1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 26.71 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 26 71 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 26.7
2、1GROOVING FOR AIRFIELD PAVEMENTS08/08PART 1 GENERAL1.1 SYSTEM DESCRIPTION1.1.1 Grooving Machine1.1.2 Water Supply1.2 SUBMITTALS1.3 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS (Not Applicable)PART 3 EXECUTION3.1 PREPARATION3.1.1 Existing Pavements3.1.2 New Pavements3.2 GROOVING3.2.1 Procedures3.2.2 Cle
3、an-Up3.2.3 Repair of Damaged Pavement- End of Section Table of Contents -SECTION 32 01 26.71 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 26.71 (August 2008)-Preparing Activity: USACE SupersedingUFG
4、S-32 01 26 71 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 01 26.71GROOVING FOR AIRFIELD PAVEMENTS08/08*NOTE: This guide specification covers the requirements for providing grooves in airfield pavements to increase the safe perfo
5、rmance of aircraft.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets
6、are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS shou
7、ld be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: If an active runway is to be grooved, allowances such as Contractor reaction time, minimum distance equipment must be removed from the runway, and an estimated cost to the Contractor for each interruption must be addressed.If u
8、nit prices are used, the following are designer options:The unit of measurement for grooving the runway taxiway surface will be the lump sum. The unit of measurement for aircraft traffic interruptions will be each.SECTION 32 01 26.71 Page 2Provided by IHSNot for ResaleNo reproduction or networking p
9、ermitted without license from IHS-,-,-A lump sum price will be paid for grooving and cleaning the pavement. The minimum payment for each interruption will be one hour.*1.1 SYSTEM DESCRIPTION1.1.1 Grooving MachineProvide a grooving machine of a type equipped with diamond-saw cutting blades, and capab
10、le of making at least 457 mm 18 inches in width of multiple parallel grooves in one pass of the machine. Thickness of the cutting blades shall be capable of making the required width and depth of grooves in one pass of the machine. The cutting head shall not contain a mixture of new and worn blades
11、or blades of unequal wear or diameter. The wheels on the grooving machine shall be of a design that will not scar or spall the pavement. Provide the machine with devices to control depth of groove and alignment within the specified tolerances.1.1.2 Water Supply*NOTE: If transportation of the water b
12、y surface laid pipe is permitted, routing of the pipe should be shown.*Water for the grooving operation shall be provided by the Contractor Government. The water source will be described on the drawings so the Contractor can determine what Equipment will be required and the transportation means to t
13、he job.1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a sub
14、mittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently i
15、mportant or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS320126712008GROOVINGFORAIRFIELDPAVEMENTS 机场 路面 PDF

链接地址:http://www.mydoc123.com/p-449711.html