ARMY MIL-S-55286 E-1983 SHELTER ELECTRICAL EQUIPMENT S-280 ( ) G《S-280() G电气设备棚》.pdf
《ARMY MIL-S-55286 E-1983 SHELTER ELECTRICAL EQUIPMENT S-280 ( ) G《S-280() G电气设备棚》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-S-55286 E-1983 SHELTER ELECTRICAL EQUIPMENT S-280 ( ) G《S-280() G电气设备棚》.pdf(45页珍藏版)》请在麦多课文档分享上搜索。
1、I a S NIL-S-552bE 59 M 7777706 0222327 O MIL-S-55286E(CR) 11 October 1983 SUPERSEDING 5 December 1979 MIL-S-55286D(CR) MILITARY SPECIFICATION SHELTER, ELECTRICAL EQUIPMENT S-280( )/G This specification is approved for use by Communications and Electronics Command, Department of the Army and is avail
2、able for use by all Departments and Agencies of the Department of Defense 1. SCOPE 1.1 Scope.- This specification covers one type of lightweight field and mobile shelter designed for transport by cargo truck, fixed or rotary winged aircraft, by rail, ship, and landing craft, designated as Shelter, E
3、lectrical Equipment S-280( )/G (See 6.6). 2. APPLICABLE DOCUMENTS 2.1 Issues of documents.- The following documents, of the issue in effect on date of invitation for bids or request for proposal, form a part of this Specification to the extent specified herein: SPECIFICATIONS MILITARY M IL-W - 6 8 5
4、 8 Welding, Resistance: A,uminum, Magnesium, Non-Hardening Steels or Alloys, Nickel Alloys, Heat-Resisting Alloys, and Titanium Alloys; Spot and Seam E4 I L-W- 8 60 4 Welding of Aluminum Alloys: Process for MIL-M-13231 Marking of Electronic Items Beneficial comments (recommendations, additions, dele
5、tions) and any pertinent data which may be of use in improving this docu- ment should be addressed to: Commander, US Army Communications and Electronics Command, ATTN: DRSEL-ED-SS, Fort Monmouth, New Jersey 07703, by using the self-addressed Standardization Document Improvement Proposal (DD Form 142
6、6) appearing at the end of this document or by letter. FSC-54 1 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-14072 Finishes for Ground Electronic Equipment MIL-S-55507 Shelter, Electrical Equipment, (Empty), Packaging of STANDARDS MILITARY
7、 i: MIL-STD-105 MIL-STD-169 Extreme-Temperature Cycle . MIL-STD-170 Sampling Procedures and Tables for Inspection by Attributes Moisture Resistance Test Cycle for Ground Signal and Electronic Test Equipment MIL-STD-202 MIL-STD-252 Classification of Visual and Mechanical Test Methods for Electronic a
8、nd Electrical Component Parts Defects for Equipment, Electronic, Wired and Other Devices MIL-STD-285 . Attenuation Measurements for Enclosures, Electromagnetic Shielding, for Electric Test Purposes, Method of MIL-STD-810 Envi ronmen ta 1 Test Met hods MIL-STD-1235 Single and Multilevel Continuous Sa
9、mpling Procedures and Tables for Inspection by Attributes DRAWINGS ELECTRONICS COMMAND SC-D-36423 SC-C-36424 sc-c-200154 SM-D-450462 SM-C-450466 SM-C-5555 15 SM-B-563756 SC-D-595509 SM-D-6 15264 DL-SC-A-621051 SM-D-781242 Hold Down Assembly Cable Assembly Keeper Panel Assembly, Emergency Exit Air Fi
10、lter Shock Mount Sealer Cover, Emergency Exit Intake Louver Assembly Modification Kit, Radio Frequency Door Fixture (S-280) Construction Interference, MK-I079/G Tightness Test L Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-552bE 54 977970b 0
11、222331 3 a a ,- SM-D-781243 SM-D-78 1244 DL-SM-D-947080 SM-D-947080 SM-D-9470 8 1 SM-D-947082 SM-D-947083 SM -D-g 4 70 84 SM-D-9 470 85 SM-D-947141 SM-D-947142 SM-D-947143 SN-D-947160 SM-D-947166 SM-D-947235 SM-D-947238 SM-C-947237 SM-B-947179 SM-B-947180 SM-D-947181 SM-B-947182 SM-B-947183 SM-B-947
12、184 SM-D-947186 SM-C-947230 Drain Fixture (S-280) Construction S-280 Construction Tightness Test Shelter, Electrical Equipment S-280C/G Shelter, Electrical Equipment S-280C/G Panel Assembly, Front Panel Assembly, Rear Panel Assembly, Roof Panel Assembly, Floor Panel Assembly, Side Corner, Lifting Ey
