《ARMY TM 5-824-4-1966 AIRFIELDS OTHER THAN ARMY AIRFIELD OPERATIONAL AND MAINTENANCE FACILITIES REPRINT INCORPORATES CHANGE 1《非军用机场的机场运营和维护设施 再版合并变更1》.pdf》由会员分享,可在线阅读,更多相关《ARMY TM 5-824-4-1966 AIRFIELDS OTHER THAN ARMY AIRFIELD OPERATIONAL AND MAINTENANCE FACILITIES REPRINT INCORPORATES CHANGE 1《非军用机场的机场运营和维护设施 再版合并变更1》.pdf(84页珍藏版)》请在麦多课文档分享上搜索。
1、C-/5- Marking of Serviceable Runways and Taxiways. for marking materials and the policy for marking and re-marking serviceable runways and taxiways at Air Force and Air National Guard installations. Appendix I contains the prescribed standard specifications b. Marking of Deceptive, Closed and Hazard
2、 Areas on Airports. Appendix I contains the prescribed s%andar specifications for marking materials and the policy for marking of surfaces on aircraft movement areas which are not intended for aircraft traffic at Air Force and Air National Guard installations. 4. LIGHTING AND MARKING OF CE!STRUC!TON
3、S TO AIR NAVIGATION. F. struction Lighting. Force policy for lighting of obstructions to air navigation at Air Force Appendix III contains the prescribed standards andAir and Air National Guard installations. b. Obstruction brking. Appendix IV describes the standard ob- structior, marking colors and
4、 states the policy for the initial painting or repainting of objects which are to be marked as obstructions to air naviga- tion at Air Force and Air National Guard installations. 5. AIRFIELD LIGHTING. Appendix V sets forth the technical info-ma- tion for design, installation, construction, operation
5、, and maintmance of visual air navigation facilities at Air Force and Ai?. National Guard installations. 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-= 3515789 02220q3 602 = EM 1110-45-305 29 Apr 61 6. JOINT SPACING AND PAVEMENT DESIGN, HEAVY-OA
6、D PARKING APRONS WITH MULTIPLE FUELING OUTIJETS. spacing and pavement design for heavy-load operational parking aprons con- taining multiple fueling outlets at Air Force installations. Appendix VI contains the details for joint 7. TIE-DCIWN ANCHORS, AIRCRAFT PARKING AREAS. Appendix VI1 contains the
7、prescribed standard specifications for material to be used for and spacing of tie-down anchors in aircrafi parking areas at Air Force and Air National Guard installations. 8. AIRCRAFT WASHRACKS. Appendix VI11 contains technical information for the design of the portland-cement concrete paved area an
8、d the necessary appurtenances for washing and cleaning of aircraft at Air Force and Air National Guard installations. 9. FIRING-IN-BUTT AND CALIBRATION HAHISTAND. Appendix IX firniches technical information for the design of the firing-in-butt, calibration hardstand, and target storage building at A
9、ir Force installations. The criteria for design of firing-in-butts for Air National Guard installations are also included in this appendix. 10. AIRGRAFT-ARRESTING BARRTERS. Appendix X contains technical in- formation for the installation of overrun barriers near or at runway ends at Air Force and Ai
10、r National Guard installations. 11. PWER-CHECK PADS. Appendix XI contains technical information for the design of power-check pads at Air Force and Air National Guard installations. 12. INSTALLATION DETAILS FOR NARROW GAUGE AND PANCAKE CENTERLINE LIGHTING SYSTEMS: for the design of narrow gauge and
11、pancake centerline lighting systems at Air Force installations. Appendix XII contains technical and installation details 2 3598 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. 3535789 02220q2 547 m EM 1110-45-305 Appendix I 29 Apr 61 APPENDIX I MAR
12、KING OF SERVICEABBLE RITNWAYS AND TAXIWAYS 1. GDERAL. The provisions contained herein, extracted from AFR 91-17, are the standard specifications for marking materials, and prescribe Air Force and Air National Guard policy for the marking and re-marking of serviceable runways and taxiways at all Air
13、Force and Air National Guard installations. 2. DEVIATIONS. Prior approval of Headquarters, United States Air Force, and the Chief, National Guard Bureau, is required for markings other than those specified herein. 3. GEXERAL REQUIREMENTS. Nl compliance with the standards outlined herein is required
14、when runways and taxiways are to be marked or re-marked. Air Force Commanders of major air commands and the Chief, National Guard Bureau, have been delegated authority to determine the degree to which markings will be applied. 4. DETAL RIQUIRI3ENTS. a. Standard. The standard to be used in the markin
15、g and re-marking of serviceable runways and taxiways is set forth in the National Standard for the Marking of Serviceable Runways and Taxiways, dated 26 August 26 August 1960, contained in EM 1110-3-314 and AFR 91-17. 1960, approved by the Air Coordinating Committee on b. Marking Materials. Paint us
16、ed for the marking and re-marking of airfieid runways and taxiways will conform to the following specifications: (i) Runways. Relfective white paint, see Interim Federal Specification TT-P-mnD) , Paint Reflective for Airfield Runway Marking (Drop-In-Type) 23 September i959 with Amendment 1 dated 4 F
17、ebruary i960 and TT-G-00490 (Navy-WS) , Granules Reflectorized, 15 January 1960. (2) Taxiways. Nonreflective ye;low paint shall consist of the pigmented binder (paint)covered by Specification TT-P-0085 (DOD) as amended. c. Application of Marking Materials Painted marking will be applied t paved area
18、s only after the pavements have been allowed to cure thoroughly. and clean prior to painting. When applying painted markings to rigid pave- ments that have been cured with a membrane-type curing compound, the curing compound must be thoroughly cleaned from the surf and to prevent undue softening of
19、the bitumen by the paint, Care will be taken to insure that the pavement surface is dry 3593 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3535787 0222043 Y85 EM UO-45-305 Appendix I 29 Apr 61 the maximum drying time requirements of the paint speci
20、fications will be strictly enforced. d. Runway Marking Requirements. Minimum markings will be the Instrumen% Runway as shown on AGA-SD2a, SD-1. determined by operational requirements of the major comand. Runways will be marked as 2 Provided by IHSNot for ResaleNo reproduction or networking permitted
21、 without license from IHS-,-,-m 3535789 0222044 333 rn APPENDIX II EM UO-45-35 29 Apr 61 Appendix II MARKING OF DECEPTIVE, CLOSED AND HAZARD AREAS ON AIRPORTS 1. GENERAL. The provisions contained herein govern the initial marking ard remarking of all deceptive, closed and hazard areas on airports at
22、 all Air Force and Air National Guard installations 2. DEVIATIONS. Prior approval of Headquarters, U. S. Air Force, and the Chief, National Guard Bureau, is required for marking other than those specified herein. 3. EXCEPTIONS. Commanders of major Air Comnds and the Chief, National Guard Bureau, are
23、 authorized to waive the provisions of these instructions for installations where the presence of highly conspicuous markings would compromise established USAF security policy. Serviceable Runways and (Taxiways. 4. REFERENCE. 91-17, National Standard for the Marking of (Also see Appendix I. ) 5. GEN
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYTM582441966AIRFIELDSOTHERTHANARMYAIRFIELDOPERATIONALANDMAINTENANCEFACILITIESREPRINTINCORPORATESCHANGE1

链接地址:http://www.mydoc123.com/p-449489.html