ARMY MIL-W-48855 C (5)-1995 WARHEAD BODY ASSEMBLY FOR WARHEAD SECTION GM HE M258《M258型烈性炸药导弹弹头零件的整装弹头组装》.pdf
《ARMY MIL-W-48855 C (5)-1995 WARHEAD BODY ASSEMBLY FOR WARHEAD SECTION GM HE M258《M258型烈性炸药导弹弹头零件的整装弹头组装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-W-48855 C (5)-1995 WARHEAD BODY ASSEMBLY FOR WARHEAD SECTION GM HE M258《M258型烈性炸药导弹弹头零件的整装弹头组装》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、I INCH-POUND I MIL-W-48855C (AR) AMENDMENT 5 29 June 1995 SUPERSEDING AMENDMENT 4 28 FEBRUARY 1989 MILITARY SPECIFICATION WARHEAD BODY ASSEMBLY FOR WARHEAD SECTION, GM, HE, M258 This amendment forms a part of Military Specification MIL-W-48855C (AR), dated 17 May 1985, and is approved for use by the
2、 US Army Armament, Research, Development and Engineering Center, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 2.1.1, STANDARDS: Add the following: II FEDERAL FED. TEST METHOD STD. No. 151 -Metals; Test Methods“ 2.1.2, Drawings: Add the following: “929
3、7072 -Preform, Powder Metal I PAGE 3 3.4, Add the following: “Isolation with warhead case and P3-9/P3-2 shorted 1 meg ohm“. 3.5: Delete in its entirety and substitute the following: “3.5 Process control document. The contractor shall supply a process control document which is to include descriptions
4、 of all production processes, procedures and equipment (including in-process inspection equipment) used to manufacture and inspect the production material. These descriptions shall identify the basic fabrication process, fabrication equipment (including methods for evaluating status of equipment), c
5、ontrols associated fabrication processes and in-process 1 of 8 FSC 1336 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-48855C (AR) AMENDMENT 5 inspections. All i
6、nitial and revised process control documents shall be submitted to the technical office for review and approval of completeness prior to its use in production (see 6.4). It should be noted that it is not the governments intention to approve the contractors process itself, but merely to review the co
7、mpleteness and adequacy of the process control document. I The contractor shall make available, at the time of government inspection, all data necessary to show compliance to the process control document (i.e. Temperatures, Pressures, Times, Speeds, Weights, etc. ) . I 3.7, line 5: Add the following
8、 after cracks, I, porosity“. * 3.7, Add the following to the end of paragraph: “Any J1 connector (part number 9282706) that exhibits a crack with physical separation of the shell material, without the aid of any magnification, will not be acceptable.“ PAGE 7 4.4.1, Sentence 4: Delete in its entirety
9、 and substitute: “Additionally, preform lot size shall be limited to the quantity sintered in a single oven at one time, and for a batch process, shall be limited to a single batch.I 4.4.2, b.: Delete column labeled DENSITY* and substitute: “DENSITY* 10% of lot/ minimum 10% of lot 10% of lot 10% of
10、lot“ PAGE 8 4.4.2, c: Delete column labeled DENSITY* and substitute: “DENSITY* 5% of lot/ minimum 5% of lot“ 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-48855C (AR) AMENDMENT 5 PAGE 10 4.4.2.2: Add new major categories in the appropriate
11、columns as follows: “Category Exam AQL or Req. Para Ref. Maior Q.Lk% 100% Para. Insn. Meth. 109 Presence of threads 100% 3.1 Gage in connector center pin. * 110 Torque test of 0.40% 3.1 Gage electrical plug connector. II PAGE 11 4.4.2.4: Add new categories in the appropriate columns as follows: “Cat
12、egory Exam AQL or Req. Para Ref. / Maior or Test 100% Para, InsD. Met.h, 105 Chemical analysis (PMP) L/ 3.1 4.5.10“ 4.4.2.4: Add new note as follows: “L/ A chemical analysis shall be performed on each lot.11 PAGE 13 4.4.2.5, Major 106: Delete “FWD and AFT threads“ and substitute II AFT threads and A
13、FT face“. 4.4.2.5, Major 111: Delete “FWD and AFT threads“ and substitute “AFT threads and AFT face“. 4.4.2.5, Major 112: Delete “FWD and AFT threads“ and substitute “AFT threads and AFT face“. PAGE 15 4.4.2.5, Major 137: Delete I- and substitute + 4.4.2.5, Major 141: Delete “.O10 and substitute “.0
14、02“. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-W-48855C (Al?) AMENDMENT 5 PAGE 16 4.4.2.5, Minor 208: Delete I+“ and substitute I+. PAGE 19 4.5.1.2: Delete in its entirety and substitute the following: “4.5.1.2 powder metal meform The tes
15、t specimens for a warhead lot that are to be machined from powder metal preforms shall be obtained from one of the following methods. a. All specimens from the first method are obtained from the sidewall of the powder metal preform. The test specimens shall be produced to such dimensions so that yie
16、ld and impact test bars shall be machined to the form and dimensions shown in figures 4 and 5. Two test specimens of each type shall be machined from each body. b. The yield specimens shall be obtained from the sidewall while the impact specimens shall be obtained from the base of the powder metal p
17、reform. The test specimens shall be produced of such dimensions so that the yield and impact test bars shall be machined to the form and dimensions shown in figures 4 and 5. Two test specimens of each type shall be machined from each body. II 4.5.2: Delete in its entirety and substitute the followin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILW48855C51995WARHEADBODYASSEMBLYFORWARHEADSECTIONGMHEM258M258 烈性 炸药 导弹 弹头 零件 整装 组装 PDF

链接地址:http://www.mydoc123.com/p-449102.html