1、*USACE / NAVFAC / AFCESA /NASA UFGS-09 69 13 (August2010)-Preparing Activity: USACE SupersedingUFGS-09 69 13 (April 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 69 13RIGID GRID ACCESS FLOOR
2、ING08/10PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Allowable Tolerances1.2.2 Floor Panels1.2.3 Stringers1.2.4 Pedestals1.2.5 Bonding Strength of Pedestal Adhesive1.2.6 Bond Strength of Factory Installed Covering1.2.7 Seismic Calculations1.2.7.1 Navy Requirements1.2.7.2 Army Requirements
3、1.2.8 Air Leakage1.2.9 Grounding1.2.9.1 Metal Grilles1.2.9.2 Joint Resistance1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Delivery1.5.2 Storage1.5.3 Handling1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 FLOOR PANELS2.1.1 Floor System Drawings And Planer Quality2.1.2 Panel Cons
4、truction2.1.2.1 Aluminum2.1.2.2 Hollow Formed Steel2.1.2.3 Metal-Clad Cementitious Fill (Composite Panels)2.1.2.4 Metal-Clad Wood Core2.1.2.5 Lightweight Concrete PanelsSECTION 09 69 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.3 Floo
5、r Covering2.1.3.1 High Pressure Laminate2.1.3.2 Conductive Surfacing2.1.3.3 Conductive High Pressure Laminate2.1.3.4 Vinyl Composition Tile2.1.3.5 Carpet2.1.4 Edge Strip2.1.5 Accessories2.1.6 Resilient Base2.1.7 Lifting Device2.2 PANEL SUPPORT SYSTEM2.2.1 Pedestals2.2.2 Stringers2.3 FASCIA2.4 STEPS
6、AND RAMPS2.4.1 Steps2.4.2 Ramps2.5 RAILINGS2.6 FACTORY TESTS2.6.1 Load Tests2.6.2 Bond Strength of Covering2.7 COLOR2.8 REGISTERS AND GRILLES2.9 PERFORATED AIR SUPPLY PANELS2.10 CUT OUTS2.11 EDGE CLOSUREPART 3 EXECUTION3.1 INSTALLATION3.1.1 Preparation for Installation3.1.2 Pedestals3.1.3 Stringers3
7、.1.4 Auxiliary Framing3.1.5 Panels3.1.6 Resilient Base3.1.7 Fascia Plates3.1.8 Repair of Zinc Coating3.2 FIELD TESTS3.2.1 Acceptance Tests3.2.2 Electrical Resistance3.3 CLEANING AND PROTECTION3.3.1 Cleaning3.3.2 Protection3.3.3 Surplus Material Removal3.4 FIRE SAFETY3.5 SEISMIC SPECIAL INSPECTION AN
8、D TESTING3.6 OPERATION AND MAINTENANCE MANUALS- End of Section Table of Contents -SECTION 09 69 13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA /NASA UFGS-09 69 13 (August2010)-Preparing Activity: USACE SupersedingUF
9、GS-09 69 13 (April 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 09 69 13RIGID GRID ACCESS FLOORING08/10*NOTE: This Guide Specification covers the requirements for rigid grid access flooring.Edit this guide specification for each project sp
10、ecific requirements by adding, deleting, or revising text. Choose applicable bracketed items(s) or insert appropriate information.Remove information and/or requirements not related to the respective project, whether or not brackets are present.Comments and suggestions on this guide specification are
11、 welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*N
12、OTE: This specification does not include the floor upon which the elevated floor is superimposed, except to define the nature and condition of the supporting floor.Access flooring systems include floor panels, pedestals and items such as stringers, steps, ramps, closures and trim. Access flooring sy
13、stems must be designed to accommodate static, rolling and impact loadings.None of the mechanical and electrical services essential to the operation of equipment are included. Coordinate with mechanical and electrical SECTION 09 69 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking p
14、ermitted without license from IHS-,-,-to provide ventilation and cable openings which will be required.The designer is responsible for identifying and defining requirements for the floors. Drawings must indicate location and limits of the flooring systems, finish floor elevation, panel size, type, f
15、inish and anti-static provisions, colors, pedestal mounting and subfloor connection system details.STRINGERLESS ACCESS FLOORING is covered in SECTION 09 69 19.Stair and/or ramp information, such as tread width and riser height for stairs and width, slope and length of ramps, including railings, are
16、included in this section.Ancillary components such as floor diffusers and grills, fascias and floor opening trims are also included.Seismic loadings and any other information required to indicate the extent of work must be considered in designing access flooring systems.There are three fundamental c
17、onditions relative to the design of access flooring installations:Condition I Floors are completely surrounded by building walls. These are the most resistant to seismic loadings.Condition II Floors have part of the edge exposed and not restrained by other structural elements. Condition II floors ar
18、e less resistive to seismic loadings along the axis of the unconstrained side. Seismic loadings can be resisted by securing the perimeter panels of all floors to the supporting structural framing and fitting the panels tightly together, or by cross bracing the structural frame to resist overturning.
19、 The designer must select fascia type and finish for exposed edges.Condition III Floors are free standing without lateral contact with other structural elements. Type III floors are primarily strengthened with cross bracing to resist lateral loads.Buildings not excluded by UFC 3-310-02A or TI 800-01
20、 Design Criteria will be accessible in accordance with 36 CFR, Part 1191, Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities.On the drawings, show:1. Extent and shape of access flooring area. Include details of panel-to-panel and panel-to-wall SECTION 09 69 1
21、3 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-intersections, edge treatment at openings, expansion joints, elevation(s) above structural floor, and other special features of the elevated floor system.2. Location and design of ramps, steps,
22、and doors to access floor area; railing heights and design.3. Location and sizes of registers, grilles, perforated panels, and cable openings through access floor panels.4. Design and type of plenum fire extinguishing systems, if space under access floor is to be used as air plenum.5. Layout of plen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0969132010RIGIDGRIDACCESSFLOORINGPDF

链接地址:http://www.mydoc123.com/p-449602.html