ARMY MIL-Q-50386-1970 QUANDRANT GUNNER'S M1A1E1《M1A1E1炮手信号区》.pdf
《ARMY MIL-Q-50386-1970 QUANDRANT GUNNER'S M1A1E1《M1A1E1炮手信号区》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-Q-50386-1970 QUANDRANT GUNNER'S M1A1E1《M1A1E1炮手信号区》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、1.1 fhis specification covers one type of gunners guadrant which The level vial-in this quadrant measures angles of cant and elevation. is radioactively illuminated. ! 2. APPLCAijLE DOCrnNTS 2.1 The following documents, of the issue in eiect on date of invitation for bids or request for proposals, f
2、orm a .part of this specifi- cation to the extent specified herein. . S?ECIFICATIOKS Xilitary MIL-F-13926 HIL-P- I4232 MIL- 1-45 60 7 STANDARDS Mi 1 I tap MIL-STD-105 MIL-STD- 109 D.S. Any, Frankford Arsenal 2.6510977 ES392 946 A8 6 5 89 4G k si731007 y-. i173 1037 Fire Conerol Xateriel: General Spe
3、cifi- _ cation Governing the Manufacture and Inspection Parts, Equipaent and Tools for Amy Materiel, Packaging and Packing of Inspection Equipment, Supply and Maintenance of Sampling Procedures and Tables for Quality Assurance Tenns and Definitions Inspection by Attributes i3levation Tesz Pixtc2re A
4、ssembly Adapter Levei Tesr Qua-rzt, adraiz:, 2mmr s: MALE1 Packaging of QLidraiit, Gunner Is: ML41El FSC 1290 THIS DOCUMENT CONTAINS 9 PAGES. - / .II ri Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- ._ _. . . _ . MIL-Q-503b 12 9779906 032b9q1 -I.-
5、.-, .rr ?thin 0.40 - mil . .- - 3.7 Torque.- The running torquenequired to rotate the microneter knob shall not exceed 2.0 pound-inches at the operaring temperatures specified in 3.4.2. 3.8 Level vial.- The level vial bu5ble shall be visible in all mbient light conditions, 4. QUALTY ASSURANCG PROVIS
6、I0;NS 4.1 Responsibility for inspection.- Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of ali inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or ay other facilitie
7、s sugtable for the performance of the inspection re- quirements specified herein, unless disapproved bythe Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to sssure supplies and services confor
8、m to prescribed requirements, 4.1.1 General provisions.- The component and subassembly inspec- tion requirements of HIL-F-13926 form a part of the quality assurance provisions of this specification. Definitions of inspection terms shall be as listed in MIL-STD-109, 4.2 First article (initial product
9、ion) opprovz1.- The requirement for first article approval and the responsibility (Goverment or contractor) for first article testing shall be as specified in the contract. sample for first article approval tests shall consist of three gunners quadrants plus three (3) each of all items covered by SQ
10、AP. The sample shall be manufactured in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as used in regular production. The 4.2.1 G
11、overmen-c testing.- When the Government is responsible for conducting fist arcicie ap2rova3. tests, the contractor, prior to su3- mitting the sm?le to the Government, shall inspect the san2le to in- sure that it conform to ali the equFrements of the contrecc and sub- mit a record of this insyxEion w
12、ith the sa=?ie, inciudiag certificates of confornazice for mazerials a 4.2.2 Contractor testin:.;. - When the coatractor is responsijie for conduciling first arricle a?LovaI tests, the sanple shall be inspected by the contractor :or all tlie requirments of the contract. he senple . -. . 3 Provided b
13、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-Q-5038b 12 m 777770b 032b743 L m nG a recorci of this inspecxion, including cezeificstec of coiifoimazce for niaterials shall be sthiitted to the Goverriant for approval, The Goverment reserves the right to w
14、itness the contractors inspection. 4.3 Ins?ecltion provisions. 4.3.1. Sr;bnission of product,- Unless otherwise specified by the contracting officer, inspection lot size, lot formation and presentation of lots shall be in accordance with “Submission of Product“ provisions of KZL-SID-105 . 4.3.2 Exmi
15、nation and tests. 4.3.2.1 Conponents an6 subassemblies.- All components and sub- asser;lD%es shall be inspecred in accordance with the inspection provisions contained in Supplementary Quality Assurance Provisions (SQAP) listed in the technical data package (TDP). In the absence of SQAPS the applicab
16、le Quality Assurance Provisions of MIL-F-13926 shall apply, Examination and tests reiated to Section 3 herein shall be perforned on a single defect (individual characteristic) basis in accordance with MIL-STD-105 and the sampling plans specified in Tables I, II and TI1 herein. Ex- amination and test
17、s for packaging, packing, and marking shall be in accordance with NIL-P-14232 and Section 5 herein. The tabulated classi- fication of defects shall constitute the Uiininum inspection to be per- formed by the supplier after first article approval and prior to Govern- ment acceptance or rejection by i
18、tem or lot. TABLE I CL4 SS IF1 CATIOX CRITICAL; MAJOR: AQL 1.0% Defective - 10 1 . Index alinement 102. Accuracy 103. Torque 104. Level vial visibility . .; :- . :r - . . . - . . -_ . -. . . i. . . .- . Y- RZQUIREKE3!T TEST PROCEDURE ., -. - . . 3.5 3.6 3.7 3.8 4.6.3 4.6.4 4.6.5 4.6.6 KTE: The tests
19、 in Table I shali De condurxe ar a standard ambient temperature of between 60“ and 90F. 4.3.3 AcceFtance and rejection.- Xsjectea lots shali be screened for ail defective characteristics o Renoval or correctton of defective units and resubmtetence of rejected lots sGz.17, be in accordance with “Acce
20、ptance ad Xe jectior as specified in XXL-STD-105. -. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-h* all inspection equipment specified Dy drawing number .in specifi- cations or SQAP forming a part of the contract shall be supplied by the . cont
21、ractor in accordance with technical data listed in the Lht of Inspection DocGents when provided with the Technical Data Package (TDP). 4,5.2.2 Contractor design.- The contractor shall provide inspection equipment compatible with the “Test Xethods and Procedures“ specified in 4,6 of this specificatio
22、n and with the “Component Inspection“ and “Test Facilities“ requirements of MIL-F-13926, Since tolerance of test equip- ment is norinally considered to be within 10% of the product tolerance for which it is intended, this inherent error in the test equipment design must be considered as part of the
23、prescribed product tolerance limit. Thus, concept, construction, materials, dimensions and tolerances used in the design of test equipment shall be so selected and controjlled as to insure that the test. equipment will reliably indicate acceptability of a product which does not exceed 90% of the pre
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILQ503861970QUANDRANTGUNNER SM1A1E1M1A1E1 炮手 信号 PDF

链接地址:http://www.mydoc123.com/p-447636.html