1、*USACE / NAVFAC / AFCESA / NASA UFGS-07 54 19 (February 2013)-Preparing Activity: USACE SupersedingUFGS-07 54 19 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2013*SECTION TABLE OF CONTENTSDIVISION 07 - THERMAL AND MOISTURE PROTECTIONSECTIO
2、N 07 54 19POLYVINYL-CHLORIDE ROOFING02/13PART 1 GENERAL1.1 REFERENCES1.2 SUMMARY1.3 ASSEMBLY REQUIREMENTS1.3.1 Fire Resistance1.3.2 Wind Uplift Resistance1.3.3 Solar Reflectance Index (SRI)1.4 SUSTAINABILITY REQUIREMENTS1.4.1 LEED REQUIREMENTS1.4.2 EPA Comprehensive Procurement Guidelines1.4.3 USDA
3、Biobased1.5 SUBMITTALS1.6 QUALITY ASSURANCE1.6.1 Qualification of Manufacturer1.6.2 Qualifications of Applicator1.6.3 Qualifications of Photovoltaics (PV) Rooftop Applicator1.6.4 Qualification of Engineer of Record1.6.5 Conformance and Compatibility1.6.6 Preroofing Conference1.7 DETAIL DRAWINGS1.8 D
4、ELIVERY, STORAGE, AND HANDLING1.8.1 Delivery1.8.2 Storage1.8.3 Handling1.9 ENVIRONMENTAL REQUIREMENTS1.10 SEQUENCING1.11 WARRANTY1.11.1 Roof Membrane Manufacturer Warranty1.11.2 Roofing System Installer Warranty1.11.3 Continuance of WarrantyPART 2 PRODUCTS2.1 MATERIALS2.1.1 Bonding AdhesiveSECTION 0
5、7 54 19 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.2 Water Cutoff Mastic/Water Block2.1.3 Membrane Flashing2.1.4 Membrane Fasteners and Plates2.1.4.1 Stress Plates, Bar or Rail for Fasteners2.1.4.2 Auxiliary Fasteners2.1.5 Protection M
6、at2.1.6 Pre-manufactured Accessories2.1.7 PVC Walk Tread2.1.8 Elevated Metal Walkways and Platforms2.1.9 Roof Insulation2.1.10 Wood Products2.2 Reinforced, PVC Membrane2.3 PHOTOVOLTAIC (PV) SYSTEMS - RACK MOUNTED SYSTEMS2.4 COOL ROOFSPART 3 EXECUTION3.1 CONCRETE SURFACE DRYNESS3.2 EXAMINATION3.3 APP
7、LICATION METHOD3.3.1 Special Precautions3.3.2 PVC Roofing Membrane3.3.2.1 Nailing3.3.2.2 Flashing3.3.2.3 Expansion Joints3.3.2.4 Cutoffs3.3.2.5 Walkways3.3.3 Adhered Membrane Application3.3.4 Mechanically Fastened Membrane Application3.3.5 Perimeter Attachment3.3.6 Securement at Base Tie-In Conditio
8、ns3.3.7 Pre-fabricated Curbs3.3.7.1 Set-On Accessories3.3.8 Roof Walkways3.3.9 Elevated Metal Walkways and Platforms3.3.10 Isolated Paver Blocks3.4 FLASHINGS3.4.1 General3.4.2 Membrane Flashing3.4.2.1 Installation3.4.2.2 Sealing3.4.3 Flashing at Roof Drain3.5 ROOF WALKPADS3.5.1 Elevated Metal Walkwa
9、ys and Platforms3.6 CORRECTION OF DEFICIENCES3.7 PROTECTION OF APPLIED ROOFING3.7.1 Water Cutoffs3.7.2 Temporary Flashing for Permanent Roofing3.7.3 Temporary Walkways, Runways, and Platforms3.8 FIELD QUALITY CONTROL3.8.1 Construction Monitoring3.8.2 Manufacturers Inspection3.9 CLEAN UP3.10 INSTRUCT
10、IONS TO GOVERNMENT PERSONNEL3.11 ROOF DRAIN TEST- End of Section Table of Contents -SECTION 07 54 19 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-07 54 19 (February 2013)-Preparing Activity: USACE Superse
11、dingUFGS-07 54 19 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2013*SECTION 07 54 19POLYVINYL-CHLORIDE ROOFING02/13*NOTE: This guide specification covers the requirements for reinforced polyvinyl chloride roofing membrane on both existing
12、and new roof systems with slopes from 6 mm to 76 mm (1/4 inch to 3 inches per foot).Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project s
13、pecific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for
14、this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This guide specification is intended for both new construction and reroofing installations. This guide specification is also applicable for use with a supplemental, chemical/grease-r
15、esistant PVC membrane for roof areas in need of additional roof protection such as adjacent to kitchen or food service exhaust system discharge ducts; consult PVC membrane roof system manufacturer for this application. Supplemental grease, chemical and oil-resistant PVC roofing membranes are availab
16、le.Coordinate this section with other roof system components specifications such as rough carpentry, insulation and sheet metal flashing. Also SECTION 07 54 19 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-coordinate this section with the cri
17、teria contained in UFC 3-110-03 Roofing, as it relates to the specific project and Service Exceptions indicated therein.PVC membrane roofing should not be adhered directly to polystyrene, perlite or standard wood fiber insulation. The compatibility of the system shall be verified by the membrane man
18、ufacturer. Glass mat andmoisture resistant gypsum roof board can be used as an overlayment above and in conjunction with the roof system insulation to impart improved wind, impact, and hail resistance.Reinforced PVC membrane roofing should not be used in direct physical contact with asphalt, coal ta
19、r pitches, nor petroleum-based products. For additional guidance on PVC roofing membrane and material compatibility, the designer should always consult the PVC roofing membrane manufacturer.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specifica
20、tion. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference
21、in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publicatio
22、ns listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)ANSI/SPRI ES-1 (2003) Wind Design Standard for Edge Systems Used with Low Slope Roofing SystemsAMERIC
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0754192013POLYVINYLCHLORIDEROOFINGPDF

链接地址:http://www.mydoc123.com/p-449571.html