1、-_ - MIL-R-q233A 13 m 7979706 031765q q m MIL-R- 4 8 2 3 3A (MI) 24 June 1980 Superseding 13 July 1973 MIL-R-48233 (MU) MILITARY SPZCIFICATION ROD, STABILIZING, COATED FOR 2.75 INCH ROCKET MOTOR MK$/1 also 90% (min.) passing No. 100 U.S. Std. Sieve I Shall meet the re- quirements of Table II TIZBLE
2、II - Composition of Ethyl Cellulose Compound Mat e ria 1 Ethyl Cellulose Plasticizer Normal Butyl Stearate Color or Color Masking Materia tercent by Weight 70 + 2- 10 + 2 - I 20 0.01 (max.) 4 Requirements MIL-B-21465 Red Oil, Dye or Approved Equivalent Provided by IHSNot for ResaleNo reproduction or
3、 networking permitted without license from IHS-,-,-MIL-R- 4 8 2 3 3A (MI ) 3.7.2 Chemical analysis. A chemical analysis of each lot of coating material, showing the percentage of potassium sulfate, shall be furnished to the procuring activity by the contractor. 3.7.3 Thermal shock. The stabilizing r
4、od coating shall show no evidence of loosening, cracking, chipping or other failure after severe thermal shock. 3.7.4 Concentricity. The concentricity, after the thermal shock test, between the outermost surface of the coating and the stabilizing rod shall be as specified on the drawing. 3.7.5 Adhes
5、ion. The minimum average load required to shear the salt coating from a two inch section of the metal rod shall be sixty (60) pounds. 3.7.6 Compression. The inside diameter of the forward portion of the stabilizing rod, when the O.D. is compressed to 2.589 - .O01 inch, shall be sufficient to securel
6、y position the Igniter, MK125. 3.8 Workmanship. All part shall be fabricated and furnished in a thorough, workmanlike manner. They shall be free of burrs, chips, sharp edges, cracks, unblended radii, surface defects, metal shavings, dirt, grease, rust, corrosion products and other foreign matter. Th
7、e cleaning method used shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat and sharply defined. Known item defects shall not be submitted with the lot. 3.9 First article inspection. This specification makes provisions for
8、 first article inspection. Requirements for the submission of first article samples-by*e contractor shall be as specified in the contract. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility fpr inspection. Unless otherwise specified in the contract, Che contractor is responsible for the performance
9、of all. inspection requirements as specified herein. otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. of the inspecti-ons set forth in the sp
10、ecification where such inspections are dee the filtrate shall be added to the above solution. The solution shall then be dfluted to one liter in a volumetric flash and mixed well. Two 50-ml iiliquots of the coating solution shall be taken for analysis. 4.4.1.3 Analysis. ml beaker, diluted with disti
11、lled water to 400 ml, and 2 ml of concentrated hydrochloric acid shall be added. This solution shall be heated to boiling and 20 ml of 10% barium chloride solution added by pipette. The boiling shall be restarted and continued for five minutes. The sample shall stand overnight and shall then be filt
12、ered through a number 42 Whatman filter paper or equivalent, andwashd uniil the filter paper is free of chloride. The filter paper and precipitate shall then be ignited in a weighed crucible at 600C.to constant weight. 4.4.1.4 Calculation. The percentage of potassium sulfate shall be calculated by t
13、he -following- equation; A 50-1111 aliquot shall be transferred to a 600- * 17 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL- R-4 82 3 3A (MI ) 4.4.2 Thermal shock test (see 4.3.3.2). Each of the twenty-five (25) stabilizing rods shall be place
14、d on wood supports in an air bath test chamber at -65F + 2OF, for not less than 6 hours. Within one minute after removal of stabilizing rods from the low temperature air bath test chamber, the stabilizing rods shall be placed in an air bath test chamber at +165F, + 2F, for not less than 6 hours. int
15、erruption. 4.4.3 Concentricity test (see 4.3.3.3). Each of the ten (10) test samples shall be tested for concentricity, using an approved gage. This cycle shall be repeated onCe again without 4.4.4 Adhesion Test (see 4.3.3:4). The adhesion test shall be performed on samples passing the thermal shock
16、 test as follows: 4.4.4.1 Pz. Three (3) test specimens, one from each end and one from the middle, shall be cut from each of the ten stabilizing rods, shall have one-half inch of coating removed from each end, leaving a test specimen of 2 inches + 1/16 inches, The end faces of the coating on the tes
17、t specimen-shall be free of coating material and burrs. Each specimen shall be three inches in length and 4.4.4.2 Conditioning of specimens. Prior to testing, the specimens shall be conditioned at a temperature of +7OoF, + - 5F, for not less than two hours, 4.4,4.3 Test equipMent. - The test equipme
18、nt for the adhesion test shall be any testing machine having a moveable head whose speed can be adjusted to 2 inches 3. 0.250 inches per minute when the machine is running idle, The load indicating mechanism shall be capable of accurately indicating load readings to within + 3 pounds. The jig for ap
19、plying the load to the stabilizing rod test specimen shall be such that the load is applied through surfaces that are flat and parallel to the ends of the stabilizing rod specimens, normal to the long axis of the specimen, so as to shear the chemical coating from the rod. The entire surface area of
20、the coating should be in contact with the test fixture applying the load. 4.4.4.4 Test procedure. Each stabilizing rod specimen shall be tested with the test machine crosshead speed set at 2 inches + 0.250 inches per minute, specimen at time of failure shall be recorded. The maximum load carried by
21、the stabilizing rod 18 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-4 82 33A (MI) 4.4.5 Plating adequacy test (see para 4.3.3 5.1) . for this test are those prescribed by para. 4.4.1 of QQ-P-416 for cadmium plating. The procedures 4.4.6 Plat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILR48233A1980RODSTABILIZINGCOATEDFOR275INCHROCKETMOTORMK4MK40ANDMODS275 英寸 涂层 MK4MK40 MODS 火箭发动机

链接地址:http://www.mydoc123.com/p-447730.html