ARMY MIL-R-48032-1974 RING LUCKY AND INSULATOR ASSEMBLY FOR CARTRIDGE 105MM HEAT-T M456A1E1《M456A1E1 HEAT-T 105mm炮弹绝缘体装备》.pdf
《ARMY MIL-R-48032-1974 RING LUCKY AND INSULATOR ASSEMBLY FOR CARTRIDGE 105MM HEAT-T M456A1E1《M456A1E1 HEAT-T 105mm炮弹绝缘体装备》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-R-48032-1974 RING LUCKY AND INSULATOR ASSEMBLY FOR CARTRIDGE 105MM HEAT-T M456A1E1《M456A1E1 HEAT-T 105mm炮弹绝缘体装备》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、NIL-R-48032 13 W 9999906 0315540 1 W 9-37-05 MIL-R-48032 (PA) 22 January 1974 MILITARY SPECIFICATION RING LUCKY AND INSULATOR ASSEMBLY PARTS FOR, ASSEMBLY AND PACKING FOR CARTRIDGE, 105MM, HEAT-T, M456AlEl This specification is approved for use by all Departments and Agencies of the Department of De
2、fense. 1. SCOPE 1.1 This specification covers the parts for, assembly, and packing for one type of Ring Lucky and Insulator Assembly for Cartridge, lO5MM, HEAT-T, M456AlEl. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for propos
3、al form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-2550 - STANDARDS MI LI TARY MIL-STD-105 - MIL-STD-109 - MIL-STD-202 - MIL-STD-1168- MIL-STD-1169- MIL- S TD - 1 2 3 5- Ammunition and Special Weapons, General Specification for Sampling Procedures and
4、Tables for Inspection by Attributes (ABC-STD-105) Quality Assurance Terms and Definitions Test Methods for Electronic and Electrical Component Parts Lot Numbering of Ammunition Packaging , Packing and Marking for Shipment of Inert Ammunition Components Single and Multilevel Continuous Sampling Proce
5、dures and Tables for Inspection by Attributes FSC: 1315 A Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-48032 13 777770b 03115543 3 = MIL-R-48032 (PA) DRAWINGS ARMY 9256836 - Ring Lucky and Insulator Assembly (Copies of specifications, standa
6、rds, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the procurlng activity or as directed by the contracting officer). 3. REQUIREMENTS 3.1 Material.-Materials shall be in accordance with applicable drawings and specificatio
7、ns. 3.2 Ring Lucky and Insulator Assembly.-The ring lucky and insulator assembly shall comply with all requirements specified on drawing (dwg.) 9256836, and on all other applicable drawings and specifications. 3.2.1 Mechanical Strength.-The segment lucky shall withstand a compressive load of 50,000
8、psi minimum (min.) without cracking or yielding. shall have a Taezo-electric coefficient, than i5 x 10- charge to the load and is measured along til2 axis of polar- ization. Polarity markings shall be as specified. 3.2.2 Lucky Activity and Polarity.-The segment lucky of not less coulombs per pound w
9、here d333relates the 3.2.3 The dielectric constant of the segment lucky shall not vary more than plus or minus (+) 40 percent (%) from its room temperature value as its temperature is continuously varied over the range of -65 degrees Fahrenheit (OF) to 160 OF. Capacitance.-The segmenf21ucky shall no
10、t have a capacitancf20f less than 1400 x 10- 2000 x 10- farads. 3.2.4 farads nor more than 3.2.5 Ring Lucky Assembly Activity and Polarity.-Each segment lucky on the ring electrode shall teive a piezo-electric coefficient, d 33relates the charge to the load and is measured pound where d of not less
11、than 9 x 10- coulombs per 33 2 i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-48032 33 m 7777706 0335542 5 m -R-48032 (PA) along the axis of polarization. Activity shall indicate that the positive poled lucky face is cemented to the ring ele
12、ctrode. 3.2.6 Lucky Assembly Voltage Breakdown.-Each segment lucky on the ring lucky assembly shall withstand application of i500 volts min. direct current (DC) for a min. duration of 2 seconds, without visible disruptive discharge. 3.2.7 Lead Wire Pull Test.-The lead wire joint 3.2.8 must withstand
13、 a direct pull of forty (40) pounds, minimum. assembly shall not become loose or unbonded after being sub- jected to the adhesion test. Adhesion.-Adhesive bonded parts of the ring lucky 3.2.9 Insulator Voltage Breakdown.-The insulator shall withstand minimum application of 2000 volts DC for a durati
14、on of 2 seconds, minimum without visible disruptive discharge. 3.2.10 Insulator Resistance.-Electrical resistance measBred across the rear web of the insulator shall be no less than 10 ohms. 3.3 Workmanship.-The assembly and all components shall be of the proper finish, free of cracks or burrs; and
15、chips, dirt, grease, rust or other foreign material. The cleaning method shall not be injurious to any of the parts, nor shall the parts be contaminated by the cleaning agents. submission of first article sample inspection in 4.2. 3.4 First Article.-This specification makes provisions for 4. QUALITY
16、 ASSURANCE PROVISIONS 4.1 Responsibility for Inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or order, the supplier may use his
17、own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure sup
18、plies and services conform to prescribed requirements. Reference shall be made to Standard MIL-STD-109 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-48032 13 7797906 0315543 7 m MIL-R-48032 (PA) to define terms used herein. MIL-A-2550 shall
19、 apply. The provisions of Specification 4.1.1 Submission of Froduct.-At the time each completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the informa
20、tion provided is correct and applicable to the product being submitted: a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specification number and date, together with an identification and date of changes thereto. c. A s
21、tatement that all material purchased by the contractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. d. Number of items in the
22、lot. e. Date submitted. f. Provisions for submission of first article samples. The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shal-l be substantiated by evidence of the agents authority to bind his principal. Substantiation of
23、 the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First Article Inspection 4.2.1 Submission.-Prior to initiation of regular production, the contractor shall
24、submit a first article sample to the Government facility designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2. The first article sample shall consist of twenty-five (25) assemblies and twenty-five (25) complete sets of parts which have been produced by the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILR480321974RINGLUCKYANDINSULATORASSEMBLYFORCARTRIDGE105MMHEATTM456A1E1M456A1E1HEATT105MM 炮弹 绝缘体

链接地址:http://www.mydoc123.com/p-447724.html