ARMY UFGS-32 12 19-2008 BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX)《沥青粘结剂和磨耗层(中央式冷拌厂)》.pdf
《ARMY UFGS-32 12 19-2008 BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX)《沥青粘结剂和磨耗层(中央式冷拌厂)》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 12 19-2008 BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX)《沥青粘结剂和磨耗层(中央式冷拌厂)》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 19 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 12 19 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 12 19BITUMINO
2、US BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX)08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Correctional Factor for Aggregates Used1.1.1.2 Bituminous Material Unit1.1.2 Payment1.1.3 Waybills and Delivery Tickets1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 General Requirements1.3.2
3、Mixing Plant1.3.3 Rollers1.3.4 Power Brooms and Power Blowers1.3.5 Straightedge1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.6 DELIVERY, STORAGE, AND HANDLING1.6.1 Mineral Aggregates1.6.2 Bituminous Materials1.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Bituminous Material2.1.2 Aggregates2.
4、1.2.1 Coarse Aggregates2.1.2.2 Fine Aggregate2.1.2.3 Mineral Filler2.1.3 Hydrated Lime2.1.4 Liquefiers2.2 JOB MIX FORMULA (JMF)2.3 SAMPLING AND TESTING2.3.1 General Requirements2.3.2 SamplesSECTION 32 12 19 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
5、om IHS-,-,-2.3.3 Initial Sampling and Testing2.3.3.1 Source of Aggregates2.3.3.2 Source of Bituminous MaterialsPART 3 EXECUTION3.1 SURFACE PREPARATION3.1.1 Base Course3.1.2 Existing Pavement3.2 GRADE CONTROL3.3 MIXING3.3.1 Preparation of Mineral Aggregates3.3.2 Preparation of Bituminous Mixtures3.4
6、TRANSPORTATION OF BITUMINOUS MIXTURES3.5 PLACEMENT3.5.1 Thickness of Layer3.5.2 General Requirements for Use of Motor Grader3.5.3 General Requirements for Use of Mechanical Spreader3.5.4 Offsetting Joints Between Succeeding Courses3.5.5 Special Requirements for Laying Strips Succeeding Initial Strip
7、3.5.6 Shoveling, Raking, and Tamping After Machine Spreading3.5.7 Hand Spreading in Lieu of Machine Spreading3.6 COMPACTION3.7 EDGES OF PAVEMENT3.8 FINISHING3.9 THICKNESS REQUIREMENTS3.10 SURFACE-SMOOTHNESS REQUIREMENTS3.10.1 Intermediate Courses3.10.2 Finished Surfaces3.10.2.1 Roads and Streets3.10
8、.2.2 Other Than Roads and Streets3.11 JOINTS3.11.1 Transverse Joints3.11.2 Longitudinal Joints3.12 FIELD QUALITY CONTROL AND TESTING3.12.1 Testing3.12.1.1 Field Density3.12.1.2 Gradation3.12.1.3 Abrasion Resistance3.12.1.4 Soundness Test3.12.1.5 Smoothness3.12.1.6 Thickness3.12.1.7 Bitumen Content3.
9、12.2 Bituminous Material Sample3.13 PROTECTION OF PAVEMENT3.14 TABLES- End of Section Table of Contents -SECTION 32 12 19 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 19 (August 2008)-Preparing Acti
10、vity: USACE SupersedingUFGS-32 12 19 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 12 19BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX)08/08*NOTE: This guide specification covers the requirements for central-plant c
11、old-mix bituminous binder and wearing courses.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective projec
12、t, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recomme
13、nded changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement*NOTE: This paragraphs will be deleted if the work covered by this section is included in one lump sum contract price for the entire work covered by the invitation for bids.*T
14、he amount paid for will be the number of metric 2,000 pound tons of bituminous mixture called for in the bid schedule and used in the accepted work. Weigh bituminous-treated material after mixing; no deduction will be made for the weight of bituminous material in the mixture.SECTION 32 12 19 Page 3P
15、rovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.1.1 Correctional Factor for Aggregates UsedThe quantities of bituminous mixtures called for in the bid schedule are based on aggregates having an apparent specific gravity of 2.65 as determined in ac
16、cordance with ASTM C 127 and ASTM C 128. A correction in the tonnage of bituminous mixtures shall be made to compensate for the difference in square meters yards of completed pavement obtained from the tonnage of mixtures used in the project, when the specific gravities of aggregates used are more t
17、han 2.70 or less than 2.60. The tonnage paid for will be the number of metric tons tons used, proportionately corrected for specific gravities using 2.65 as base correctional factor.1.1.1.2 Bituminous Material Unit*NOTE: The method of measurement not applicable to job conditions will be deleted.*The
18、 bituminous material to be paid for will be measured in the number of liters gallons of the material used in the accepted work, corrected to liters gallons at 15.6 degrees C 60 degrees F in accordance with ASTM D 633 ASTM D 1250. Use a coefficient of 0.00045/degree C 0.00025/degree F for asphalt emu
19、lsion. metric 2000 pound tons of the material used in the accepted work.1.1.2 Payment*NOTE: This paragraphs will be deleted if the work covered by this section is included in one lump sum contract price for the entire work covered by the invitation for bids.*Bituminous binder and wearing course cons
20、tructed and accepted will be paid for at the applicable contract unit prices in the unit schedule. No payment will be made for any material wasted, used for the convenience of the Contractor, unused, or rejected.1.1.3 Waybills and Delivery Tickets*NOTE: This paragraph will be deleted if the work cov
21、ered by this section is included in one lump sum contract price for the entire work covered by the invitation for bids.*Submit copies of waybills or delivery tickets during the progress of the work. Before the final payment is allowed, furnish waybills or certified delivery tickets for all bituminou
22、s materials and paving mixtures used in the construction. Do not remove bituminous material from the tank car or storage tank until the initial outage has been taken; nor release the car or tank until final outage has been taken.SECTION 32 12 19 Page 4Provided by IHSNot for ResaleNo reproduction or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3212192008BITUMINOUSBINDERANDWEARINGCOURSESCENTRALPLANTCOLDMIX 沥青 粘结 磨耗 中央 式冷拌厂 PDF

链接地址:http://www.mydoc123.com/p-449726.html