ARMY UFGS-32 01 22-2008 BITUMINOUS REJUVENATION《沥青复活》.pdf
《ARMY UFGS-32 01 22-2008 BITUMINOUS REJUVENATION《沥青复活》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 01 22-2008 BITUMINOUS REJUVENATION《沥青复活》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 22 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 22 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 22BITUMINO
2、US REJUVENATION08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Quantity of Rejuvenator1.1.1.2 Treated Pavement1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Bituminous Storage Tanks1.3.2 Bituminous Distributor1.3.3 Brooms and Blowers1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.6 DELIVERY,
3、 STORAGE, AND HANDLING1.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 REJUVENATOR2.2 AGGREGATEPART 3 EXECUTION3.1 PREPARATION OF SURFACE3.2 APPLICATION OF REJUVENATOR MATERIAL3.2.1 Excess Rejuvenator Material3.2.2 Ponding and Puddling of Rejuvenator Material3.2.3 Excess Runoff of Rejuvenator3.2.4 I
4、nsufficient Rejuvenator Material3.3 TEST SECTION3.4 SAMPLING AND TESTING3.4.1 Sampling3.4.2 Testing3.4.3 Calibration TestSECTION 32 01 22 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- End of Section Table of Contents -SECTION 32 01 22 Page 2
5、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 22 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 22 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL da
6、ted July 2008*SECTION 32 01 22BITUMINOUS REJUVENATION08/08*NOTE: This guide specification covers the requirements for rejuvenation of bituminous pavements using a liquid rejuvenator material.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For br
7、acketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent o
8、f the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: Delete these paragraphs when lump-sum bi
9、dding is used.*1.1.1 Measurement1.1.1.1 Quantity of RejuvenatorThe quantity of rejuvenator to be paid for will be the number of liters gallons used in the accepted work as determined by the Contracting Officer, corrected to liters at 15 degrees C gallons at 60 degrees F in accordance with ASTM D 125
10、0, and provided that the measured quantities are not 20 SECTION 32 01 22 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-percent over the approved application rate. Any amount of rejuvenator exceeding the approved application rate by more than
11、20 percent will be deducted from the measured quantities except for irregular areas where hand spraying of the rejuvenator is necessary. The actual application rate will be determined by the Contracting Officer by dividing the number of liters gallons of rejuvenator actually applied by the number of
12、 square meters square yards of pavement treated.1.1.1.2 Treated PavementThe quantity of pavement treated with rejuvenator to be paid for will be the number of square meters square yards completed and accepted as determined by the Contracting Officer. The number of square meters square yards of treat
13、ed pavement will be determined by measuring the length and width of the specified work area. Measurements to determine the number of square meters square yards will be along the surface of the pavement and will be to the closest mm inch for width and the closest meter foot for length.1.1.2 PaymentQu
14、antities of rejuvenator and treated pavement will be paid for at respective unit prices. Payment will not be made for quantities of rejuvenator and treated pavement when actual application rate of rejuvenator is more than 20 percent below the approved application rate until deficiency is corrected i
15、n accordance with paragraph Insufficient Rejuvenator Material.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, design
16、ation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in
17、 the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by t
18、he basic designation only.ASTM INTERNATIONAL (ASTM)ASTM D 1250 (2007) Standard Guide for Use of the Petroleum Measurement TablesSECTION 32 01 22 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM D 140 (2001; R 2007) Sampling Bituminous Mater
19、ialsASTM D 1856 (1995a; R 2003) Recovery of Asphalt from Solution by Abson MethodASTM D 2170 (2007) Kinematic Viscosity of Asphalts (Bitumens)ASTM D 2171 (2007) Viscosity of Asphalts by Vacuum Capillary ViscometerASTM D 2172 (2005) Quantitative Extraction of Bitumen from Bituminous Paving MixturesAS
20、TM D 244 (2004) Emulsified AsphaltsASTM D 2995 (1999; R 2004) Determining Application Rate of Bituminous DistributorsASTM D 92 (2005a) Standard Test Method for Flash and Fire Points by Cleveland Open Cup Tester1.3 SYSTEM DESCRIPTIONEquipment, tools, and machines are subject to approval and shall be
21、maintained in satisfactory working condition at all times.1.3.1 Bituminous Storage TanksProvide bituminous storage tanks capable of heating the bituminous material under effective and positive control at all times to the required temperature. Accomplish heating by steam coils, hot oil, electricity,
22、or other suitable method. Affix an armored thermometer to the tank so that the temperature of the bituminous material may be read at all times.1.3.2 Bituminous DistributorProvide a bituminous distributor designed and equipped to spray the bituminous material in a uniform double or triple lap at the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3201222008BITUMINOUSREJUVENATION 沥青 复活 PDF

链接地址:http://www.mydoc123.com/p-449708.html