1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 29 (November 2009)-Preparing Activity: USACE SupersedingUFGS-32 11 29 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2009*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 11 29LIME-
2、STABILIZEDMODIFIED SUBGRADE11/09PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement for Payment1.1.1.1 Lime Stabilization Modification1.1.1.2 Lime1.1.1.3 Bituminous Material1.1.2 Basis for Payment1.1.3 Waybills and Delivery Tickets1.2 REFERENCES1.3 DEFINITIONS1.3.1 Lime-StabilizedModified Course1.3.2 Deg
3、ree of Compaction1.4 SYSTEM DESCRIPTION1.4.1 Stockpiling Materials1.4.2 Plant, Equipment, Machines, and Tools1.4.2.1 General Requisites1.4.2.2 Steel-Wheeled Rollers1.4.2.3 Pneumatic-Tired Rollers1.4.2.4 Tamping-Type Roller1.4.2.5 Mechanical Spreader1.4.2.6 Pulvimixer1.4.2.7 Slurry Mixer/Distributor1
4、.4.2.8 Central Mixing Plant1.4.2.9 Sprinkling Equipment1.4.2.10 Tampers1.4.2.11 Straightedge1.5 SUBMITTALS1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Lime2.1.2 Bituminous Material2.1.2.1 Cutback AsphaltSECTION 32 11 29 Page 1Provided by IHSNot for ResaleNo reproduction or network
5、ing permitted without license from IHS-,-,-2.1.2.2 Emulsified Asphalt2.1.3 Material to be Stabilized Modified2.1.4 Water2.2 MIX DESIGNPART 3 EXECUTION3.1 LIME STABILIZATION MODIFICATION MIXTURE3.2 OPERATION OF BORROW PITS3.3 PREPARATION OF AREA TO BE STABILIZED MODIFIED3.3.1 In-Place Material to be
6、Stabilized Modified3.3.2 In-Place Material to Receive Stabilized Modified Course3.3.3 Grade Control3.4 INSTALLATION3.4.1 Mixed In-Place Method3.4.1.1 Scarifying and Pulverizing of Soil3.4.1.2 Application of Lime3.4.1.3 Initial Mixing3.4.1.4 Water Application and Moist Mixing3.4.1.5 Confined Areas3.4
7、.2 Edges of Stabilized Modified Course3.4.3 Central-Plant Method3.4.4 Traveling-Plant Method3.4.5 Layer Thickness3.4.6 Compaction3.4.7 Finishing3.4.8 Construction Joints3.4.9 Curing and Protection3.5 SAMPLING AND TESTING3.5.1 General Requirements3.5.2 Results3.5.3 Sampling3.5.4 Sieve Analysis3.5.5 L
8、iquid Limit and Plasticity Index3.5.6 Chemical Analysis3.6 FIELD QUALITY CONTROL3.6.1 Treatment Depth Checks3.6.2 Thickness Control3.6.3 Field Density3.6.4 Smoothness Test3.7 TRAFFIC3.8 MAINTENANCE3.9 DISPOSAL OF UNSATISFACTORY MATERIALS- End of Section Table of Contents -SECTION 32 11 29 Page 2Prov
9、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 29 (November 2009)-Preparing Activity: USACE SupersedingUFGS-32 11 29 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated
10、October 2009*SECTION 32 11 29LIME-STABILIZEDMODIFIED SUBGRADE11/09*NOTE: This guide specification covers the requirements for lime stabilization or modification of subgrades airfield pavements and for roads, streets, and parking areas.Edit this guide specification for project specific requirements b
11、y adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and sho
12、uld be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The Designe
13、r should refer to UFC 3-250-11 or TM 5-822-14 for guidance on modification or stabilization of materials with lime.Sulfate reaction with either the soil to be stabilized or mixing water used in the stabilization process may be detrimental to the finished product due to the expansive nature of the su
14、lfate reaction. Soluble sulfate contents as low as 0.5% have resulted in excessive expansion of the soil due to the formation of ettringite and thaumasite. During the design phase soils and water anticipated to be included in the stabilized material should be SECTION 32 11 29 Page 3Provided by IHSNo
15、t for ResaleNo reproduction or networking permitted without license from IHS-,-,-tested for potential to cause an adverse expansion reaction. The contractor should be required to test any off site borrow sources for sulfates.If Lime stabilization or modification is considered where sulfates are pres
16、ent, the USACE Transportation Systems Center (CENWO-ED-TX), appropriate Air Force MAJCOM pavements engineer, or Naval Facilities Engineering Service Center should be consulted for up-to-date guidance.*1.1 UNIT PRICES*NOTE: This paragraph will be deleted when lump-sum payment is desired.*1.1.1 Measur
17、ement for Payment*NOTE: Method of measurement not applicable to the job conditions will be deleted. If it is desirable for material to be paid for separately, select the desired method of measurement.*1.1.1.1 Lime Stabilization ModificationMeasurement will be by the square meter yard of work complet
18、ed and accepted.1.1.1.2 LimeMeasurement will be by the number of metric 2000 pound tons of lime used in the completed and accepted work. No measurement will be made for wasted lime or lime used in work determined defective.1.1.1.3 Bituminous MaterialBituminous material to be paid for will be measure
19、d in the number of litersgallons of the material used in the accepted work, corrected to liters at 16 degrees C gallons at 60 degrees F in accordance with ASTM D 633 ASTM D 1250. A coefficient of 0.000139 per degree C 0.00025 per degree F shall be used for asphalt emulsion. metric 2000 pound tons of
20、 the material used in the accepted work.1.1.2 Basis for Payment*NOTE: Method of measurement not applicable to the job conditions will be deleted. If it is desirable for material to be paid for separately, select the desired method of measurement.*Lime stabilization modification, constructed and acce
21、pted, including lime, bituminous material and all other materials, labor and equipment required to provide a product meeting the requirements of this SECTION 32 11 29 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-specification will be paid fo
22、r at the respective contract unit prices in the bidding schedule. No payment will be made for any material wasted, used for the convenience of the Contractor, unused or rejected, or for water used. No separate payment will be made for sanding or dusting the bituminous prime-coated surfaces, and all
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3211292009LIMESTABILIZEDMODIFIEDSUBGRADE 稳定 改性 石灰 路基 PDF

链接地址:http://www.mydoc123.com/p-449719.html