ARMY UFGS-12 35 70-2010 MEDICAL AND DENTAL CASEWORK.pdf
《ARMY UFGS-12 35 70-2010 MEDICAL AND DENTAL CASEWORK.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-12 35 70-2010 MEDICAL AND DENTAL CASEWORK.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-12 35 70 (August 2010)-Preparing Activity: USACE SupersedingUFGS-12 35 70 (February 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 12 - FURNISHINGSSECTION 12 35 70MEDICAL AND DEN
2、TAL CASEWORK08/10PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 SUSTAINABLE DESIGN CERTIFICATION1.4 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 CASEWORK2.1.1 Medical Casework2.1.2 Dental Casework2.1.3 Dental Prosthetics Casework2.1.4 Countertops2.2 PLUMBING FIXTURESPART 3 EXECUTION3.1 INSTALLAT
3、ION3.1.1 Wall Hung Cabinets3.1.2 Floor Mounted Cabinets3.1.3 Countertops3.2 INSPECTION AND CLEANING- End of Section Table of Contents -SECTION 12 35 70 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-12 35 7
4、0 (August 2010)-Preparing Activity: USACE SupersedingUFGS-12 35 70 (February 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 12 35 70MEDICAL AND DENTAL CASEWORK08/10*NOTE: This guide specification covers the requirements for metal and wood ca
5、sework for medical and dental facilities.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, wh
6、ether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended
7、changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This specification covers metal and wood casework, normally preassembled, for installation as fixed or built-in elements in medical and dental facilities. The “casework“ includes: Cabinets, singularly or i
8、n assemblies; treatment room units wardrobes; deck units; reagent racks; countertops and sink; plus their components; hardware and service fixture trim. All casework must be shown on the drawings.A schedule of casework, shown in alpha-numerical order, will be included on the drawings. Schedules will
9、 include the Joint Schedule Number (JSN) designator, and dimensions. The schedule or SECTION 12 35 70 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-elevations should indicate the number of shelves required. Joint Schedule Numbers (JSN) or the
10、 National Stock Numbers are specified in MIL-STD-1691. Any additional specially required casework items which are not covered by MIL-STD-1691 should be described herein and identified on the drawings and schedule.On the drawings, show:1. Sizes and spacing of casework units, plumbing fixtures and uti
11、lity outlets.2. Schedule of casework including all component parts and accessories.3. Details of connections and anchorage where special conditions exist. Size and spacing of anchors.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. T
12、he publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the
13、Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications list
14、ed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 920 (2008) Standard Specification for Elastomeric Joint SealantsGREENGUARD ENVIRONMENTAL INSTITUTE (GEI)GEI Greenguard S
15、tandards for Low Emitting ProductsSECTION 12 35 70 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SCIENTIFIC CERTIFICATION SYSTEMS (SCS)SCS Scientific Certification Systems (SCS)Indoor AdvantageU.S. DEPARTMENT OF DEFENSE (DOD)MIL-STD-1691 (199
16、4; Rev F) Construction and Material Schedule for Military Medical and Dental Facilities1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be
17、 kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contr
18、actors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicat
19、e the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. C
20、odes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not hav
21、ing a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Sho
22、p DrawingsApproved Detail Drawings; G; G, _Drawings showing layout of casework at 1:20 3/4 inch equals one SECTION 12 35 70 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-foot scale. Indicate details of construction and rough-in requirements.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS1235702010MEDICALANDDENTALCASEWORKPDF

链接地址:http://www.mydoc123.com/p-449624.html