ARMY MIL-PRF-32294-2008 CAP BLASTING NON-ELECTRIC - M7 CAP BLASTING PRACTICE INERT NON-ELECTRIC - XM30《M7型非电爆雷管和XM30型非电爆惰性练习雷管》.pdf
《ARMY MIL-PRF-32294-2008 CAP BLASTING NON-ELECTRIC - M7 CAP BLASTING PRACTICE INERT NON-ELECTRIC - XM30《M7型非电爆雷管和XM30型非电爆惰性练习雷管》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-PRF-32294-2008 CAP BLASTING NON-ELECTRIC - M7 CAP BLASTING PRACTICE INERT NON-ELECTRIC - XM30《M7型非电爆雷管和XM30型非电爆惰性练习雷管》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-PRF-32294 (AR) 13 June 2008 PERFORMANCE SPECIFICATION CAP, BLASTING, NON-ELECTRIC - M7 CAP, BLASTING, PRACTICE, INERT, NON-ELECTRIC - XM30 This specification is approved for use by the U.S. Army Armament Research, Development, and Engineering Center (ARDEC) and is available for use by all Depar
2、tments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification describes the performance requirements and the verification provisions for the CAP, BLASTING: non-electric, M7 and the CAP, BLASTING, PRACTICE: inert, non-electric, M7. 2. APPLICABLE DOCUMENTS 2.1 General. The d
3、ocuments listed in this section are in sections 3 or 4 of this specification. This section may not include all documents referred to in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this l
4、ist, document users are cautioned that they must meet all the specified requirements of documents cited in sections 3 and 4 of this specification, whether or not documents are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, a
5、nd handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract (see 6.2). NORTH ATLANTIC TREATY ORGANIZATION STANDARDIZATION NATO AOP-7 Manual of Data Requirements and Tests for the Q
6、ualification of Explosive Materials for Military Use AMSC N/A FSC 1375 DISTRIBUTION STATEMENT A: Approved for public release distribution is unlimited.Comments, suggestions, or questions on this document should be addressed to Commander, ARDEC, ATTN: AMSRD-AAR-QES-E., Picatinny, NJ 07806-5000 or ema
7、iled to ardecstdznconus.army.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at http:/assist.daps.dla.mil INCH-POUNDProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IH
8、S-,-,-MIL-PRF-32294 (AR) 2 DEPARTMENT OF DEFENSE STANDARDS MIL-STD-286 - Propellants, Solid: Sampling, Examination and Testing MIL-STD-331 - Fuze and Fuze Components, Environmental and Performance Tests for MIL-STD-464 - Department of Defense Interface Standard, Electromagnetic Environmental Effects
9、, Requirements for Systems MIL-STD-650 - Explosive: Sampling, Inspection and Testing MIL-STD-810 - Environmental Test Methods and Engineering Guidelines MIL-STD-1168 - Ammunition Lot Numbering MIL-STD-1916 - DOD Preferred Methods for Acceptance of Products MIL-STD-2105 - Hazard Assessment Tests for
10、Non-Nuclear Munitions (These documents are available online at http:/assist.daps.dla.mil/quicksearch/ or from the Standardization Documents Order Desk, 700 Robbins Avenue Bldg. 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Governm
11、ent documents, drawings, and publications form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents are those specified in the solicitation or contract (see 6.2). PUBLICATIONS TB 700-2 - Department of Defense Explosives Hazard Classif
12、ication (This document is available online at https:/www3.dac.army.mil/es/documents/TB700_2.pdf, or from the DoD Explosives Safety Board, Room 856C, Hoffman Building 1, 2461 Eisenhower Avenue, Alexandria, VA 22331-0600.) FIELD MANUALS FM 3-34.214 - Explosives and Demolitions (This Field Manual may b
13、e viewed and printed at http:/www.apd.army.mil/, or ordered from Commandant, U.S. Army Engineer School, Ft. Leonard Wood, MO 65473-6650.) US ARMY DEVELOPMENTAL TEST COMMAND ITOP 1-2-601 - Laboratory Vibration Schedules, ITOP 4-2-602 - Rough Handling (Copies of these documents may be ordered from the
14、 US Army Developmental Test Command, ATTN: Publications, 314 Longs Corner Road, Aberdeen Proving Ground, MD 21005-5005, or online at http:/www.dtc.army.mil/publications/topsindex.aspx.) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-32294 (A
15、R) 3 2.3 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this specification and the references cited herein, the text of this specification takes precedence. Nothing in this document, however, supersedes applicable laws and regula
16、tions unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Design verification. When specified (see 6.2), a sample of the M7 shall be subjected to design verification in accordance with 4.1. 3.2 First article. When specified (see 6.2), a sample of the M7 shall be subjected to the first
17、 article inspection in accordance with 4.2. 3.3 Conformance inspection. When specified (see 6.2), a sample of the M7 shall be subjected to conformance inspection in accordance with 4.3. 3.4 Interface and interoperability. 3.4.1 Blasting cap body dimensions. The length of the blasting cap shall be no
18、t less than 2.25 inch and not greater than 2.35 inch. The outside diameter shall be not less than 0.230 inch and not greater than 0.241 inch. 3.4.2 Blasting cap body material. The blasting cap body shall be capable of protecting energetic material and sufficiently strong to allow insertion into M112
19、 demolition blocks at room temperature. An extruded aluminum cup with side-wall thickness within the range of 0.008 to 0.011 inches has been found acceptable in the past. 3.4.3 Time fuse interface. The blasting cap shall be capable of being securely crimped to an M700 time fuse. 3.4.4 Energetic Mate
20、rial loading. Energetic materials shall be loaded to leave not less than 0.75 inches of open cap for safe insertion and crimping of time fuse. 3.4.5 Loose/Compacted Powder (critical). The M7 shall show no evidence of loose or compacted powder on the cups outer walls or inner walls above ignition col
21、umn. 3.4.6 Cap split or cracked (critical). The blasting cap shall not be split or cracked to expose the explosive charge or show evidence of explosive leakage. 3.4.7 Inert blasting cap. Inert blasting cap shall utilize the same body as the energetic M7 except for loading and marking as indicated. 3
22、.4.7.1 Inert blasting cap loading. M7 inert blasting cap shall use a non-energetic fill that contains no ferric iron oxide. 3.4.7.2 Inert blasting identification. M7 inert caps shall have four (4) holes drilled on the circumference of the inert blasting cap using a 35-43 drill bit size or its equiva
23、lent to Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-32294 (AR) 4 establish an unobstructed view through the inert blasting cap and inert fill. These holes shall be 90 degrees apart. The word “inert” is to be legible and marked on two side
24、s opposite each other. 3.5 Operating requirements. 3.5.1 Initiation performance. The M7 shall be capable of being initiated by M700 Time Blasting Fuse. The blasting cap shall detonate completely as evidenced by initiating the following military explosives: C-4 blocks, 15/40 lbs. Shaped Charges, and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILPRF322942008CAPBLASTINGNONELECTRICM7CAPBLASTINGPRACTICEINERTNONELECTRICXM30M7 型非电爆 雷管 XM30 惰性

链接地址:http://www.mydoc123.com/p-447153.html