1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 15.16 (November 2012)-Preparing Activity: USACE NewUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2012*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 12 15.16WARM-MIX ASPHALT AIRFIELD PAVIN
2、G11/12PART 1 GENERAL1.1 FULL PAYMENT1.1.1 Method of Measurement1.1.2 Basis of Payment1.2 PERCENT PAYMENT1.2.1 Mat and Joint Densities1.2.2 Pay Factor Based on In-place Density1.2.3 Payment Adjustment for Smoothness1.2.4 Laboratory Air Voids and Theoretical Maximum Density1.2.5 Mean Absolute Deviatio
3、n1.2.6 Pay Adjustment Based on Grade1.3 REFERENCES1.4 SYSTEM DESCRIPTION1.4.1 Asphalt Mixing Plant1.4.2 Hauling Equipment1.4.3 Material Transfer Vehicle (MTV)1.4.4 Asphalt Pavers1.4.4.1 Receiving Hopper1.4.4.2 Automatic Grade Controls1.4.5 Rollers1.5 SUBMITTALS1.6 QUALITY ASSURANCE1.6.1 Sublot Sampl
4、ing1.6.2 Additional Sampling and Testing1.6.3 In-place Density1.6.4 Surface Smoothness1.6.4.1 Smoothness Requirements1.6.4.2 Testing Method1.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 AGGREGATES2.1.1 Coarse Aggregate2.1.2 Fine Aggregate2.1.3 Mineral FillerSECTION 32 12 15.16 Page 1Provided by IH
5、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.4 Aggregate Gradation2.2 ASPHALT CEMENT BINDER2.3 WMA TECHNOLOGIES/PRODUCTS2.4 MIX DESIGN2.4.1 JMF Requirements2.4.2 Adjustments to JMF2.5 RECYCLED WMA2.5.1 RAP Aggregates and Asphalt Cement2.5.2 RAP MixPART 3 EX
6、ECUTION3.1 CONTRACTOR QUALITY CONTROL3.1.1 General Quality Control Requirements3.1.2 Testing Laboratory3.1.3 Quality Control Testing3.1.3.1 Asphalt Content3.1.3.2 Aggregate Properties3.1.3.3 Temperatures3.1.3.4 Aggregate Moisture3.1.3.5 Moisture Content of Mixture3.1.3.6 Laboratory Air Voids, VMA, M
7、arshall Stability and Flow3.1.3.7 Moisture Susceptibility3.1.3.8 In-Place Density3.1.3.9 Grade and Smoothness3.1.3.10 Additional Testing3.1.3.11 QC Monitoring3.1.4 Sampling3.1.5 Control Charts3.2 PREPARATION OF ASPHALT BINDER MATERIAL3.3 PREPARATION OF MINERAL AGGREGATE3.4 PREPARATION OF WARM-MIX AS
8、PHALT MIXTURE3.5 PREPARATION OF THE UNDERLYING SURFACE3.6 TEST SECTION3.6.1 Sampling and Testing for Test Section3.6.2 Additional Test Sections3.7 TESTING LABORATORY3.8 TRANSPORTING AND PLACING3.8.1 Transporting3.8.2 Placing3.9 COMPACTION OF MIXTURE3.9.1 General3.9.2 Segregation3.10 JOINTS3.10.1 Tra
9、nsverse Joints3.10.2 Longitudinal Joints3.10.3 WMA-Portland Cement Concrete Joints- End of Section Table of Contents -SECTION 32 12 15.16 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 12 15.16 (November
10、 2012)-Preparing Activity: USACE NewUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2012*SECTION 32 12 15.16WARM-MIX ASPHALT AIRFIELD PAVING11/12*NOTE: This guide specification covers the requirements for bituminous intermediate and wearing courses (central
11、-plant warm-mix) for airfields using Marshall or Gyratory compaction method.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific
12、requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present. Do not edit or rewrite the unbracketed text without the e
13、xpress consent of the Corps of Engineers Transportation Systems Center (TSMCX), the Air Force major command (MAJCOM) paving engineers, or the Naval Facilities Engineering Command (NAVFAC).Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted a
14、s a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Modifications must be made to this guide specification during conversion to a project specification in accordance with the NOTES which are located throughout the document. These NOTES are instructions to the designer, and will not appear in the
15、 project specification.This guide specification only pertains to the warm-mix asphalt (WMA) aspects of the project and not to any surface preparation requirements dealing with aggregate base courses, milling, or tack and SECTION 32 12 15.16 Page 3Provided by IHSNot for ResaleNo reproduction or netwo
16、rking permitted without license from IHS-,-,-prime coats. Surface preparation requirements should be covered by either including them in this guide specification or by adding pertinent sections to the project documents.This specification utilizes a Quality Assurance and Quality Control (QA/QC) const
17、ruction management philosophy. Quality Assurance refers to the actions performed by the Government or designated representative Engineer to assure the final product meets the job requirements (see paragraph QUALITY ASSURANCE). Results of QA testing are the basis for pay. Quality Control refers to th
18、e actions of the Contractor to monitor the construction and production processes and to correct these processes when out of control. Results of QC testing are reported daily on the process control charts maintained by the Contractor. Quality Control is covered in paragraph CONTRACTOR QUALITY CONTROL
19、.*1.1 FULL PAYMENT1.1.1 Method of Measurement*NOTE: For unit-price contracts, include first bracketed statements and delete the second set. For lump-sum contracts, delete the first bracketed statements and include the second set. Lump-sum contracts should not be used when the job exceeds 1000 metric
20、 tons (tons).*The amount paid for will be the number of metric short tons of WMA mixture used in the accepted work. WMA mixture shall be weighed after mixing, and no separate payment will be made for weight of asphalt cement or other additives incorporated herein. Measurement of the quantity of WMA,
21、 per ton placed and accepted, shall be made for the purposes of assessing the pay factors stipulated below.1.1.2 Basis of Payment*NOTE: For unit-price contracts, include first bracketed statements and delete the second set. For lump-sum contracts, delete the first bracketed statements and include th
22、e second set. Include prescriptive unit price based on the Government/Engineer estimate for payment adjustment. Lump-sum contracts should not be used when the job exceeds 1000 metric tons (tons).*Quantities of WMA, determined as specified above, will be paid for at respective contract unit prices or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS321215162012WARMMIXASPHALTAIRFIELDPAVINGPDF

链接地址:http://www.mydoc123.com/p-449723.html