ARMY UFGS-05 59 10-2010 ROLLING COVER FOR AVIATION REFUELING VAULTS《航空燃料添加室旋转盖》.pdf
《ARMY UFGS-05 59 10-2010 ROLLING COVER FOR AVIATION REFUELING VAULTS《航空燃料添加室旋转盖》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-05 59 10-2010 ROLLING COVER FOR AVIATION REFUELING VAULTS《航空燃料添加室旋转盖》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-05 59 10 (February 2010)-Preparing Activity: USACEUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 05 - METALSSECTION 05 59 10ROLLING COVER FOR AVIATION REFUELING VAULTS02/10PART 1 GEN
2、ERAL1.1 REFERENCES1.2 ADMINISTRATIVE REQUIREMENTS1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Welder Qualifications1.4.2 Workmanship1.4.3 Detail DrawingsPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Bolts and Cap Screws2.1.2 Nuts2.1.3 Washers2.1.4 Tube Steel2.1.5 Structural Steel2.1.6 Rolling Cover Sh
3、ell2.1.6.1 Aluminum2.1.7 Wheel Assemblies2.1.7.1 Wheels2.1.7.2 Axles2.2 FABRICATION2.2.1 General2.2.2 Dimensional Tolerances2.2.3 Steel2.2.4 Aluminum2.2.5 Bolted Connections2.2.5.1 Bolted Steel Connections2.2.5.2 Bolted Aluminum Connections2.3 MACHINE WORK2.3.1 Finished Surfaces2.3.2 Unfinished Surf
4、aces2.4 WELDING2.4.1 Welding of Structural Steel2.4.2 Welding of AluminumSECTION 05 59 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.4.3 Welding Inspection2.4.3.1 Visual Examination2.4.4 Steel Welding Repairs2.5 MISCELLANEOUS PROVISIONS2
5、.5.1 Metallic Coatings2.5.2 Cleaning of Stainless Steel2.6 SHOP TESTING2.6.1 Wheel Assembly Testing2.6.2 Assembly Tests2.7 PREPARATION FOR SHIPPINGPART 3 EXECUTION3.1 ASSEMBLY3.2 PROTECTION OF FINISHED WORK3.2.1 Lubrication After Assembly3.2.2 Aluminum3.3 ACCEPTANCE TESTING- End of Section Table of
6、Contents -SECTION 05 59 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-05 59 10 (February 2010)-Preparing Activity: USACEUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated
7、 April 2010*SECTION 05 59 10ROLLING COVER FOR AVIATION REFUELING VAULTS02/10*NOTE: This guide specification covers the requirements for custom fabricated rolling covers installed on new or existing aircraft refueling system vaults constructed to the requirements of the DoD Type III/IV/V, and Cutn Co
8、ver Hydrant Refueling System Standards DoD Type III systems shall conform to Standard Design 078-24-28 PRESSURIZED HYDRANT FUELING SYSTEM (TYPE III). DoD Type IV/V systems shall conform to Standard Design 078-24-29 AIRCRAFT DIRECT FUELING SYSTEM (TYPE IV) DESIGN.Edit this guide specification for pro
9、ject specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestion on this specificatio
10、n are welcome and should be directed to the technical proponent of the specification. A listing of the technical proponents, including their organization designation and telephone number, is on the Internet.*PART 1 GENERALThis specification covers the factory fabrication, assembly, testing, and ship
11、ping requirements for custom fabricated rolling covers having steel or aluminum shells as indicated in vault schedule on the vault drawings. Covers are to be field installed by other than the manufacturer on variously sized new and/or existing hydrant fueling system vaults and tanks.1.1 REFERENCES*N
12、OTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in SECTION 05 59 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the text by basic designation only and liste
13、d in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to up
14、date the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The public
15、ations are referred to in the text by basic designation only.ALUMINUM ASSOCIATION (AA)AA ADM-105 (2005; Errata 2005) Aluminum Design ManualAMERICAN WELDING SOCIETY (AWS)AWS D1.1/D1.1M (2008; Errata 2008) Structural Welding Code - SteelAWS D1.2/D1.2M (2008) Structural Welding Code - AluminumASME INTE
16、RNATIONAL (ASME)ASME B4.1 (1967; R 2009) Preferred Limits and Fits for Cylindrical PartsASME B46.1 (2002) Surface Texture, Surface Roughness, Waviness and LayASME BPVC SEC IX (2007; Addenda 2008; Addenda 2009) Boiler and Pressure Vessel Code; Section IX, Welding and Brazing QualificationsASTM INTERN
17、ATIONAL (ASTM)ASTM A 123/A 123M (2009) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel ProductsASTM A 276 (2008a) Standard Specification for Stainless Steel Bars and ShapesASTM A 307 (2007b) Standard Specification for Carbon Steel Bolts and Studs, 60 000 PSI Tensile S
18、trengthASTM A 36/A 36M (2008) Standard Specification for Carbon Structural SteelSECTION 05 59 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM A 500/A 500M (2009) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel St
19、ructural Tubing in Rounds and ShapesASTM A 563 (2007a) Standard Specification for Carbon and Alloy Steel NutsASTM B 209 (2007) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate1.2 ADMINISTRATIVE REQUIREMENTSSubmit manufacturers catalogue cuts and dimensional sheets. Include a de
20、scription of the item, materials of construction, and dimensions. Provide data sufficient to indicate compliance with specifications. Mark items pertaining to specifications with a heavy black arrow.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROC
21、EDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked wi
22、th a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects,
23、 a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other orga
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0559102010ROLLINGCOVERFORAVIATIONREFUELINGVAULTS 航空 燃料 添加 旋转 PDF

链接地址:http://www.mydoc123.com/p-449565.html