ARMY MIL-P-70528-1990 PROJECTILE 105MM HE RA XM913 XM927 DELAY ASSEMBLY PARTS FOR《XM913 XM927式105 mm火箭助推榴弹(HE RA)用延期组合件零部件》.pdf
《ARMY MIL-P-70528-1990 PROJECTILE 105MM HE RA XM913 XM927 DELAY ASSEMBLY PARTS FOR《XM913 XM927式105 mm火箭助推榴弹(HE RA)用延期组合件零部件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70528-1990 PROJECTILE 105MM HE RA XM913 XM927 DELAY ASSEMBLY PARTS FOR《XM913 XM927式105 mm火箭助推榴弹(HE RA)用延期组合件零部件》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-70528 (AR) MILITARY SPECIFICATION 29 OCTOBER 1990 PROJECTILE, 105MM, HE, RA, XM913/XM927 DELAY ASSEMBLY PARTS FOR This specification is approved for use within the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of
2、. Defense. 1. SCOPE 1.1 Scope. This specification contains requirements and quality assurance protrisions for the fabrication and packaging of delay assembly parts for the 105MM Rocket Assisted Projectiles, XM913 and XM927 (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specificat
3、ions, standards and handbooks. Unless otherwise specified (see 6.2), the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification to the extent
4、 specified herein. SPECIFICATIONS MILITARY MIL -A-4 8 0 7 8 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS MILITARY M IL-STD-1169 - Packaging, Packing and Marking for Interplant Shipment of Inert Ammunition Btoeciai commaits (ncamedatioao, additioos, delttio
5、as) and any pertinent data which may be of ux in improviog this clocment distribution is unlimited, J Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-c ?* MIL-P-70528 23 777770b OL162202 - MIL-P-70528 (AR) (Unless otherwise indicated, copies of feder
6、al and military specifications, standards, and handbooks are available from: Military Specifications and Standards, Bldg 4D, 7VV Robbins Avenue, Philadelphia, PA 19111-5094.) 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawinqs, and publica
7、tions form a part of this specification t the extent - specified herein. DRAWINGS (See 6.5) US ARMY RESEARCH, DEVELOPMENT AND ENGINEERING CENTER PRODUCT AND PACKAGING DRAWINGS 12929177 - Housing, Delay 9381149 - Closure, Delay (Copies of handbooks, drawings, and publications required ARDEC) by manuf
8、acturers in connection with specific acquisition functions should be obtained from the contracting officer.) 2.2 Order of precedence. In the event o a conflict between the test of this document and the references cited herein the text of this document takes precedence. Nothing in the document, howev
9、er, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials. Materials shall be in accordance with the applicable drawings and specifications. 3.2 Parts. The parts shall comply with all requirements specified on drawings listed in 2.1 a
10、nd associated drawings and with all requirements specified in applicable specifications and standards. 3.3 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of the first article sample by the contractor shall be a
11、s specified in the contract. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 MIL-P-70528 13 W 7999906 Oqb2102 T H MIL-P-70528 (AR) 3.4 Workmanship. All parts shall be fabricated and finished in a thorough, workmanlike manner. They shall be free o
12、f burrs, chips, sharp edges, unblended radii, tears, holes, porosity, dirt, and grease. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1
13、Responsibility for inspection. Unless otherwise specified herein or in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the c
14、ontractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in this specification where such inspection are deemed nec
15、essary to ensure supplies and services conform to prescribed requirements. 4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality progra
16、m. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing o
17、perations, in an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of known defect material, either indicated or actual, nor does it commit the Government to accept defective material. 4.2 Classification of inspections. The following types of i
18、nspection shall be conducted on this item: a. First Article Inspection b. Quality Conformance Inspection - 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70528 (AR) 4.3 First article inspection. 4.3.1 Submission. The contractor shall submit
19、a first article sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of the following items in sample quantities as indicated: Part description Drawings Quantity Housing, Delay Cap, Selector Washer, Delay Gasket
20、 Closure, Delay 12929177 10 9381139 10 9381145 10 9381148 10 9381149 20 (Consecutively produced from each cavity of each mold 4.3.2 Inspections to be performed. See MIL-A-48078 and Table I specified herein. 4.3.3 Rejection. See MIL-A-48078. 4 Provided by IHSNot for ResaleNo reproduction or networkin
21、g permitted without license from IHS-,-,-c O c, u a, C a, rl u .rl +i u a -rl % .FI Oe . H M d A E a O ri el c ri N m dc ln N N N N N di dc di dc di dc dc di dc di . . . . . . . . . . *. N N N N N * * * . m M m m rn h CI 3 a u m m .m m m rl rl N rl rl .FI 5 Provided by IHSNot for ResaleNo reproducti
22、on or networking permitted without license from IHS-,-,-MIL-P-7052 13 W 7777906 04b2105 5 I -1 MIL-P-70528 (AR) 4.4 Quality conformance inspection. 4.4.1 Inspection lot formation. Inspection lots shall comply with the lot formation provisions of MIL-A-48078. 4.4.2 Examination and tests. a. Classific
23、ation of Characteristics. Quality conformance examinations and tests are specified in the following Classification of Characteristics paragraphs. The contractors quality program or detailed inspection system shall provide assurance of compliance of all characteristics with the applicable. drawing an
24、d specification requirements utilizing as a minimum the conformance criteria specified herein. Attributes sampling inspection shall be conducted in accordance with Table II below, using the inspection levels cited in the Classification of Characteristics paragraphs. TABLE II 0 - 1 ATTRIBUTE PLANS IN
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP705281990PROJECTILE105MMHERAXM913XM927DELAYASSEMBLYPARTSFORXM913XM927 105 MM 火箭 助推 榴弹 HERA 延期

链接地址:http://www.mydoc123.com/p-446906.html