ARMY MIL-S-48603-1976 SIGHT BORE REFLECTING XM115E1《XM115E1型反射孔瞄准器》.pdf
《ARMY MIL-S-48603-1976 SIGHT BORE REFLECTING XM115E1《XM115E1型反射孔瞄准器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-S-48603-1976 SIGHT BORE REFLECTING XM115E1《XM115E1型反射孔瞄准器》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-S-48603 (Em) 29 October 1976 MILITARY SPECIFICATION SIGHT, BORE, REFLECTING: XM115El This spec The Department of Defense. zation is approved for use by all Departments and Agencies of 1. SCOPE 1.1 Bore, Reflecting: B4l15 used for boresighting the Lightweight Company Mortar, 6OFE,XN224. “Bore Sig
2、ht .“ This specification covers one type of instrument known as Sight, Throughout this specification this instrument is referenced as 2. APPLICABLE DOCUMENTS 2.1 The follawing documents, of the issue in effect on date of Invita- tion for bids or request for proposal, form a part of this specificatio
3、n to the extent specified herein. SPECIFICATIOl?S Milit ary MIL-0-13 S 3 O Optical Components for Fire Control Instruments: General Specification Governing the Nanufacture, Assembly and Inspection of Fire Control Ifateriel, General Specification Governing the Nanufacture and Inspection of Parts, Equ
4、ipment and Tools for Army Xateriel Packaging and Packing of and Disposition of MIL-F-13 9 2 6 NIL-P- 14 232 . IiIL-1-45607 Inspection Equipment, Qcquisition, Faintenance, STANDARDS EIL-STD-105 PIIL-STD-1 O 9 Quality Assurance Terms and Definitions . Sampling Procedures and Tables for Inspection by A
5、ttributes Beneficial comments (recommendations, additions, deletions) and any perti- nent data which may be of use in improving this docurcent should be addressed using the self-addressed Standardization Document Improvement Proposal (DD Forn 1426) appearing at the end of this document or by letter.
6、 Commander, Frankford Arsenal, ATTN: SARFA-HM, Phila., Pa. 19137, by FSC 1240 P Licensed by Information Handling ServicesLicensed by Information Handling ServicesMIL-S -48603 (MU) 3.5.2 Cross level vials.- When the line of sight of each lens assem- bly is in each collimated position of 3.5.1 above,
7、each cross level bubble shall be centered within 1/2 space width between two graduation lines. 3.5.3 lens assembly, Position “A“ of Figure 1, is in the collimated position of 3.5.1 above, the elevation level bubble shall be centered within 112 space width between two graduation lines. Elevation leve
8、l vial.- ihen the line of sight of the adjacent 3.6 Temperature.- The boresight shall be capable of withstanding tem- perature stabilization at +160“F and -50F for a period of five hours at each extreme temperature. Subsequent to exposure to the temperatures spec- ified herein, the boresight shall s
9、how no evedence of damage and shall meet the requirements of 3.5. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.- Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. spec
10、ified, the supplier may utilize his own facilities or any other facil- ities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where su
11、ch inspections are deemed necessary to assure supplies and services con- form to prescribed requirements. Except as otherwise 4.1.1 General provisions.- The component and subassemby inspection requirements of MIL-F-13926 form a part of the Quality Assurance Provisions of this specification. in MIL-S
12、TD-109. Definitions of inspection terms shall be as listed 4.2 Eirst article (initial production) approval,- Th requirement for first article approval and the responsibility (Government or contractor) for first article testing shall be as specified in the contract. for first article approval tests s
13、hall consist of three (3) boresights plus three (3) each of all items covered by SQAP. The three boresights shall be tested as specified herein for all the requirements of this specification. The items covered by SQAP shall be tested, as specified thereon, for all characteristics delineated on the S
14、QAP. The samples shall be manufactured in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, includ- ing packaging and packing, shall be obtained from the same source of supply as used in regular production. The sam
15、ple 4.2.1 Government testing.- When the Government is responsible for conducting first article approval tests, the contractor, prior to sub- mitting the sample to the Government, shall inspect the sample to insure that it conforms to all the requirements of the conixact and submit a re- cord of this
16、 inspection with the sample, including certificates of conform- ance for materials. 3 Licensed by Information Handling ServicesMIL-S -48 6 03 (MU) 4.2.2 v.- When the contractor is responsible for conducting first article approval tests, the sample shall be inspected by the contractor for all the req
17、uirements of the contract. and a record of this inspection, including certificates of conformance for materials, shall be submitted to the Government for approval. The Government reserves the right to witness the contractors inspection. The sample 4.3 Inspection provisions. 4.3.1 Submission of produ
18、ct.- Unless otherwise specified by the Contracting Officer, inspection lot size, lot formation and presentation of lots shall be in accordance with “Submission of Product“ provisions of MIL-STD-105. 4.3.2 Examination and tests. 4.3.2.1 Components and subassemblies.- All components and subassem- blie
19、s shall be inspected in accordance with the inspection provisions con- tained in Supplementary Quality Assurance Provisions (SQAP) listed in the technical data package (TDP), In the absence of SQAPs, the applicable Quality Assurance Provisions of MIL-F-13926 shall apply, 4.3.2.2 Boresight.- Examinat
20、ion and tests related to Section 3 herein shall be performed on a class basis in accordance with MIL-STD-105 and the sampling plans specified in Tables i, II, and III herein, Ex- amination and tests for packaging, packing, and marking shall be in accord- ance with MIL-P-14232 and Section 5 herein. T
21、he tabulated classification of defects in Tables I, II, and III shall constitute the minimum inspection to be performed by the supplier after first article approval and prior Co Government acceptance or rejection by item or lot. TABLE I - CLASSIFICATION OF DEFECTS CRITICAL : NONE MAJOR : AOL 1.0% De
22、fective REQUIREMENT TEST PROCEDURE 101. Collimation accuracy 3.5.1 4.6.2 102. Cross level vial accuracy 3.5.2 4.6.3 103. ElevaCion level vial accuracy 3.5.3 4.6.4 MINOR: NONE - NOTE: The tests in Table I shall be conducted at a temperature between 60“ and 90F.- 4.3.3 Acceptance and rejection,- Rejec
23、ted lots shall be screened for all defective characteristics. Removal or correction of defective units 4 Licensed by Information Handling ServicesMIL-S-q603 12 9999906 0322307 O 9 MIL-S -48603(MLT) and resubmittance of rejected lots shall be in accordance with “Acceptance and Rejection“ as specified
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILS486031976SIGHTBOREREFLECTINGXM115E1XM115E1 反射 瞄准 PDF

链接地址:http://www.mydoc123.com/p-448046.html