ARMY UFGS-32 01 25-2008 HEATER SCARIFYING OF BITUMINOUS PAVEMENTS《沥青路面的加热翻松》.pdf
《ARMY UFGS-32 01 25-2008 HEATER SCARIFYING OF BITUMINOUS PAVEMENTS《沥青路面的加热翻松》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 01 25-2008 HEATER SCARIFYING OF BITUMINOUS PAVEMENTS《沥青路面的加热翻松》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 25 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 25 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 25HEATER S
2、CARIFYING OF BITUMINOUS PAVEMENTS08/08PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT PROCEDURES1.1.1 Methods of Measurement1.1.1.1 Bituminous Material and Recycling Agent1.1.1.2 Treated Pavement1.1.1.3 Heater Scarifying1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Heater Scarifier1.3.2 Bituminou
3、s Distributor1.3.3 Cleaning Equipment1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Sampling1.5.2 Testing1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 BITUMINOUS MATERIAL2.2 RECYCLING AGENTSPART 3 EXECUTION3.1 PREPARATION OF SURFACE3.2 SCARIFYING OPERATION3.3 APPLICATION OF BITUMINOUS EMULSION AND RECY
4、CLING AGENTS3.4 COMPLETION OF PAVEMENT- End of Section Table of Contents -SECTION 32 01 25 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 25 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32
5、01 25 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 01 25HEATER SCARIFYING OF BITUMINOUS PAVEMENTS08/08*NOTE: This guide specification covers the requirements for heater scarifier procedures for bituminous pavements in connection
6、with surface treatments or asphalt overlays.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project,
7、 whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommend
8、ed changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Experience and data indicate that scarifying is feasible only on existing asphalt concrete pavements which are structurally sound but in need of surface leveling or sealing, for example, pavements distu
9、rbed for utility trenches or other openings or where patches have settled and surface deterioration exists. This specification covers the use of heater scarifiers for the maintenance of bituminous pavements. Heater scarifying is to be used in conjunction with surface treatments and asphalt overlays;
10、 therefore, a surface treatment or asphalt overlay section should be included in the project specifications.SECTION 32 01 25 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*1.1 MEASUREMENT AND PAYMENT PROCEDURES*NOTE: When other methods of mea
11、surement are desired or are necessary, this paragraph will be modified accordingly.*1.1.1 Methods of MeasurementDetermine quantities of bituminous material recycling agent applied and area of pavement treated in the accepted work by the following methods.1.1.1.1 Bituminous Material and Recycling Age
12、ntThe quantity of bituminous material recycling agent to be paid for will be the number of liters gallons used in the accepted work as determined by the Contracting Officer, corrected to liters at 15.6 degrees C gallons at 60 degrees F in accordance with ASTM D 1250 and using a coefficient of expans
13、ion of 0.00045 per degree C 0.00025 per degree F for asphalt emulsion.1.1.1.2 Treated PavementThe quantity of pavement treated with bituminous material recycling agent is the number of square meters yards completed and accepted as determined by the Contracting Officer. Determine the number of square
14、 meters yards of treated pavement by measuring the length and width of the specified work area. Take measurements to determine the number of square meters yards along the surface of the pavement and to the closest mm inch for width and the closest meter foot for length.1.1.1.3 Heater ScarifyingThe q
15、uantity of heater scarifying of bituminous concrete surfaces is the number of square meters yards completed and accepted, as determined by the Contracting Officer. Determine the number of square meters yards of scarified pavement by measuring the length and width of the specified work area. Take mea
16、surements along the surface of the pavement to the closest mminch for width and the closest meter foot for length.1.1.2 PaymentQuantities of heater scarifying, treated pavement and bituminous material recycling agent will be paid for at respective contract unit prices.1.2 REFERENCES*NOTE: This parag
17、raph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID o
18、utside of the Sections SECTION 32 01 25 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue
19、dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are refe
20、rred to within the text by the basic designation only.AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)AASHTO T 102 (1983; R 2004) Spot Test of Asphaltic MaterialsASTM INTERNATIONAL (ASTM)ASTM D 1250 (2007) Standard Guide for Use of the Petroleum Measurement TablesASTM D 14
21、0 (2001; R 2007) Sampling Bituminous MaterialsASTM D 2170 (2007) Kinematic Viscosity of Asphalts (Bitumens)ASTM D 2397 (2005) Standard Specification for Cationic Emulsified AsphaltASTM D 244 (2004) Emulsified AsphaltsASTM D 92 (2005a) Standard Test Method for Flash and Fire Points by Cleveland Open
22、Cup TesterASTM D 977 (2005) Emulsified Asphalt1.3 SYSTEM DESCRIPTIONMaintain equipment, tools, and machines used in the performance of the work in a satisfactory working condition at all times and conforming to applicable governing regulations for local air pollution controls.1.3.1 Heater ScarifierP
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3201252008HEATERSCARIFYINGOFBITUMINOUSPAVEMENTS 沥青路面 加热 PDF