ARMY MIL-S-46371 (3)-1972 SIGHT INFINITY 8635466《8635466无限瞄准器》.pdf
《ARMY MIL-S-46371 (3)-1972 SIGHT INFINITY 8635466《8635466无限瞄准器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-S-46371 (3)-1972 SIGHT INFINITY 8635466《8635466无限瞄准器》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-S-46371(MU) . AMENDMENT 3 -. 24 - March -_ 1972 - - SUPERSEDING AMENDmNT 2 30 December 1968 MILITARY SPECIFICATION SIGHT, INFINITY: 8635466 This amendment forms a part of Military Specification MIL-S-46371(MU), dated 12 April 1963. * Paragraph 2.1, under Drawings : Delete: TEL 8635466 - Index o
2、f Inspection Equipment List for Sight, fnf inity: 8635466“ and “LSQAP 8635466 - Supplementary Quality Assurance Provision List for Sight, Infinity: 8635466“. Add: “F8565556 Pressure Tester Two Station“ Paragraph 3.5: Delete and substitute: “3.5 Alignment.- With the mounting surface in a vertical pla
3、ne and the locating key horizontal within 1.0 minute, the center of the reticle pattern shall be projected 26 f 1.0 minute below a horizontal plane. It Add new paragraph 3.6 as follows: “3.6 Environmental“ * Paragraph 3.6.4: Delete and substitute: “3.6.4 Sealing.- The Infinity Sight shall show no ev
4、idence of The leakage in excess of 0.2 pounds per square inch (psi) when subjected to an internal pressure of 5. * 0.10 psi for a minimum of 2 hours. interior atmosphere of the accepted sight shall contain nitrogen having a dew point at lease as low as dnus 25F at atmospheric pressure. The sight sha
5、ll then be sealed with an internal pressure of between 0.25 and 0.50 psig of dry nitrogen. Paragraphs 4.3 and 4.3.1: Delete and substitute as follows: “4.3 First article (initial production) approval.- The require- ment for first article approval and the responsibility (Government or contractor) for
6、 first article testing shall be as specified in the FSC 1240 . I 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-46373 (3) 32 779770b 0333553 MIL-S -4637 1 (MU) AMENDMENT 3 contract. The sample for first article approval tests shall consist o
7、f 3 infinity sights manufactured in the same manner using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packaging and packing shall be obtained from the same source of supply as used in regular production. 4.3.1 Government
8、testin%.- When the Government is responsible for conducting first article approval tests, the contractor, prior to sub- mitting the sample to the Government, shall inspect the sample to insure that it conforms to all the requirements of the contract ana2 submit a record of this inspection with the s
9、ample, including certificates of conformance for materials.“ Add new paragraph 4.3.2 as follows: “4.3.2 Contractor testing.- When the contractor is responsible for conducting first article approval tests, the sample shall be inspected by the contractor for all the requirements of the contract. and a
10、 record of this inspection, including certificates of conformance for materials, shall be submitted to the Government for approval. The Government reserves the right to witness the contractor.s inspection.“ The sample * Paragraph 4*5.1: Delete “Supplementary Quality Assurance Provisions List (LCQAP)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILS4637131972SIGHTINFINITY86354668635466 无限 瞄准 PDF

链接地址:http://www.mydoc123.com/p-448010.html