets, parking areas, repair
20、 yards, open-storage areas, and other utility grade pavements.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information.Remove information and requirements not required in re
21、spective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the I
22、nternet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: In preparing contract specifications for RCC pavement construction, the Contracting Officer will use Appendix D of UFC 3-250-04FA for further guidance.Insert name and location of projec
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS321316162008ROLLERCOMPACTEDCONCRETERCCPAVEMENT 碾压 混凝土 RCC 路面 PDF

链接地址:http://www.mydoc123.com/p-449732.html