1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 26 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 26 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 11 26BITUMINO
2、US BASE COURSE08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement for Payment1.1.1.1 Bituminous Base-Course Tonnage1.1.1.2 Correctional Factor for Aggregates Used1.1.1.3 Bituminous Material1.1.2 Basis for Payment1.1.3 Waybills and Delivery Tickets1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Bituminous
3、Plant1.3.2 Mixing Plants1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Sampling and Testing1.5.2 Aggregates1.5.3 Mineral Filler1.5.4 Bituminous Materials1.5.5 Field Sampling of Pavements and Mixtures1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 AGGREGATES2.1.1 Coarse Aggregates2.1.1.1 Aggregate Wear2.1
4、.1.2 Aggregate Loss2.1.1.3 Dry Weight of Crushed Slag2.1.2 Fine Aggregates2.1.3 Mineral Filler2.1.4 Liquid Limit and Plasticity Index2.1.5 Sources of Aggregates2.2 BITUMINOUS MATERIALS2.2.1 Asphalt Cement2.2.2 Quality ControlSECTION 32 11 26 Page 1Provided by IHSNot for ResaleNo reproduction or netw
5、orking permitted without license from IHS-,-,-2.3 AGGREGATE GRADATION2.4 COMPOSITION OF MIXTURE2.4.1 Job-Mix Formula (JMF)2.4.2 Test Properties of Bituminous Mixtures2.4.2.1 Stability, Flow, and Voids2.4.2.2 Reduction in Stability by ImmersionPART 3 EXECUTION3.1 CONDITIONING OF UNDERLYING COURSE3.2
6、MIXING3.2.1 Preparation of Mineral Aggregates3.2.2 Preparation of Bituminous Mixtures3.2.3 Water Content of Aggregates3.2.4 Storage of Bituminous Paving Mixture3.3 TRANSPORTATION OF BITUMINOUS MIXTURE3.4 PLACING3.4.1 Spraying of Contact Surfaces of Structures3.4.2 Offsetting Joints in Bituminous Bas
7、e Course3.4.3 Use of Mechanical Spreader3.4.4 Placing Strips Succeeding Initial Strips3.4.5 Handwork Behind Machine Spreading3.4.6 Hand Spreading in Lieu of Machine Spreading3.5 GRADE AND SURFACE-SMOOTHNESS REQUIREMENTS3.5.1 Plan Grade3.5.2 Surface Smoothness3.5.3 Equipment3.6 COMPACTION OF MIXTURE3
8、.6.1 Testing of Mixture3.6.2 Correcting Deficient Areas3.7 JOINTS3.7.1 General3.7.2 Transverse Joints3.7.3 Longitudinal Joints3.8 EDGES OF PAVEMENT3.9 PROTECTION OF PAVEMENT- End of Section Table of Contents -SECTION 32 11 26 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted
9、 without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 26 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 26 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 11 26BITUMINOUS BASE COURSE08/08*NOTE: This
10、 guide specification covers the requirements for bituminous base course for pavements.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requir
11、ements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and tele
12、phone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: These paragraphs will be deleted when lump-sum payment is desired. These paragraphs may be revised to include the payment for the bituminous mate
13、rial in the payment for bituminous base course mixtures when a separate payment for the bituminous material is not considered warranted based on local experience and job conditions.*SECTION 32 11 26 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
14、-,-1.1.1 Measurement for Payment1.1.1.1 Bituminous Base-Course TonnageThe amount paid for will be the number of metric 2000-pound tons of bituminous mixture used in the accepted work. Weigh bituminous mixture after mixing, no deductions will be made for the weight of bituminous material incorporated
15、 in the mix. No payment will be made for defective areas until corrected.1.1.1.2 Correctional Factor for Aggregates UsedQuantities of paving mixtures called for in bid schedule are based on aggregates having a specific gravity of 2.65 as determined according to apparent specific gravity paragraphs i
16、n ASTM C 127 and ASTM C 128. Make correction in the tonnage of bituminous base course mixtures to compensate for the difference in the tonnage of mixtures used in the project, when specific gravities of aggregates used are more than 2.70 and less than 2.60. The tonnage paid for will be the number of
17、 tons used, proportionately corrected for specific gravities using 2.65 as the base correctional factor.1.1.1.3 Bituminous MaterialMeasure bituminous material to be paid for in the number of liters gallons of the material used in the accepted work, corrected to liters gallons at 15 degrees C 60 degr
18、ees F in accordance with ASTM D 1250. metric 2,000-pound tons of the material used in the accepted work.1.1.2 Basis for PaymentThe quantities of bituminous base course and bituminous materials will be paid for at the respective contract unit prices in the bid schedule. Payment will constitute full c
19、ompensation for preparing and reconditioning the underlying layer; for furnishing all material, equipment, plant, and tools; and for all labor and other incidentals necessary to complete the work required by this section.1.1.3 Waybills and Delivery Tickets*NOTE: This paragraph will be deleted when l
20、ump-sum payment is desired.*Submit copies of waybills and delivery tickets during progress of work. Before the final statement is allowed, submit certified waybills and certified delivery tickets for all aggregates and bituminous materials actually used in construction covered by the contract. Do no
21、t remove bituminous material from the tank cars or storage tanks until the initial outage and temperature measurements have been taken, nor shall the car or tank be released until the final outage has been taken by the Contracting Officer.1.2 REFERENCES*NOTE: This paragraph is used to list the publi
22、cations cited in the text of the guide SECTION 32 11 26 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3211262008BITUMINOUSBASECOURSE 沥青 基层 PDF

链接地址:http://www.mydoc123.com/p-449717.html