13、e (Machining) Corner, Towing Eye (Machining) Casting, Lifting to prescribed requirements. Except as otherwise specified in the con- -4.2 Classification of inspections.- The inspection requirements specified herein are classified asfollows: a. First article inspection (see 4.4). 12 Provided by IHSNot
14、 for ResaleNo reproduction or networking permitted without license from IHS-,-,- - MIL-S-5528bE 54 9999906 0222341 1 5 for every grade or type 5 for every grade or type 5 for every grade or type 5 for every grade or type 3 for every grade or type of urethane MIL-S-55286E(CR) b. Quality conformance i
15、nspection (see 4.5). (1) In-process (see 4.5.1). (2) Completed items (see 4.5.2). c. Methods of examination and test (see 4.6). d. Quality conPormance inspection of packaging (see 4.7). 3-3.1 3.3.1 3.3. 3.3. 3.3. 3.3. 4.3 Inspection conditions.- Unless otherwise specified, all shelters sub- mitted f
16、or quality conformance inspection shall be completely assembled. The final finish need not be applied until after the Group A, Group B, and Group C inspections have been performed on that shelter. prior to performance of the Group A, Group B, and Group C inspection, the final finish on the floor sha
17、ll not be applied until prior to final inspection. If the final finish is not applied until after the Group A, Group B, and Group C inspections, then those inspections related to the finish and marking shall be performed at final inspection. Unless otherwise specified, no other adjustment, additions
18、 or modifications -shall be made before or during test and inspection (see 4.5.2). If the final finish is applied 4.4 First article inspection.- Unless otherwise specified (see 6.1.b, 6.21, all first article test and inspections shall be performed by the contractor and shall consist of the following
19、 (see 3.2): 4.4.1 First article specimens.- The contractor shall provide and test the first article specimens listed in Table I. All specimens shall relflect mater- ial and conditions which will be used in production (see 6.2, Table II) Inspection Core material: Dens it y Compressive strength Shear
20、strengtrh Flammaiblity Water absorption TABLE I FIRST ARTICLE SPECIMENS I Quant it y Req t I Para Test Par a 4.6.1 4.6.1.1 4.6.1.2 4.6.1.3 4.6.1.4 4.6.1.5 .- 13 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b flIL-S-5528bE 5Y 777970b 0222342 3 Insp
21、ection Req t ! Test para para c Cleaning 3.4.2 4.6.4 Welding 3.4.3 4.6.5 MIL-S-55286E(CR) TABLE I. First Article Specimens Contd Inspection Adhesive Sealer Shock mounts Impact panel Hold down assembly Eye Casting Hardness Quantity I Test i 50 coupons 50 coupons SM-C-555515: 3 per -3 SM-C-947237: 3 e
22、ach SM-C-947230: 3 each 1 from wall, 1 from floor 1 complete 1 casting per SM-D-947143 3.3.2 3.3.3 3.3.4 3.4.4.1 3.8.1 3.6.4.2 4.6.2 4.6.2 4.6.3.1 4.6.7 4.6.32 4.6.24 4.4.2 First article shelter.- The contractor shall provide and test a first article shelter which shall reflect material and conditio
23、ns which will be used in production. Inspection shall consist of the inspections listed in Table II. Inspection shall be in the sequence listed in Table II. 4.5 Quality conformance inspection.- The contractor shall perform the in- spections specified under this paragraph. This does not relieve the c
24、ontractor of his responsibility for performing any additional inspection which is neces- sary to control the quality of the product and .to assure conipliance with all specification and drawing requirements. 14 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILS55286E1983SHELTERELECTRICALEQUIPMENTS280GS280G 电气设备 PDF

链接地址:http://www.mydoc123.com/p-448156.html