1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 16 (August 2009)-Preparing Activity: USACE SupersedingUFGS-32 12 16 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 12 16HOT-MIX
2、 ASPHALT (HMA) FOR ROADS08/09PART 1 GENERAL1.1 UNIT PRICES1.1.1 Method of Measurement1.1.2 Basis of Payment1.1.3 Percent Payment1.1.4 Laboratory Air Voids and Theoretical Maximum Density1.1.5 Mean Absolute Deviation1.1.6 In-place Density1.1.7 Mat and Joint Densities1.1.8 Pay Factor Based on In-place
3、 Density1.1.9 Pay Factor for Grade1.1.10 Payment Adjustment for Smoothness1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Asphalt Mixing Plant1.3.2 Hauling Equipment1.3.3 Asphalt Pavers1.3.3.1 Receiving Hopper1.3.3.2 Automatic Grade Controls1.3.4 Rollers1.4 SUBMITTALS1.5 ENVIRONMENTAL REQUIRENMENTSPART 2
4、PRODUCTS2.1 AGGREGATES2.1.1 Coarse Aggregate2.1.2 Fine Aggregate2.1.3 Mineral Filler2.1.4 Aggregate Gradation2.2 ASPHALT CEMENT BINDER2.3 MIX DESIGN2.3.1 JMF Requirements2.3.2 Adjustments to Field JMF2.4 RECYCLED HOT MIX ASPHALTSECTION 32 12 16 Page 1Provided by IHSNot for ResaleNo reproduction or n
5、etworking permitted without license from IHS-,-,-2.4.1 RAP Aggregates and Asphalt Cement2.4.2 RAP MixPART 3 EXECUTION3.1 PREPARATION OF ASPHALT BINDER MATERIAL3.2 PREPARATION OF MINERAL AGGREGATE3.3 PREPARATION OF HOT-MIX ASPHALT MIXTURE3.4 PREPARATION OF THE UNDERLYING SURFACE3.5 TEST SECTION3.5.1
6、Sampling and Testing for Test Section3.5.2 Additional Test Sections3.6 TESTING LABORATORY3.7 TRANSPORTING AND PLACING3.7.1 Transporting3.7.2 Placing3.8 COMPACTION OF MIXTURE3.9 JOINTS3.9.1 Transverse Joints3.9.2 Longitudinal Joints3.10 CONTRACTOR QUALITY CONTROL3.10.1 General Quality Control Require
7、ments3.10.2 Testing Laboratory3.10.3 Quality Control Testing3.10.3.1 Asphalt Content3.10.3.2 Gradation3.10.3.3 Temperatures3.10.3.4 Aggregate Moisture3.10.3.5 Moisture Content of Mixture3.10.3.6 Laboratory Air Voids, Marshall Stability and Flow3.10.3.7 In-Place Density3.10.3.8 Grade and Smoothness3.
8、10.3.9 Additional Testing3.10.3.10 QC Monitoring3.10.4 Sampling3.10.5 Control Charts3.11 MATERIAL ACCEPTANCE3.11.1 Sublot Sampling3.11.2 Additional Sampling and Testing3.11.3 Grade3.11.4 Surface Smoothness3.11.4.1 Smoothness Requirements3.11.4.2 Testing Method- End of Section Table of Contents -SECT
9、ION 32 12 16 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 16 (August 2009)-Preparing Activity: USACE SupersedingUFGS-32 12 16 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in ag
10、reement with UMRL dated July 2009*SECTION 32 12 16HOT-MIX ASPHALT (HMA) FOR ROADS08/09*NOTE: This guide specification covers the requirements for hot-mix asphalt (HMA) courses (central-plant hot-mix) for roads.Edit this guide specification for project specific requirements by adding, deleting, or re
11、vising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the te
12、chnical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Modifications must be made to this g
13、uide specification during conversion to a project specification in accordance with the NOTES which are located throughout the document. These NOTES are instructions to the designer, and will not appear in the project specification.This guide specification only pertains to the hot-mix asphalt aspects
14、 of the project and not to any surface preparation requirements dealing with aggregate base courses, milling, or tack and prime coats. Surface preparation requirements should be covered by either including them in this guide specification or by adding pertinent sections to the SECTION 32 12 16 Page
15、3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-project documents.This specification utilizes a Quality Assurance and Quality Control (QA/QC) construction management philosophy. Quality Assurance refers to the actions performed by the Government or
16、designated representative to assure the final product meets the job requirements. This specification has been developed for QC testing to be used as a basis of pay. The Governments QA testing should include as a minimum 10% of the QC tests. The specification can be edited to utilize QA testing resul
17、ts (similar to Section 32 12 15 HOT-MIX ASPHALT (HMA) FOR AIRFIELDS) in determining the basis for pay. Quality Control refers to the actions of the Contractor to monitor the Contractors construction and production processes and to correct these processes when out of control. Results of QC testing ar
18、e reported daily on the process control charts maintained by the Contractor. Quality Control is covered in paragraph CONTRACTOR QUALITY CONTROL. Quality Control also includes the testing for pay and is covered in paragraphs MATERIAL ACCEPTANCE and PERCENT PAYMENT.For projects less than 500 tons, Sta
19、te DOT materials requirements may be specified. Only material requirements may be substituted as an option. The designer should select which DOT mix design is appropriate for the project. Construction procedures and acceptability of work requirements must stay the same. The lot size should be the en
20、tire paving portion of the project. Designer has the option to eliminate submittal requirement for material samples for this size project.For projects requiring 500 tons to 1000 tons this guide may be used “as is“. The lot size should contain the entire paving limits.For projects over 1000 tons use
21、this guide as is. Lot size should be specified appropriately.*1.1 UNIT PRICES1.1.1 Method of Measurement*NOTE: This paragraph will be deleted if the projects paving portion of the work is in one lump-sum contract price. Lump-sum contracts should not be used when the job exceeds 1000 metric tons (ton
22、s).*The amount paid for will be the number of metric short tons of hot-mix asphalt mixture used in the accepted work. Weigh hot-mix asphalt mixture after mixing, and no separate payment will be made for weight of asphalt SECTION 32 12 16 Page 4Provided by IHSNot for ResaleNo reproduction or networki
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3212162009HOTMIXASPHALTHMAFORROADS 路面 用热拌 沥青 HMAPDF

链接地址:http://www.mydoc123.com/p-449724.html