ARMY UFGS-32 12 22 00 10-2008 POLYMER CONCRETE- MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES《聚合物混凝土 燃料和耐磨磨损面用危覆盖面(PCMO)》.pdf
《ARMY UFGS-32 12 22 00 10-2008 POLYMER CONCRETE- MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES《聚合物混凝土 燃料和耐磨磨损面用危覆盖面(PCMO)》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 12 22 00 10-2008 POLYMER CONCRETE- MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES《聚合物混凝土 燃料和耐磨磨损面用危覆盖面(PCMO)》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 22.00 10 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 12 22.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 1
2、2 22.00 10POLYMER CONCRETE- MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANTWEARING SURFACES08/08PART 1 GENERAL1.1 METHOD OF MEASUREMENT1.2 BASIS FOR PAYMENT1.3 REFERENCES1.4 SYSTEM DESCRIPTION1.5 SUBMITTALS1.6 QUALITY ASSURANCEPART 2 PRODUCTS2.1 CEMENT2.2 WATER2.3 AGGREGATES2.4 CEMENT/AGGREGATE
3、 MIXTURE2.4.1 WPCMO Mixture Requirements2.4.2 DPCMO Mixture Requirements2.5 AGGREGATE GRADATION2.6 MIX DESIGN2.6.1 Composition2.6.1.1 WPCMO Process2.6.1.2 DPCMO Process2.6.2 Acceptability2.6.3 Adjustments to JMFPART 3 EXECUTION3.1 PREPARATION OF THE UNDERLYING SURFACE3.2 TEST SECTION3.2.1 Sampling a
4、nd Testing for Test Section3.2.2 Additional Test Sections3.3 APPLICATION3.3.1 Calibration3.3.2 Curing3.3.3 WeatherSECTION 32 12 22.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4 JOINTS3.5 CONTRACTOR QUALITY CONTROL3.5.1 General Requi
5、rements3.5.2 QC Monitoring3.5.3 Sampling3.6 APPENDICES- End of Section Table of Contents -SECTION 32 12 22.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 22.00 10 (August 2008)-Preparing Activit
6、y: USACE SupersedingUFGS-32 12 22.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 12 22.00 10POLYMER CONCRETE- MICRO-OVERLAY (PCMO)FOR FUEL AND ABRASION RESISTANT WEARING SURFACES08/08*NOTE: This guide specification covers the
7、 requirements for Polymer Concrete Micro-Overlay (PCMO) for fuel and abrasion resistant wearing surfaces.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove inf
8、ormation and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization d
9、esignation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: PCMO is to be used primarily as an alternative to coal-tar seal coats placed over asphalt surfaces to provide fuel resistance. PCMO also has
10、application as a seal coat over asphalt surfaces not requiring fuel resistance. For airfields, PCMO may be used on taxiways and parking aprons, it is not recommended for runway use. PCMO shall not be applied to grooved surfaces, as it will fill the grooves. PCMO may be used on roads and parking lots
11、 as a fuel and abrasion resistant wearing surface.SECTION 32 12 22.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-This guide specification only pertains to the polymer concrete micro-overlay aspects of the project and not to any surface
12、preparation requirements. Surface preparation requirements should be covered by either including them in this guide specification or by adding pertinent sections to the project documents.This specification utilizes a Quality Assurance and Quality Control (QA/QC) construction management philosophy. Q
13、uality Assurance refers to the actions performed by the Government to assure the final product meets the job requirements. Results of QA testing are the basis for pay. Quality Control refers to the actions of the Contractor to monitor the construction and production processes and to correct these pr
14、ocesses when out of control. Results of QC testing are reported daily on the process control charts maintained by the Contractor. Quality Control is covered in paragraph CONTRACTOR QUALITY CONTROL.*1.1 METHOD OF MEASUREMENTMeasure the quantity of PCMO, per square yard placed and accepted, for the pu
15、rposes of assessing payment.1.2 BASIS FOR PAYMENT*NOTE: For unit-price contracts, include first bracketed set and delete the second. For lump-sum contracts, delete the first bracketed set and include the second. Include prescriptive unit price based on the Government estimate for payment adjustment.
16、*Quantities of PCMO mixture, determined as specified above will be paid for at respective contract unit prices. Payment will constitute full compensation for furnishing all materials, equipment, plant, surface preparation, and tools; and for all labor and other incidentals necessary to complete the
17、required work. The measured quantity of PCMO, per square yard placed and accepted, will be paid for and included in the lump-sum contract price. Payment will constitute full compensation for furnishing all materials, equipment, plant, surface preparation, and tools; and for all labor and other incid
18、entals necessary to complete the required work.1.3 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, an
19、d title.SECTION 32 12 22.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference
20、Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below f
21、orm a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 117 (2004) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by WashingASTM C 136 (2006) S
22、tandard Test Method for Sieve Analysis of Fine and Coarse AggregatesASTM C 144 (2004) Standard Specification for Aggregate for Masonry MortarASTM C 150 (2007) Standard Specification for Portland CementASTM C 33 (2007) Standard Specification for Concrete AggregatesASTM C 387/C 387M (2006a) Standard S
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS32122200102008POLYMERCONCRETEMICROOVERLAYPCMOFORFUELANDABRASIONRESISTANTWEARINGSURFACES 聚合物 混凝土

链接地址:http://www.mydoc123.com/p-449728.html