ARMY UFGS-23 82 02 00 10-2008 UNITARY HEATING AND COOLING EQUIPMENT《统一供热和空调系统》.pdf
《ARMY UFGS-23 82 02 00 10-2008 UNITARY HEATING AND COOLING EQUIPMENT《统一供热和空调系统》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-23 82 02 00 10-2008 UNITARY HEATING AND COOLING EQUIPMENT《统一供热和空调系统》.pdf(50页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 82 02.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 82 02.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR C
2、ONDITIONINGSECTION 23 82 02.00 10UNITARY HEATING AND COOLING EQUIPMENT04/08PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.3.1 Drawings1.3.2 Electrical Work1.4 DELIVERY, STORAGE, AND HANDLING1.5 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Na
3、meplates2.1.3 Safety Devices2.2 UNITARY EQUIPMENT, ROOM UNIT2.2.1 Window or Through-the-Wall Mounted Unit2.2.2 Packaged Terminal Unit2.2.3 Compressor2.2.4 Air-To-Refrigerant Coils2.2.5 Fans2.2.6 Air Filters2.2.7 Primary/Supplemental Heat2.2.8 Cabinet Construction2.2.9 Wall Sleeve2.2.10 Duct Package2
4、.2.11 Unit Controls2.3 UNITARY EQUIPMENT, PACKAGE SYSTEM2.3.1 Air-to-Refrigerant Coils2.3.2 Water-to-Refrigerant Coils2.3.3 Evaporatively-Cooled Section2.3.3.1 Pan Section2.3.3.2 Fan Section2.3.3.3 Condensing Coil2.3.3.4 Water Distribution SystemSECTION 23 82 02.00 10 Page 1Provided by IHSNot for Re
5、saleNo reproduction or networking permitted without license from IHS-,-,-2.3.3.5 Water Pump2.3.3.6 Drift Eliminator2.3.3.7 Evaporator Controls2.3.4 Compressor2.3.5 Refrigeration Circuit2.3.6 Unit Controls2.4 UNITARY EQUIPMENT, SPLIT SYSTEM2.4.1 Air-to-Refrigerant Coil2.4.2 Compressor2.4.3 Refrigerat
6、ion Circuit2.4.4 Unit Controls2.5 REMOTE CONDENSER OR CONDENSING UNIT2.5.1 Air-Cooled Condenser2.5.1.1 Connections2.5.1.2 Head Pressure Control and Liquid Subcooling2.5.1.3 Condensing Coil2.5.1.4 Unit Controls2.5.2 Evaporative Condenser2.5.2.1 Pan Section2.5.2.2 Fan Section2.5.2.3 Condensing Coil2.5
7、.2.4 Water Distribution System2.5.2.5 Water Pump2.5.2.6 Drift Eliminator2.5.2.7 Unit Controls2.5.3 Compressor2.6 AIR-CONDITIONERS FOR ELECTRONIC DATA PROCESSING (EDP) SPACES2.6.1 Air-to-Refrigerant Coils2.6.2 Water-to-Refrigerant Coils2.6.3 Compressor2.6.4 Refrigeration Circuit2.6.5 Unit Controls2.6
8、.5.1 Externally Accessible Controls2.6.5.2 Status Indicators2.6.5.3 Alarmed Conditions2.6.5.4 Space Temperature2.6.5.5 Safety Controls2.6.6 Cabinet Construction2.7 EQUIPMENT EFFICIENCY2.8 UNITARY EQUIPMENT COMPONENTS2.8.1 Refrigerant and Oil2.8.2 Fans2.8.3 Primary/Supplemental Heating2.8.3.1 Water C
9、oil2.8.3.2 Steam Coil2.8.3.3 Electric Heating Coil2.8.3.4 Gas-Fired Heating Section2.8.4 Air Filters2.8.4.1 Extended Surface Pleated Panel Filters2.8.4.2 Replaceable Media Filters2.8.4.3 Sectional Cleanable Filters2.8.5 Coil Frost Protection2.8.6 Pressure Vessels2.8.6.1 Hot Gas Muffler2.8.6.2 Liquid
10、 Receiver2.8.6.3 Oil Separator2.8.6.4 Oil Reservoir2.8.7 Internal Dampers2.8.8 Mixing BoxesSECTION 23 82 02.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.8.9 Cabinet Construction2.8.9.1 Indoor Cabinet2.8.9.2 Outdoor Cabinet2.9 ACCESSO
11、RIES2.9.1 Dry-Cooler, Glycol Solution2.9.1.1 Coil2.9.1.2 Fan Section2.9.1.3 Pump2.9.1.4 Controls2.9.2 Humidifier2.9.2.1 Steam Spray Type2.9.2.2 Steam-Diffuser Type2.9.3 Purge System2.9.4 Refrigerant Leak Detector2.9.5 Refrigerant Relief Valve/Rupture Disc Assembly2.9.6 Refrigerant Signs2.9.6.1 Insta
12、llation Identification2.9.6.2 Controls and Piping Identification2.9.7 Heat Recovery Devices2.9.7.1 Hot Air Reclaim2.9.7.2 Hot Water Reclaim2.9.8 Gaskets2.9.9 Bolts and Nuts2.9.10 Bird Screen2.10 FINISHES2.10.1 Factory Coating2.10.1.1 Coil Corrosion Protection2.10.1.2 Equipment and Components2.10.2 F
13、actory Applied Insulation2.11 SUPPLEMENTAL COMPONENTS/SERVICES2.11.1 Condenser Water Piping and Accessories2.11.2 Refrigerant Piping2.11.3 Cooling Tower2.11.4 Ductwork2.11.5 Temperature ControlsPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.2.1 Equipment3.2.2 Mechanical Room Ventilation3.2.3 Field
14、 Applied Insulation3.2.4 Field Painting3.3 CLEANING AND ADJUSTING3.4 REFRIGERANT TESTS, CHARGING, AND START-UP3.4.1 Refrigerant Leakage3.4.2 Contractors Responsibility3.5 DEMONSTRATIONS3.6 SYSTEM PERFORMANCE TESTS- End of Section Table of Contents -SECTION 23 82 02.00 10 Page 3Provided by IHSNot for
15、 ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 82 02.00 10 (April 2008)-Preparing Activity: USACE SupersedingUFGS-23 82 02.00 10 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March
16、 2008*SECTION 23 82 02.00 10UNITARY HEATING AND COOLING EQUIPMENT04/08*NOTE: This guide specification covers the requirements for unitary (packaged and split systems) air-conditioners, heat pumps, and accessories.Edit this guide specification for project specific requirements by adding, deleting, or
17、 revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the
18、 technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is u
19、sed to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of
20、 the Sections Reference Article to automatically place the reference in the Reference Article. Also use the SECTION 23 82 02.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Reference Wizards Check Reference feature to update the issue dat
21、es.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referre
22、d to within the text by the basic designation only.AIR-CONDITIONING AND REFRIGERATION INSTITUTE (ARI)ARI 210/240 (2006) Performance Rating of Unitary Air-Conditioning and Air-Source Heat Pump EquipmentARI 270 (1995) Standard for Sound Rating of Outdoor Unitary EquipmentARI 310/380 (2004) Standard fo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS23820200102008UNITARYHEATINGANDCOOLINGEQUIPMENT 统一 热和 空调 系统 PDF