1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 27 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 27 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 11 27BITUMINO
2、US-STABILIZED BASE COURSE, SUBBASE, OR SUBGRADE08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement for Payment1.1.1.1 Bituminous Stabilization1.1.1.2 Bituminous Material1.1.1.3 Select Material1.1.2 Basis for Payment1.1.3 Waybills and Delivery Tickets1.2 REFERENCES1.3 DEFINITION1.4 SYSTEM DESCRIPTION
3、1.4.1 Source of Bituminous Material1.4.2 Stockpiling Materials1.4.3 Plant, Equipment, Machines, and Tools1.4.3.1 General Requirements1.4.3.2 Bituminous Distributor1.4.3.3 Straightedge1.5 SUBMITTALS1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Bituminous Material2.1.1.1 Liquid Aspha
4、lt2.1.1.2 Emulsified Asphalt2.1.1.3 Tar2.1.2 Material to be Stabilized2.1.3 Water2.2 MIX DESIGNPART 3 EXECUTION3.1 BITUMINOUS MATERIAL MIX3.2 OPERATION OF AGGREGATE SOURCESSECTION 32 11 27 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3 PRE
5、PARATION OF AREAS TO BE STABILIZED3.3.1 In-Place Material to be Stabilized3.3.2 In-Place Materials to Receive Stabilized Course3.3.3 Select Material3.4 GRADE CONTROL3.5 MIXING OF MATERIALS3.5.1 Mixed-in-Place Method3.5.1.1 Scarifying and Pulverizing of Soil3.5.1.2 Application of Water3.5.1.3 Applica
6、tion of Bituminous Material3.5.1.4 Traveling-Plant Method3.5.2 Central Plant Method3.5.2.1 Mixing3.5.2.2 Placing3.6 PLACEMENT AND COMPACTION3.7 EDGES OF STABILIZED COURSE3.8 FINISHING3.8.1 Smoothness3.8.2 Thickness Control3.9 CONSTRUCTION JOINTS3.10 PRIME COAT3.11 Sampling and Testing3.11.1 Field De
7、nsity3.11.2 Sieve Analysis3.11.3 Liquid Limit and Plasticity Index3.11.4 Extraction Test3.11.5 Smoothness Test3.11.6 Thickness3.11.7 Bituminous Material3.12 MAINTENANCE3.13 TRAFFIC- End of Section Table of Contents -SECTION 32 11 27 Page 2Provided by IHSNot for ResaleNo reproduction or networking pe
8、rmitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 27 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 27 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 11 27BITUMINOUS-STABILIZED BASE COUR
9、SE, SUBBASE, OR SUBGRADE08/08*NOTE: This guide specification covers the requirements for bituminous stabilization of subgrades, subbases, and base courses for airfield pavements and for roads, streets, and parking areas.Edit this guide specification for project specific requirements by adding, delet
10、ing, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed
11、 to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: These parag
12、raphs will be deleted when lump-sum payment is desired. When payment basis is square meters (yards) only, delete inapplicable paragraphs.*1.1.1 Measurement for Payment1.1.1.1 Bituminous StabilizationMeasurement will be by the square meter yard of work completed and accepted.SECTION 32 11 27 Page 3Pr
13、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.1.2 Bituminous MaterialBituminous material to be paid for will be measured in the number of litersgallons of the material used in the accepted work, corrected to liters at 15 degrees C gallons at 60 d
14、egrees F in accordance with ASTM D 633 ASTM D 1250. Use a coefficient of 0.00025 per degree C F for asphalt emulsion. metric 2000 pound tons of the material used in the accepted work.1.1.1.3 Select Material*NOTE: Reference to select material will be deleted when select material is not required from
15、borrow areas.*Select material will be measured by the cubic meter yard metric 2000 pound ton of material placed and used in the completed and accepted stabilization. Measurement will not be made for select material that is wasted or used in work determined to be defective.1.1.2 Basis for Payment*NOT
16、E: Reference to select material will be deleted when select material is not required from borrow areas.The last sentence in brackets will be deleted if sanding or dusting of the bituminous-primed surfaces is not required or if bituminous-primed surfaces are to receive bituminous surfacing under the
17、contract.*Bituminous stabilization, constructed and accepted, and the quantities of bituminous material and select material will be paid for at the respective contract unit prices. Payment will not be made for any material wasted, used for the convenience of the Contractor, unused or rejected, or fo
18、r water used. Select material obtained from grading and excavation operations at the project site will not be paid for under this section but will be included for payment under other sections specifying grading and excavating. Separate payment will not be made for sanding or dusting the bituminous p
19、rime-coated surfaces. Costs for sanding or dusting will be included in the contract unit price for bituminous material.1.1.3 Waybills and Delivery TicketsSubmit copies of waybills or delivery tickets during the progress of the work. Before the final payment is allowed, furnish waybills and certified
20、 delivery tickets for all bituminous materials and select materials used in the construction.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide SECTION 32 11 27 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license
21、 from IHS-,-,-specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatical
22、ly place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3211272008BITUMINOUSSTABILIZEDBASECOURSESUBBASEORSUBGRADE 沥青 稳定 基层 地基 PDF

链接地址:http://www.mydoc123.com/p-449718.html