ARMY MIL-S-45669A-1971 SIGHT BORE OPTICAL M45.pdf
《ARMY MIL-S-45669A-1971 SIGHT BORE OPTICAL M45.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-S-45669A-1971 SIGHT BORE OPTICAL M45.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-S-45669A(MU) 19 February 1971 SUPERSEDING MIL - S -45 66 9 (OD) 5 May 1960 _ , _- 7 ! 1 MILfTARY SPECIFICATION I SIGHT, BORE, OPTICAL: M45 1. SCOPE 1.1 This specification covers one type of instrument known as Sight, Bore, Optical: M45 used for boresighting mortars. Throughout this specificati
2、on, this instrument is referenced as “Bore Sight”. Elbow Tele- scope, 8579641-1 is an integral component of this bore sight. 2 APPLTCABLE DOCUMENTS 2.1 The following docunents, of the issue in effect on date of in- vitation for bids or request for proposal, form a part of this specifi- cation to the
3、 extent specified herein. SPECIFICATIONS Mil it ary MIL-T- 1332 1 MIL-F- 13926 MIL-P- 14232 MIL-1-45607 STANDARDS Military 1 . MIL-STD- 105 MIL-STD- 109 Telescope, Elbow, M62 (Series) Fire Control Materiel, General Specifi- cation Governing the Manufacture and Inspection of Parts, Equipment and Tool
4、s for Army Materiel, Packaging and Packing of Inspection Equipment, Acquisition, Supply and Maintenance of Sampling Procedures and Tables for Quality Assurance Terms and Defini- Inspection by Attributes tions FSC I 1240 -. . _ Provided by IHSNot for ResaleNo reproduction or networking permitted with
5、out license from IHS-,-,-DRALTINGS U.S. Army, Frankford Arsenal F8579 189 Sight, Bore, Optical: M45 PACKAGGING DATA SHEET 5800859 Packaging of Sight, Bore, Optical: M45 W/E (Copies of specifications, standards, drawings and packaging data sheets required by syppliers in.connection with specific proc
6、urement functions should be obtainei from the procuring activity or as directed by the con- -tracting officer. .- 3. REQUIREMENTS 3.1 Materials.- The materials shall be in accordance with the c. drawings, material specifications and general specifications forming a part of this specification. 3.2 Fa
7、brica-.- The bore sight shall be manufactured in accordance with Drawing F8579189. 3.3 General specifications.- The contractor shall be responsible foi adherence to, and compl Lance with, the following requirements .of MIL-F-13926. 3 3.1 NIL-F- 13926. a. Order of precedence b. Dimensions and toleran
8、ces * C. Inorganic protective surface finishes d. Part identification and marking e. Workmanchip Telescope, Elbow, 8579641-1.- The Elbow Telescope, 8579641-1, 3.4 which is a part of the bore sight, shall have met the requirements of MIL-T-13321 prior to assembly as a bore sight. speciffcation after
9、being positioned as in (a) of Figure 1 and vibrated at a constant frequency of 30 cycles per second (cpc) with an amplitude of 1/16 inch (1/8 inch total excursion) for a period of 5 minutes plus or minus 15 seconds. 3.5 Vibration.- The bore sight shall meet all requirements of this 2 Provided by IHS
10、Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-45669A (MU) a i 3.6 Orientation.- The bore sight chai1 be clamped securely in each of the three mounting positions shown in Figure 1 with the respective V slide contacting the longitudinal portion of a smooth 4.
11、5 inch diameter tube or equivalent, whose axis is inclined precipely 45 degrees above the horizontal. The following conditions shall be met :st each of the above specified positions unless otherwise specified. 3,7 Accuracy. 3.7.1 Collimatio2.- The line of sight of the elbow telescope shall be parall
12、el to the vertical plane passing through the axis of the corr- espondhg V slide within 3 mils for positions (a) and (c) of Figure 1. 3.7.2 Plumb traJe1.- Using position (a) of Figure 1 in accordance with 3.6 and with the line of sight of the elbow telescope in a hori- zontal plane and in coincidence
13、 with a plumb line, the line of sight shall not deviate from the plumb line by more than 2.0 mils total dis- placement from maximum depression to maximum elevation. 3.7.3 Parallelism of reticle and image.- The vertical crossline on the reticle shall be parallel to the image of a plumb line within 1
14、degree. 3.7.4 Cross level vial.- Thc respective cross level bubble shall be centrai within 5 minutes. 3.7.5 -Elevation level vial,- The elevation level bubble shall be central within 5 minctes. 3.8 Telescope travel.- With position (a) of Figure 1 established in accordance with 3.6, the telescope sha
15、ll be capable of being rotated a minimum of 45 degrees in elevation and 30 degrees in depression. 3.9 Operating temperature.- The bore sight shall meet the torque requirements of 3-10 whenthermally stabilized at ambient temperatures of minus 40 degrees Fahrenheit and plus 150 degrees Fahrenheit and
16、the strap assembly shall be completely operable when securing and loosen- ing the bore sight to the tube. 3.91 Clamp screw.- The clamp screw, in a free state, shall be op- erable throughout its threaded portion without restriction or binding at all temperatures specified above. 3.10 Torque.- TILe to
17、rque required to elevate and depress the tele- scope through full trave1 ch.rll nct exceed 10 pound inches nor be less than 2 pound inches ;.t room zemperature (60 to 90 degrees). The torque required to elevate nd depress tbe telescope through full travel shall not exceed 28 pound Snches nx be less
18、than 2 pound inches at the extreme temperatures specific d in 3.9. 3.11 Strap asseRblx.- The bore sight o, strap assembly shall not become loosened as a result of applying 2 pounds direct force at the knurled portion of the clamping screw, once in each opposing direction Provided by IHSNot for Resal
19、eNo reproduction or networking permitted without license from IHS-,-,-MIL-S-45667A 12 m 9999906 O308377 3 MIL-S-45669A (MU) parallel to the tube axis, when the bore sight is positioned and secured as shown in (a) of Figure 1 with a maximum torque of 2 pound inches ap- plied to the clamp screw. 4. QU
20、ALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.- Unless otherwise specified in the contract or purchase order, the supplier is responsible for the per- formance of all inspection requirements as specified herein. othewise specified, the supplier may utilize his own facilities or any ot
21、her facilities suitable for the performance of the inspection require- ments specified herein, unless disapproved by the Government. ernment reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services
22、 conform to prescribed requirements. Except as The Gov- 4*1.1 General provisions.- The component and subassembly inspec- tion requirement of MIL-F-13926 form a part of the Quality Assurance Provisions of this specification. be as listed in MIL-STD-109. Definitions of inspectZion terms shall 4.2 Firs
23、t article (initial production) approval.- The requirement for first article approval and the responsibility (Government or con- tractor) for first article testing shall be as Specified in the contract. The sample for first article approval tests shall consist of 3 bore sights plus 3 each of all item
24、s covered by SCAP. The sample shall be manufactur- ed in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as used in regular produc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILS45669A1971SIGHTBOREOPTICALM45PDF
