1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 19 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 19 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 19FIELD MO
2、LDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Joint Cleaning Equipment1.3.1.1 Tractor-Mounted Routing Tool1.3.1.2 Concrete Saw1.3.1.3 Sandblasting Equipment1.3.1.4 Waterblasting Equipment1.
3、3.1.5 Hand Tools1.3.2 Sealing Equipment1.3.2.1 Hot-Poured Sealing Equipment1.3.2.2 Two-Component, Cold-Applied, Machine Mix Sealing Equipment1.3.2.3 Two-Component, Cold-Applied, Hand-Mix Sealing Equipment1.3.2.4 Cold-Applied, Single-Component Sealing Equipment1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1
4、 Safety1.5.2 Test Requirements1.5.3 Trial Joint Sealant Installation1.6 DELIVERY, STORAGE, AND HANDLING1.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 SEALANTS2.2 PRIMERS2.3 BACKUP MATERIALS2.4 BOND BREAKING TAPESPART 3 EXECUTION3.1 PREPARATION OF JOINTSSECTION 32 01 19 Page 1Provided by IHSNot for
5、 ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.1 Existing Sealant Removal3.1.2 Sawing3.1.2.1 Refacing of Joints3.1.2.2 Refacing of Random Cracks3.1.3 Sandblasting3.1.4 Back-Up Material3.1.5 Bond Breaking Tape3.1.6 Rate of Progress of Joint Preparation3.2 PREPARATION
6、OF SEALANT3.2.1 Hot-Poured Sealants3.2.2 Type M Sealants3.2.3 Type H Sealants3.2.4 Single-Component, Cold-Applied Sealants3.3 INSTALLATION OF SEALANT3.3.1 Time of Application3.3.2 Sealing Joints3.4 INSPECTION3.4.1 Joint Cleaning3.4.2 Joint Sealant Application Equipment3.4.3 Joint Sealant3.5 CLEAN-UP
7、- End of Section Table of Contents -SECTION 32 01 19 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 19 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 19 (April 2006)UNIFIED FACILITIES G
8、UIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 01 19FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS08/08*NOTE: This guide specification covers the requirements for field molded sealants in sealing or resealing joints in rigid pavements on airfields, r
9、oads, streets, and other areas.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or n
10、ot brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to
11、 a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: In preparing contract specifications for concrete pavements the designer will use UFC 3-250-04FA Standard Practice for Concrete Pavements.*1.1 UNIT PRICES*NOTE: Delete this paragraph when lump sum bidding is used.*S
12、ECTION 32 01 19 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.1 MeasurementDetermine the quantity of each sealing item to be paid for by actual measurement of the number of linear meters feet of in-place material that has been approved by
13、 the Contracting Officer.1.1.2 PaymentPayment will be made at the contract unit bid prices per linear meter foot for the sealing items scheduled. The unit bid prices will include the cost of all labor, materials, and the use of all equipment and tools required to complete the work.1.2 REFERENCES*NOT
14、E: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when yo
15、u add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specifi
16、cation when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 509 (2006) Elastomeric
17、 Cellular Preformed Gasket and Sealing MaterialASTM D 5893 (2004) Cold Applied, Single Component, Chemically Curing Silicone Joint Sealant for Portland Cement Concrete PavementsASTM D 6690 (2007) Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt PavementsASTM D 7116 (2005) Standard Spe
18、cification for Joint Sealants, Hot Applied, Jet Fuel Resistant Types, for Portland Cement ConcreteASTM D 789 (2007) Determination of Relative Viscosity and Moisture Content of Polyamide (PA)SECTION 32 01 19 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
19、om IHS-,-,-U.S. ARMY CORPS OF ENGINEERS (USACE)COE CRD-C 525 (1989) Test Method for Evaluation of Hot-Applied Joint Sealants for Bubbling Due to HeatingU.S. GENERAL SERVICES ADMINISTRATION (GSA)FS SS-S-200 (Rev E; Am 2) Sealant, Joint, Two-Component, Jet-Blast-Resistant, Cold-Applied, for Portland C
20、ement Concrete Pavement1.3 SYSTEM DESCRIPTIONMachines, tools, and equipment used in the performance of the work required by this section shall be approved before the work is started maintained in satisfactory condition at all times.1.3.1 Joint Cleaning Equipment1.3.1.1 Tractor-Mounted Routing ToolPr
21、ovide a routing tool, used for removing old sealant from the joints, of such shape and dimensions and so mounted on the tractor that it will not damage the sides of the joints. The tool shall be designed so that it can be adjusted to remove the old material to varying depths as required. The use of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3201192008FIELDMOLDEDSEALANTSFORSEALINGJOINTSINRIGIDPAVEMENTS 刚性 路面 密封 接合 实地 密封剂 PDF

链接地址:http://www.mydoc123.com/p-449707.html