ARMY UFGS-32 12 43 16-2008 POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS《机场和道路用多孔防滑面层》.pdf
《ARMY UFGS-32 12 43 16-2008 POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS《机场和道路用多孔防滑面层》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 12 43 16-2008 POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS《机场和道路用多孔防滑面层》.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 43.16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 12 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated June 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 12 43.16PO
2、ROUS FRICTION COURSE FOR AIRFIELDS AND ROADS08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.1.3 Waybills and Delivery Tickets1.2 PERCENT PAYMENT1.2.1 Aggregate Gradation1.2.2 Asphalt Content1.2.3 Surface Smoothness1.2.4 Thickness Determination1.2.5 Thickness Deficiency1.3 REFERENCE
3、S1.4 SYSTEM DESCRIPTION1.4.1 Mixing Plants1.4.2 Straightedge1.4.3 Access to Plant and Equipment1.5 SUBMITTALS1.6 QUALITY ASSURANCE1.6.1 Aggregate Sampling and Testing1.6.2 Bituminous Material Requirements1.6.3 Protection of Persons and Property1.6.4 Traffic Control1.7 DELIVERY, STORAGE, AND HANDLING
4、1.7.1 Mineral Aggregate1.7.2 Bituminous Material1.7.3 Stabilizing Fiber1.7.4 Storage of PFC1.8 PROJECT/SITE CONDITIONSPART 2 PRODUCTS2.1 AGGREGATES2.1.1 Coarse Aggregate2.1.1.1 Abrasion2.1.1.2 Stone-on-Stone ContactSECTION 32 12 43.16 Page 1Provided by IHSNot for ResaleNo reproduction or networking
5、permitted without license from IHS-,-,-2.1.1.3 Crushed Gravel2.1.1.4 Coarse Aggregate Angularity2.1.1.5 Crushed Slag2.1.1.6 Aggregate Soundness2.1.1.7 Absorption2.1.2 Fine Aggregate2.1.2.1 Fine Aggregate Angularity2.1.2.2 Cleanliness2.1.3 Bituminous Materials2.1.4 Additives2.1.5 Stabilizing Fibers2.
6、2 JOB MIX FORMULA AND MOISTURE SUSCEPTIBILITY2.2.1 Job Mix Formula (JMF)2.2.2 Retained CoatingPART 3 EXECUTION3.1 PREPARATION3.1.1 Surface Preparation3.1.2 Preparation of Bituminous Mixtures3.1.2.1 Water Content of Aggregates3.1.2.2 Transportation of Bituminous Mixture3.1.2.3 Trial Test Section3.2 T
7、ACK COAT3.3 PLACING3.3.1 Offsetting Joints3.3.2 Requirements for Use of Mechanical Spreader3.3.3 Placing Strips Succeeding Initial Strips3.3.4 Handspreading in Lieu of Machine Spreading3.4 ROLLING OF MIXTURE3.5 JOINTS3.5.1 Transverse Joints3.5.2 Longitudinal Joints3.6 EDGES OF PAVEMENT3.7 CORRECTING
8、 DEFICIENT AREAS3.8 CONTRACTOR QUALITY CONTROL (CQC)3.9 ACCEPTABILITY OF WORK3.10 PROTECTION OF PAVEMENT- End of Section Table of Contents -SECTION 32 12 43.16 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS
9、-32 12 43.16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 12 20 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated June 2008*SECTION 32 12 43.16POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS08/08*NOTE: This guide specification covers the requ
10、irements for bituminous porous friction course for airfields and roads.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not requ
11、ired in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, i
12、s on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The evaluation of aggregates and mix design development should be performed by an approved commercial testing laboratory at no expense to the Government. Certified copies of a
13、ggregate tests and job mixture proportions must be submitted to the Contracting Officer for approval prior to use in the work.Drawings must indicate plan of porous friction course paving showing the thickness, after compaction, of the aggregate base course, bituminous base course, and porous frictio
14、n surface course.*SECTION 32 12 43.16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1 UNIT PRICES*NOTE: Paragraphs Measurement and Payment will be deleted if the work covered by this section is included in one lump-sum contract price. Lump-
15、sum contracts will not be used when the job exceeds 500 metric tons (tons).*1.1.1 MeasurementPorous friction course (PFC) tonnage paid for will be the number of metric 2000 pound tons of bituminous mixture used in the accepted work. Weigh bituminous mixture after mixing; no deduction will be made fo
16、r weight of bituminous materials incorporated in the mixture.1.1.2 Payment*NOTE: For unit-price contracts, include first set of bracketed sentences and delete the second set. For lump-sum contracts, delete the first set of bracketed sentences and include the second set. Include prescriptive unit pri
17、ce based on the Government/Engineer estimate for payment adjustment. Lump-sum contracts should not be used when the job exceeds 1000 metric tons (tons).*Quantities of PFC mixtures and bituminous materials determined as specified above will be paid for at respective contract unit prices or at reduced
18、 prices adjusted in accordance with paragraph ACCEPTABILITY OF WORK. Payment will constitute full compensation for preparing and/or reconditioning existing pavement; for furnishing all materials, equipment, plant, and tools; and for all labor and other incidentals necessary to complete work required
19、 by this section of the specifications.The measured quantity of hot-mixed asphalt will be paid for and included in the lump-sum contract price. If less than 100 percent payment is due based on the payfactors stipulated in paragraph PERCENT PAYMENT, a unit price of _ per ton shall be used for purpose
20、s of calculating the payment reduction.1.1.3 Waybills and Delivery Tickets*NOTE: This paragraph will be deleted for lump-sum contract jobs.*Before the final statement is allowed, file with the Contracting Officer certified waybills and certified delivery tickets for all aggregates and bituminous mat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS321243162008POROUSFRICTIONCOURSEFORAIRFIELDSANDROADS 机场 道路 多孔 防滑 面层 PDF

链接地址:http://www.mydoc123.com/p-449730.html