ARMY MIL-T-63262-1978 TEST MODE ASSEMBLY ROCKET M180 CRATERING DEVICE PROPELLANT TESTING《M180型火箭测试系统组装 装药设备推进剂测试》.pdf
《ARMY MIL-T-63262-1978 TEST MODE ASSEMBLY ROCKET M180 CRATERING DEVICE PROPELLANT TESTING《M180型火箭测试系统组装 装药设备推进剂测试》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-T-63262-1978 TEST MODE ASSEMBLY ROCKET M180 CRATERING DEVICE PROPELLANT TESTING《M180型火箭测试系统组装 装药设备推进剂测试》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-T-63262 (AR) 27 February i978 MILITARY SPECIFICATION TEST MODE ASSEMBLY, ROCKET: M180 CRATERING DEVICE PROPELLANT TESTING This specification is approved for use by all departments and agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the parts and assembly for one typ
2、e of test mode assembly designated as Test Mode Assembly, Rocket: 180 Cratering Device Propellant Testing. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposals form a part of this specification to the extent specified here
3、in. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Spec if icat ion for STANDARDS MILITARY MIL-STD-1169 - Packaging, packing and marking for shipment OT Inert Ammunition com- ponent s DRAWINGS (See 6.3) U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT COM
4、MAND 9325862 - Test Mode Assembly, Rocket FSC: i140 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of UM in improving this document should be addressed to: commander, US Army Armament Research and Development Command, Ath. DRDARQA, Dover, New Jersey 0
5、7801 by using the self-addreseed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. 1 I r- THIS DOCUMENT CONTAINS ” PAGES Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-63262 13 m 7
6、777906 03Li6808 7 MIL-T-63262 (AR) (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer). 3. REQUIREMENTS 3.1 Material - Materia
7、ls shall be in accordance with applicable drawings and specifications. 3.2 Assembly- The assembly shall comply with all re- quirements specified on drawing (dwg.) 9325862 and with all c requirements specified in applicable specifications. 3.3 First Article Inspection- This specification contains tec
8、.hnica1 provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3.4 Hydrostatic Inspection- Test mode assembly shall be fitted with a suitable seal and mounted on a suitable hydrostatic test fixture. H
9、ydrostatic pressure shall be applied in accordance with the requirements of dwg. 9325862. The Test Mode Rocket Assembly shall then be disassembled and all parts inspected for cracks, distortion or any other evidence of failure or damage. 3.5 Workmanship- All parts and assemblies shall be fabricated
10、and finished in a thorough workmanlike manner, and all manufacturing, processing, and assembly operations shall be correctly performed. They shall be clean and free of burrs, sharp edges, unblended radii, surface defects, chips, dirt, grease and oil (except where specifically required) , corrosion p
11、roducts and other foreign matter. The cleaning method used shall not be injurious to any part or assembly nor shall they be contaminated by the cleaning agent. Exterior surface coatings shall be continuous except for a few light scratches not exposing base material. markings and stampings shall be n
12、eat and sharply defined. (Required packing shall be dry). All required 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspections- The responsibility for inspections shall comply with MIL-A-48078. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS
13、-,-,-MIL-T-b3262 13 9999906 03L(b079 MIL-T-6 3 2 6 2 (.AR) 4.2 Classification of Inspections- The following types of inspection shall be conducted on this item: a. First Article Inspection b. Quality Conformance Inspection .4.3 First Article Inspection 4.3.1 Submission- The contractor shall submit a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILT632621978TESTMODEASSEMBLYROCKETM180CRATERINGDEVICEPROPELLANTTESTINGM180 火箭 测试 系统 组装 设备 推进 PDF

链接地址:http://www.mydoc123.com/p-448906.html