1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 24 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 24 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 24HOT IN-P
2、LACE RECYCLING OF BITUMINOUS PAVEMENTS08/08PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT PROCEDURES1.1.1 In-Place Recycled Mixture1.1.2 New Asphalt Concrete1.1.3 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Equipment, Tools, and Machines1.3.2 Heating1.3.3 Scarifying/Milling1.3.4 Distribution and Mix
3、ing1.3.5 Placement1.3.6 Straightedge1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Initial Samplimg and Testing1.5.2 Samples1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 RECYCLING AGENTS2.2 JOB-MIX FORMULAPART 3 EXECUTION3.1 PREPARATION OF SURFACE3.2 HEATING3.3 RECYCLING PROCEDURE3.3.1 Single-Pass Meth
4、od3.3.2 Multiple-Pass Method3.4 JOINTS3.5 COMPACTION3.6 TEST SECTION3.7 ACCEPTABILITY OF WORKSECTION 32 01 24 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.7.1 Field Testing and Sampling3.7.1.1 Mixture Properties3.7.1.2 Density Testing3.7.2
5、 Grade Conformance3.7.3 Surface-Smoothness- End of Section Table of Contents -SECTION 32 01 24 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 24 (August 2008)-Preparing Activity: USACE SupersedingUFGS
6、-32 01 24 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 01 24HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS08/08*NOTE: This guide specification covers the requirements for the hot in-place recycling of existing bituminous pavement
7、 using either single or multiple pass methods.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective projec
8、t, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recomme
9、nded changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Experience and data indicate that scarifying is feasible only on existing asphalt concrete pavements which are structurally sound but in need of surface leveling or which exhibit superficial distresse
10、s. In the single pass method, new asphalt concrete is either added to or placed over the existing recycled asphalt concrete. An asphalt overlay or surface treatment should be applied to the recycled pavement when a multiple-pass recycling (heater-scarifying) process is to be used.*SECTION 32 01 24 P
11、age 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1 MEASUREMENT AND PAYMENT PROCEDURES*NOTE: When other methods of measurement are desired or are necessary, this paragraph will be modified accordingly. Delete the second paragraph when new asphal
12、t concrete is not added to the mixture. The term “recycling agent“ is used herein to describe any manufacturer certified material that is used to rejuvenate or lower the viscosity of the existing asphalt cement to the required levels.*1.1.1 In-Place Recycled MixtureThe quantity of hot in-place recyc
13、ling paid for will be the number of squaremeters yards completed and accepted as determined by the Contracting Officer. The number of square meters yards of planed pavement will be determined by measuring the length and width of the specified work area. Measurements will be along the surface of the
14、pavement and will be to the closest 0.01 meter inch for width and the closest meter foot for length. Recycling agent will be paid for by the number of liters gallons of material used in the accepted work.1.1.2 New Asphalt ConcreteNew asphalt concrete mixture will be paid for by the number of metric
15、2000-pound tons of material used in accepted work.1.1.3 PaymentThe quantities of recycled mixture, new asphalt concrete, and recycling agent determined as provided above, will be paid for at contract unit prices per square meter yard for recycled mixture and per metric ton ton for new asphalt concre
16、te and per liter gallon for recycling agent. If deficiencies in the finished product exceed specified tolerances, no payment will be made for such areas of pavement until the defective areas are corrected and accepted by the Contracting Officer.1.2 REFERENCES*NOTE: This paragraph is used to list the
17、 publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections R
18、eference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile S
19、ECTION 32 01 24 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text
20、by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 117 (2004) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by WashingASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse AggregatesASTM D 140 (2001; R 2007) Sampling Bitum
21、inous MaterialsASTM D 1856 (1995a; R 2003) Recovery of Asphalt from Solution by Abson MethodASTM D 2041 (2003a) Theoretical Maximum Specific Gravity and Density of Bituminous Paving MixturesASTM D 2170 (2007) Kinematic Viscosity of Asphalts (Bitumens)ASTM D 2171 (2007) Viscosity of Asphalts by Vacuu
22、m Capillary ViscometerASTM D 2172 (2005) Quantitative Extraction of Bitumen from Bituminous Paving MixturesASTM D 2726 (2005a) Bulk Specific Gravity and Density of Non-Absorptive Compacted Bituminous MixturesASTM D 3381 (2005) Viscosity-Graded Asphalt Cement for Use in Pavement ConstructionASTM D 36
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3201242008HOTINPLACERECYCLINGOFBITUMINOUSPAVEMENTS 沥青路面 现场 再生 PDF

链接地址:http://www.mydoc123.com/p-449709.html