ARMY UFGS-09 64 23-2010 WOOD PARQUET FLOORING.pdf
《ARMY UFGS-09 64 23-2010 WOOD PARQUET FLOORING.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-09 64 23-2010 WOOD PARQUET FLOORING.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 64 23 (August 2010)-Preparing Activity: USACE SupersedingUFGS-09 64 23 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 64 23WOOD PARQUET FLOORING08
2、/10PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 SUSTAINABLE DESIGN CERTIFICATION1.4 DELIVERY, STORAGE, AND HANDLING1.5 ENVIRONMENTAL REQUIREMENTS1.6 SCHEDULING1.7 WARRANTYPART 2 PRODUCTS2.1 FLOORING MATERIALS2.1.1 Laminated Block Flooring2.1.2 Slat Block Flooring2.1.3 Solid Block Flooring2.1.3.1 Gr
3、ading2.1.3.2 Construction2.1.3.3 Dimensions2.1.3.4 Moisture Content2.1.3.5 Finish2.1.4 Premolded Cork Strips2.1.5 Accessories and Supporting Materials2.1.5.1 Wax Finish2.1.5.2 Asphalt Saturated Felt2.1.5.3 Adhesive2.1.5.4 Primer2.1.5.5 Shoe Molds2.2 FLOORING SYSTEMS2.2.1 Flooring on Concrete Slabs2.
4、2.2 Flooring on Subflooring UnderlaymentPART 3 EXECUTION3.1 PREPARATION OF SURFACES3.1.1 Concrete SlabsSECTION 09 64 23 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.2 Underlayment Subflooring3.1.3 Adhesive-Applied Wood Flooring on Concre
5、te Slab3.1.4 Nailed Wood Flooring on Subflooring Underlayment3.1.5 Adhesive-Applied Wood Flooring on Subflooring Underlayment3.2 INSTALLATION3.2.1 Flooring on Concrete Slabs3.2.2 Flooring on Subflooring Underlayment3.2.3 Expansion Spaces3.2.4 Shoe Molds3.3 SANDING AND FINISHING SLAT SOLID BLOCK FLOO
6、RING3.3.1 Sanding3.3.2 Finishing3.4 PROTECTION- End of Section Table of Contents -SECTION 09 64 23 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 64 23 (August 2010)-Preparing Activity: USACE Superseding
7、UFGS-09 64 23 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 09 64 23WOOD PARQUET FLOORING08/10*NOTE: This guide specification covers the requirements for wood parquet flooring systems.Edit this guide specification for project specific
8、requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are w
9、elcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOT
10、E: On the drawings, show:1. Location and extent of wood parquet flooring.2. Where flooring is to be installed on concrete slab, indicate elevation of the top(s) of concrete slab.3. Locations of equipment, columns, and other permanent obstructions adjoining flooring and around which flooring is to be
11、 laid.4. Floor pattern that differs from conventional checkerboard pattern and is not defined by file sample.SECTION 09 64 23 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-5. Profile of shoe mold.*1.1 REFERENCES*NOTE: This paragraph is used t
12、o list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the
13、Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to r
14、econcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.APA - THE ENGINEERED WOOD ASSOCIATION (APA)APA E30 (2005) Engineered Wood Constru
15、ction GuideASTM INTERNATIONAL (ASTM)ASTM D 226/D 226M (2009) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and WaterproofingASTM E 1333 (1996; R 2002) Determining Formaldehyde Concentrations in Air and Emission Rates from Wood Products Using a Large ChamberASTM E 648 (200
16、9a) Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy SourceGREENGUARD ENVIRONMENTAL INSTITUTE (GEI)GEI Greenguard Standards for Low Emitting ProductsHARDWOOD PLYWOOD AND VENEER ASSOCIATION (HPVA)HPVA EF (2009) American National Standard for Enginee
17、red Wood FlooringSECTION 09 64 23 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NOFMA: THE WOOD FLOORING MANUFACTURERS ASSOCIATION (NOFMA)NOFMA Grading Rules (1999) Official Flooring Grading RulesSCIENTIFIC CERTIFICATION SYSTEMS (SCS)SCS Scie
18、ntific Certification Systems (SCS)Indoor Advantage1.2 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for ade
19、quate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only a
20、dd a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for
21、Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0964232010WOODPARQUETFLOORINGPDF
