ARMY MIL-W-60307 C-1987 WARHEAD 2 75 INCH ROCKET SMOKE WP M156 (METAL PARTS)《WP M156烟幕2 75英寸火箭弹头(金属零件)》.pdf
《ARMY MIL-W-60307 C-1987 WARHEAD 2 75 INCH ROCKET SMOKE WP M156 (METAL PARTS)《WP M156烟幕2 75英寸火箭弹头(金属零件)》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-W-60307 C-1987 WARHEAD 2 75 INCH ROCKET SMOKE WP M156 (METAL PARTS)《WP M156烟幕2 75英寸火箭弹头(金属零件)》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-W-b0307C 13 906 0337L147 4 = 23-37 -07 MIL-51-6 03 07C 20 March 1987 SUPERSEDING mL-W-O060307B( EA) 18 June 1973 MIL-W-60307A 20 July 1971 MILITARY SPECIFICATION WmHEAD, 2.75 INCH ROCKET, SMOKE, WP, 156 (METAL PARTS) This specification is approved for use within Chemical Research, Development an
2、d Engineering Center, and is avail- able for use by all Departments and Agencies of the Depart- ment of Defense . 1. SCOPE 1.1 Scope. rocket warhead. This specification covers-the metal parts for the Mi56 2.75 inch 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards.
3、 The following specifications and stan- dards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement ther
4、eto, cited in the solicitation, SPECIFICATIONS MILITARY MIL-P-116 - Preservation, Methods of. : Beneficial comments ( recommendations : : nent data which may be of use in improving this document should be addressed: : to: : : Center, ATTN: SMCCR-SFT-S, Aberdeen Proving Ground, MD 21010-5423 by using
5、: : the self-addressed Standardization Document Improvement Proposal (DD Form : : 1426) appearing at the end of this document or by letter. additions, deletions) and any perti- Commander, U.S. Army Chemical Research, Development and Engineering - AMSC N/A FSC 1340 DISTRIBUTION STATEMENT A. Approved
6、for public release; distribution is unlimited. O n t r THIS DOCUMENT CONTAINS y PAGES, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- - MIL-W-60307C STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by MIL-STD-1168 - Am
7、munition Lot Numbering. MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert Attribut es . Ammunition Components. 2.1.2 Drawings. The following drawings form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on
8、 the date of the solicitation. DRAWINGS U.S. ARMY CHEMICAL RESEARCHy DEVELOPMENT AND ENGINEERING CENTER 90-1-39 - Warhead, 2.75 Inch Rocket, Smoke, WP, M156 (Metal Parts). U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER 8837835 - Pallet for Projectile, Metal Parts. 8861520 - Marking
9、Diagram for Pallets for Projectile, 75MM to 120MM. ( Copies of specifications, standards , and drawings required by contractors in connection with specific acquisition functions should be obtained from the con- tracting activity or as directed by the contracting activity.) 2.2 Order of precedence. I
10、n the event of a conflict between the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or MS standards) , the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applica
11、ble laws and regulations unless a specific exemption has been obtained. 3 . REQUIREMENTS 3.1 Materials and components. All materials and components cited on Drawing 99-1-39 and subsidiar? drawings shall conform to the specifications listed thereon or to the specific characteristics set forth on the
12、drawings. 3.2 Assembly. All components shall be assembled in accordance with Drawing 90-1-39 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-W-60307C 13 0b 033747q MLL-W-OOC 3.3 Leakage and distortion. 3.3.1 Warhead (hydrostatic) . The warhead
13、 (Drawing 90-1-39) shall not leak or show evidence of distortion when subjected to an internal pressure of O S,OOO + 50 pounds per square inch gage (psig) for a period Of-5 to 7 seconds at ambient temperature when tested as specified in 4.4.4.i. 3.3.2 Warhead (air). The warhead accepted for hydrosta
14、tic leakage shall not leak air when subjected to an internal air pressure of 100 + 10 psig for a period of 15 to 20 seconds at ambient temperature when tested as specified in 4.4.4.2. 3.3.3 Burster tube casing. The burster tube casing shall not leak air when subjected to an internal pressure of 100
15、-I- 10 psig for a period of i5 to 20 seconds at ambient temperature when tested as specified in 4.4.4.3. 3.3.4 Brazed joint. When tested as specified in 4.4.4.4, the sectioned and peeled brazed joints shall be free of entrapped slag, unwetted areas, or unbonded areas, for a minimum of 50 pefcent of
16、the aggregate area of the faying surfaces. Half the area of the adapter joint may be excluded from examination. There shall be no leakage paths through the brazed joints. This will be assured by the presence of a bonded area not less than 1/8 inch wide that extends 360“ around each joint. 3.4 Prepro
17、duction. tion sample of warheads and burster.tube casings shall be produced in accor- dance with this specification for examination and test (see 4.3) . Prior to the start of regular production, a preproduc- The components shall be free from foreign matter (oil, damage such as dents, cracks or defor
18、mation. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the con- tract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. in the contract or purchase order, the contractor may use h
19、is own or any other facilities suitable for the performance of the inspection requirements speci- fied herein, unless disapproved by the Government. The Goverhent reserves the right t perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure
20、supplies and services conform to prescribed requirements. Except as otherwise specified 4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractrs overall inspection system or qua
21、lity program. The absence of any inspection requirements in the specification shall not 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-b0307C 13 m 77799Ob 0337500 O m MIL-W-60307C relieve the contractor of the responsibility of assuring that
22、 all products or supplies submitted to the Government for acceptance comply with all require- ments of the contract. mission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. Sampling in quality conformance does not author
23、ize sub- 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: (a) (b) Preproduction inspection (see 4.3) . Quality conformance inspection ( see 4.4) . 4.3 Preproduction inspection. 4.3.1 Sample. A preprolduction sample of i5 warheads and i5 burst
24、er tube cas- ings shall be manufactured using the same methods, materials, equipment, and processes as will be used during regular production. 4.3.2 Inspection procedure. 4.3.2.1 For examination and nondestructive tests. The preproduction samples shall be examined and tested in accordance with the c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILW60307C1987WARHEAD275INCHROCKETSMOKEWPM156METALPARTSWPM156 烟幕 275 英寸 火箭 弹头 金属 零件 PDF

链接地址:http://www.mydoc123.com/p-449148.html