ARMY MIL-S-48380-1975 SUPPORT PROPELLING CHARGE (FOR USE IN AMMUNITION PACKING)《(用于军火包装的)推进剂》.pdf
《ARMY MIL-S-48380-1975 SUPPORT PROPELLING CHARGE (FOR USE IN AMMUNITION PACKING)《(用于军火包装的)推进剂》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-S-48380-1975 SUPPORT PROPELLING CHARGE (FOR USE IN AMMUNITION PACKING)《(用于军火包装的)推进剂》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、_ . MIL-S-Lt8380 13 9799706 03L76L3 O m .y-37-m- MIL-S-4 83 80 (.PA) 14 January i975 MILITARY SPECIFICATION ! SUPPORT, PROPELLING CHARGE (FOR- USE IN AMMUNITION PACKAGING) This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope.-This sp
2、ecification covers the Propelling Charge Supports to be used in packaging the 81MM, Cartridge, HE, M374A3. 2 . APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids orrequest for proposal, form a part of this specification to the extent specified here
3、in. SPECIFICATIONS MI LI TARY MIL-A-2550 -Ammunition and Special Weapons, General Specification for STANDARDS MILITARY MIL-STD-105 -Sampling Procedures and Tables for MIL-STD-109 -Quality Assurance Terms and Definitions MIL-Sn-i168 -Lot Numbering of Ammunition MIL-STD-1169 -Packaging, Packing and Ma
4、rking for Shipment of Inert Ammunition Components MIL-STD-1235 -Single and Multilevel Continuous SamplLng Procedures and Tables for Inspection by Attributes Inspection by Attributes (-ABC=STD-105) FSC: 1315 / THIS DOCUMENT CO - -. A Provided by IHSNot for ResaleNo reproduction or networking permitte
5、d without license from IHS-,-,- MIL-S-48380 13 7737906 0339634 2 I PRODUCT AND PACKING DRAWINGS ARMY 9257177 -Support, Propelling Charge Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the
6、procuring activity or as directed by the contracting officer.) 3 . REQUIREMENTS 3.1 Material.-Material shall be in accordance with applicable drawings and specifications. - 3.2 First Article Inspection.-This specification makes provisions for first article inspection. submission of first article sam
7、ple by the contractor shall be as specified in the contract. Requirements for the 3.3 Workmanship.-All parts shall be fabricated and finished in a thorough, workmanlike manner. They shall be free of cracks, porosity, dirt, water and other foreign matter. cleaning method used shall not be injurious t
8、o any of the parts nor shall the parts be contaminated by the cleaning agents. The 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specif
9、ied herein. tract or order, the supplier may use his own or-any other facilities suitable for the performance of the inspection require- ments specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification wh
10、ere such inspections are deemed necessary eo assure supplies and services conform to prescribed requirements. MIL-STD-109 to define terms used herein. Specification MIL-A-2550 shall apply. Except as otherwise specified in the con- Reference shall be made to Standard The provisions of 2 Provided by I
11、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-483 80 (PA) 4.1.1 Submission of Product.-At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following informat
12、ion accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specification number and date, toge
13、ther with an identification and date of changes thereto. c. A statement that all material purchased by the contractor meets requirements when such material is controlled by Government or commercial specifications referenced in -any of the contractual documents, and that certificates of con- formance
14、 are on file and available for review. d. Number of items in the lot. e. Date submitted. i The certTficate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substa
15、ntiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First Article Inspection 4.2.1 Submission.-The contractor shall submit a first article sample co
16、nsisting of twenty-five (25) complete sets of parts (i.e. 25 each of every component and every subassembly) for evaluation in accordance with the provisions of 4.2.2. or furnished by a supplier and shall have been manufactured using the same production processes, procedures and equip- r ment which w
17、ill be used in fulfilling the contract. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shall inspect the sample to the degree necessary to assure that it conforms to
18、 the requirements of the contract and submit a record of this inspection with the sample, including statements of findings and certificates of conformance for materials (see 4.1.1). A sample containing known defects The sample shall be produced by the contractor 3 Provided by IHSNot for ResaleNo rep
19、roduction or networking permitted without license from IHS-,-,-will not be submitted unless specifically authorized by the contracting officer. A first article sample or portion thereof, as directed by the contracting officer, shall also be submitted whenever there is a lapse in production for a per
20、iod in excess of 90 days or whenever a change occurs in manufacturing process, material used, drawing or specifica- tion such as to significantly affect product uniformity as determined by the Government. 4.2.2 Inspections to be performed.-Components will be subjected by the Government to all of the
21、 examinations or tests specified in 4.3 of this specification and all require- ments of the applicable drawings. 4.2.3 Rejection.-If any assembly or component fails to comply with any of the appplicable requirements the first article sample shall be rejected. The Government reserves the right to ter
22、minate its inspection upon any failure of an assembly or component to comply with any of the stated requirements. 4.3 Quality Conformance 1nspecti.on 4.3.1 Lot Formation.-The term “inspection lottt, as used in this specification, is defined as an essentiaily homogeneous collection of units of produc
23、t from which a representative sample is drawn and inspected to determine conformance with applicable requirements. The sample selected shall represent only that quantity of units from which the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILS483801975SUPPORTPROPELLINGCHARGEFORUSEINAMMUNITIONPACKING 用于 军火 包装 推进 PDF

链接地址:http://www.mydoc123.com/p-448031.html