ARMY MIL-W-64044-1983 WARHEAD 2 75 INCH ROCKET M261 AND M267 PARTS FOR《M261和M267型2 75英寸火箭弹头零件》.pdf
《ARMY MIL-W-64044-1983 WARHEAD 2 75 INCH ROCKET M261 AND M267 PARTS FOR《M261和M267型2 75英寸火箭弹头零件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-W-64044-1983 WARHEAD 2 75 INCH ROCKET M261 AND M267 PARTS FOR《M261和M267型2 75英寸火箭弹头零件》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、-1 i - MIL-W-64044 (AR) 7 CIl3ER 1983 MILITARY SPEC I FI CATI ON WARHEAD, 2.75 INCH ROCKET, M261 AND M267, PARTS FOR This specification is approved for use by the U.S.-Army Armament Research and Development Cmmand, and is available for use by all Departments and Agencies of the Department of Defense
2、. 1. SCOPE 1.1 This specification covers the quality assurance provisions and special requirements not covered by the drawings for metal parts and assemblies of the M261 and M267 Multipurpose Submuni tion (MPSM) Warheads. 2. APPLICABLE DOCUMENTS 2 .l Government - documents. 2.1.1 Specifications and
3、standards. Unless otherwise specified (see 6.2), the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification to the extent speci f i ed herein
4、. SPEC1 FI CATIONS MILITARY MIL-A-4 8078 Ammunition, Standard Quality Assurance Provisions, General Specification for STANDARDS MILITARY MIL-STD- MIL-STD- MIL-STD- 105 Sampling Procedures and Tables for I ns pec tion by at t ri but es 1167 Ammunition Data Cards 1169 Packaging, Packing, and Marking f
5、or Shipment of Inert Ammunition Cmponents R FSC 1340 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Arm Armament Research and Development Center, Attn. Pronosal (DD Form 1426) app
6、earing at the end of this THIS DOCUMENT CONTAINS 23 PAGES. Lrsey 07801 by using the self-addressed Standardization -IFff _4-_ -/ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-64043 (AR) 2.t.2 Other Government documents, drawings and publicati
7、ons. The following other Government documents, drawings and publications form a part of this specification to the extent specified herein. DRAW I NGS US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND (ARRADCOM) PRODUCT DRAWINGS 9 3 3 4 1 I. 9 Cone, Nose Assembly 9 3 34 127 Plug, Base Assembly 933412
8、8 Cover, Expulsion Charge 9 3 3 4 129 Support, Fuze 9334131 Warhead Case and Nose Cone Base Assembly 9334135 Plate, Pusher 9 3 3 4 14 1- Spring , Conical I- (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition f
9、unctions should be obtained from the contracting activity or as directed by the contracting officer.) 2.Y.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specification shall take precedence. 3. REQUIREMENTS I
10、3.1. Materials. Materials shall be in accordance with the applicable drawings and specifications. e 3.2 Components and assemblies. The components and assemblies shall camply with all requirements specified on Drawings 9334119, Q334J.27, 9334128, 9334129, 9334133., 9334135, and 9334141 and associated
11、 drawings and with all requirements specified in applicable specifications and standards. 3.3 First, article inspection. This specification makes , Drovision for first article inspection. Requirements for submission of first article samples by the contractor shall be as specified in the contract. I
12、2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-bqOLlq 13 W 9799906 03538i11 7 MIL-W-64044 (AR) 3.3.1 Process specification - molded or cast parts. When a multiple cavity mold is used in the fabrication o plastic or die cast components, a min
13、imum of five (5) canponents from each mold cavity shall be included in the first article sample. The components shall bear a mark which identifies the ccmponent with the individual cavity . 3.4 Piorkmanshig 3.4.1 Mechanical. Unless otherwise specified on the drawing, all parts and assemblies shall b
14、e free from burrs, chips, sharp edges, cracks, unblended radii, surface defects, dirt, grease, rust, porosity , warpsge, burn marks , checks, blisters, excess flash, corrosion products and other foreign matter . The cleaning method used shall not be injurious to any part nor shall the parts be conta
15、minated by the cleaning agents. Surface coating shall be continuous except or a few slight scratches not exposing base material. The loading and assembly operations shall be performed in a thorough, workmanlike manner consistent with the best practices of the industry. All required markings shall k
16、neat and legible . 3.4.2 Electrical. Cable assemblies and wires shall bz dressed in such manner as to prevent pinching or chafing of the wire insulation. Ends of wires shall bs free from flux, chips, dirt, grease, rust or foreign material. 4. ;ZUALITY ASSUAANCE PROVISIONS 4.1 Responsibility for i ns
17、prction . Unless otherwise suecified in tne contract. the contractor is resmnsible for the performance of all inspection requirements as specified herein . Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspzc
18、tion requirements specified herein, unless disappproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to preacriixd requirements. Unless otherwi
19、se specified herein or in the contract, the provisions of MIL-A-48078 shall. apply and are made a part of this specification. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL -W- 6 4 O 4 4 ( AR) 4.2 Classification of inspections Unless otherwise
20、 specified herein, or in the contract, the-following types of inspection shall be conducted on this item: 4.3 a. First Article ncpzction b. Juality Conformance Inspection First article inspectiori 4.3.1 Subinission. The contractor shall submit a Eirst article sample as designated by the Contracting
21、Officer for evaluation in accordance with the provisions of 4.3.2. The first article sample shall consist of the following items in sample quantities as i ndi ca t ed: Pa r t D es cr i pt i on Drawing Quanti ty Spring, Conical Support, Fuze P1 ate , Pus her Bushing, Cable Sealing -se, Plug Cover, Ex
22、pul si on Charge Cone, Ncse Base, Nose Cone Base, Nose Cone Assy Cone, Nuse Assy Plug, Base Assy Warhead Case Warhead Case and Nose Cone Base, Assy 9334141 933 412 9 9334135 9334125 9334138 9334128 9334120 93 3 4 113 9334110 93 3 4 119 9334127 9334133 9334131 15 15 or 5/cavity w hi Che ver is gr eat
23、 er 15 or 5/cavity whichever is greater 10 15 10 15 or 5/cavity whichever is greater 15 or 5/ciivity whichever is greater 25 15 15 25 20 4.3.2 Inspections to be performed. See MIL-A-48078 and Table I specified herein. 4.3.3 Rejection. See MIL-A-48078. Provided by IHSNot for ResaleNo reproduction or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILW640441983WARHEAD275INCHROCKETM261ANDM267PARTSFORM261 M267 275 英寸 火箭 弹头 零件 PDF

链接地址:http://www.mydoc123.com/p-449174.html