ARMY MIL-T-45688 D-1974 TELESCOPES ARTICULATED M105 SERIES《M105系列铰接望远镜》.pdf
《ARMY MIL-T-45688 D-1974 TELESCOPES ARTICULATED M105 SERIES《M105系列铰接望远镜》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-T-45688 D-1974 TELESCOPES ARTICULATED M105 SERIES《M105系列铰接望远镜》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、 - . f NIL-T-g5bD 12 9Ob 0308525 3 W M- General Specification Govern- ing the Manufacture, Assembly and nspec- tion Of tion Governing the Manufacture and In- spection Of Parts, Equipment and Tools for Army Materiel, Packaging and Packing Of Inspection Equipment, Acquisition, Dis- position and Mainte
2、nance Of Fire Control Materiel; General Specifica- U.S. Army, Frankford Arsenal Sampling Procedures and Tables for In- Quality Assurance Terms and Definitions Environmental Test Methods spection by Attributes F8565556 Pressure Tester, Two-Station FSC 1240 . . . THIIS DOCUMENT CONTAINS /Y PAGES. Prov
3、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-45bD 12 = 7999906 030852b C I MIL-T-45688D (MU) Fa574700 Telescope, Articulated: Ml05 Series F11747310 Telescope, Articulated: M105E1 PACKAGING DATA SHEET P8574700 Packaging of Telescope, Articulated:
4、 P11747310 Packaging of Telescope, Articulated: Ml05 Series M105E1 (Copies of specifications, standards, drawings, and packaging data sheets required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the con- tracting offi
5、cer.) 3. REQUIREMENTS 3.1 Fabrication.- The telescope shall be manufactured in accordance with the drawing applicable to the type telescope specified in the con- tract and drawing pertineht thereto. 3.2 General specification.- The contractor shall be responsible for adherence to, and compliance with
6、, the following requirements of MIL-F- 13926: a. Order of precedence b. Dimensions and tolerances c. Inorganic protective surface finishes d. Part identification and marking 3.3 Workmanship.- The requirements of MIL-F-13926 shall be met. The exterior protective surface finishes shall be free of defe
7、cts which may affect their protective qualities or appearance. Optical surfaces shall be free of scratches and blemishes which may affect their optical quali- ties or appearance. 3.4 Temperature conditions.- Except as specified in 3.5.1 and 3.5.2, the following requirements shall be met at a tempera
8、ture between 60 and 90 Fahrenheit (F) . *; 3.5 Environmental. 3.5.1 Storage temperatures.- The telescope shall show rio evidence of physical failure such as cement separation, glass breakage or casting failure and shall meet the applicable requirements of this specification at a standard ambient tem
9、perature of 60 to 90F after having been ex- posed and thermally stabilized at -8OO and +160 Fahrenheit (F). 3.5.2 Extreme operating temperatures.- The telescope shall meet the applicable requirements of 3.9 while exposed and thermally stabilized at -400 and +150 F. 2. Provided by IHSNot for ResaleNo
10、 reproduction or networking permitted without license from IHS-,-,-UIL-T-45bD 12 m 777Ob 0308527 7 W MIL-T-45688D(MU) 3.5.3 Vibration.- Th telescope shall show no evidence of physical failure due to being vibrated Fuccessively along three (3) mutually perpendicular axes. frequency varying either lin
11、early or logarithmically from 5 to 55 to 5 CPS in five minute cycles for a total of 15 minutes along each of the axes. inch (1/32 inch total excursion). telescope shall meet all subsequent requirements. Vibration shall be a simple harmonicmotion, the The amplitude of vibration shall be maintained co
12、nstant at 1/64 Following the vibration test the 3.6 Sealing.- The telescope shall show no evidence of leakage in excess of 0.2 pounds per square inch gage when subjected to an internal pressure of 5 2 0.10 pound per square inch (psig) for a minimum of 2 hours, The interior atmosphere of the accepted
13、 telescope shall contain nitrogen having a dew point at least as low as -250F. 3.7 Cleanliness. 3.7.1 Dirt.- Inspection for dirt and foreign particles (classed as The maximum size of any visi- dirt) shall be made from the eye end only. ble particle, when the reticle is brought into sharp focus, shal
14、l be a re- ticle line width. The maximum number of dirt particles appearing within a central field of view of 50 mils diameter shall be four (4). The maximum number of dirt particles appearing outside this field of view shall be five (5). The minimum angular separation between dirt particles shall b
15、e 15 mils. Dirt particles smaller than k reticle line width shall be ignored regardless of distribution. 3.7.2 Other defects.- There shall be no evidence of moisture, grease, fingerprints, condensates, fractures, and adhesive separations when viewing thru the objective and eye end of the instrument.
16、 3.8 Accuracy. 3.8.1 Orientation.- The telescope shall meet the requirements of 3.8.2 to 3.8.3 inclusive while positioned as follows: a. The geometric axis of the objective tube, as determined by the spherical surfaces of the mounting ring adjacent to Window Assembly and the mounting ring adjacent t
17、o the articulated joint, shall be in a horizontal plane. e;. one minute counter-clockwise from the horizontal as viewed from the eyepiece b. The locating pin shall be set 30 degrees, plus or minus C. The eyepiece shall form an angle of 20 5 15 below the geometric axis of the objective tube when meas
18、ured on the hanger bracket flat surface at the eyepiece end. 3.8.2 Collimation. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-45 6883 (MU) 3.8.2.1 Z1evation.- The line 02 sight thro-?.gh the boresight cross (zero range line) shall be ?onition
19、ed above the geometric axis of the telescope in accordance 17ith the mil velue indicated on Che drawing for the reticle iitilized, within ?lus or minus 0.5 mils. 3.8.2.2 Deflection.- The line of sight thitouzh the boresight cross of the reticle pattern utilized shall be in coincidence with a vertica
20、l plane that passes through the geometric axis of Lhe ob jectf-ve tuSe within 0.50 mils. 3.8.2.3 Coincidence 02 reticles.- The Une. o sight through the boresPsht cross of the o?posite reticle pattern shall coincide with the line OZ sight of the reticle osition established in 3.C.2.1 and 2.8.2.2 with
21、in -07 mil. 3.8.3 Parallax.- Parallax at the center 02 the Zield shal-1 not exceed 0.05 mil when viewing a target iiit!i.in the limito o? 201! to 15OU meters 3.8.4 Parallelism 02 reticle and ima:e.- he verCical line 02 the mAT or MIL pattern on the recicle utilized chad1 be -nrallel to the image oil
22、- a vertical target line within 30 minutes o arc. 3.8.5 Xeticle Jander.- The image or the rekicie boresight cross shall not deviate more than 1 degree Lr-,m a r:ed reeience in an atixkliary telescope secured to the eyeFiece vhen the eye?icce end 02 the telescope is elevated and depressed through its
23、 Lull range Lrom sto? to stop. I i i. i 3.8.6 Reticle lean.- The angilar rotation or the reticle image shall not exceed 1,O degree Lrom a fixed reference in cn m:ilFary tclesco:e secured to the eye-iece when the eye?iece end 02 the telesco-e is elevated and depressed through its Zu11 rsnze rom stop
24、to sto). 3.8.7 Image tilt.- The image of a verticel target line skill be verticle within 1 degree of arc when the telcsco?e is positioned as in 3.8.1. 3.8,8 Resolution.- The resolution on the O?tkal 2.5:; 5ha1 %e 6.0 seconds 02 arc o less. 3.8.9 Syepiece focus.- Eyepiece focus shall be adjustable ov
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILT45688D1974TELESCOPESARTICULATEDM105SERIESM105 系列 铰接 望远镜 PDF

链接地址:http://www.mydoc123.com/p-448585.html