ARMY MIL-P-70525 (6)-2002 PROJECTILE 105MM HE RA XM913 XM927 MOTOR BODY BONDING ASSEMBLY FOR《XM913 XM927式105 mm火箭助推榴弹(HE RA)用引擎体粘合组件》.pdf
《ARMY MIL-P-70525 (6)-2002 PROJECTILE 105MM HE RA XM913 XM927 MOTOR BODY BONDING ASSEMBLY FOR《XM913 XM927式105 mm火箭助推榴弹(HE RA)用引擎体粘合组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70525 (6)-2002 PROJECTILE 105MM HE RA XM913 XM927 MOTOR BODY BONDING ASSEMBLY FOR《XM913 XM927式105 mm火箭助推榴弹(HE RA)用引擎体粘合组件》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、M distribution is unlimited.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70525 (AR)AMENDMENT 6* 3.3.5.3, Delete in its entirety and substitute the following :“3.3.5.3 Surface voids. Surface voids shall not exceed l/16 inch in greatest dimens
2、ion, the totalnumber of voids in a square inch area shall be less than 10 with a total area of less than .25 squareinches.”3.7, Delete in its entirety and substitute the following:“3.7 Proving ground test. There shall be no motor body bonding assembly related prematureexplosive function, collapse, s
3、eparation or break-up of metal parts in the gun bore or in flight.Testing shall be as specified in 4.5.8.”3.8.2, Delete “(See Figure 1)” and substitute “(See Figure 3)”PAGE 10Add new Figure 3 as included page 10a.PAGE 124.3.1.1:Line 3, change “4.32” to “4.3.1.2”Change “Finished Machined Motor Bodies
4、 Unpainted and Unknurled” to “MechanicalProperties”Delete, “4.4.3.214.5.5” and substitute “4.4.3.1/4.5.7”PAGE 14Table I:Under “Finished Machined Motor Bodies Unpainted and Unknurled”, Delete“4.4.3.2i4.5.5” andsubstitute “4.4.3.1/4.5.7”Under “Nozzle Inserts, Compression Test”, Delete “3.6.1” and subs
5、titute “3.8.1”Under “Radiographic Inspection”, Delete “3.62” and substitute “3.82”PAGE 174.4.2.1, Delete the title in its entirety and substitute “Motor Body, Prior to Weld”2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MLP-70525 (AR)AMENDMENT bX-R
6、AY INSPECTION ZONESFigure 3. X-ray of nozzle.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.4.2.2 :MIL-P-70525 (AR)AMENDMENT 6PAGE 18Delete title in its entirety and substitute “Motor Body, Protective Coating”Add the following Specials:“2. Ultraso
7、nic C-Scan test 100% 3.63. Ultrasonic C-Scan test stamp missing 100% 3.2Major 107, Add “(if applicable)”PAGE 204.4.2.2:Delete paragraph number “4.4.2.2” and substitute “4.4.2.3”Delete Major defects 102 and 103 in their entirety and substitute the following:“102. Salt spray test 4.4.3.6.1 3.2103. Pro
8、tective coating and thickness 4.4.3.6.2 3.2Major 104, Change “3.10” to “3.2”Major 134, Delete in its entirety.Delete Major defects 142 and 143 in their entirety and substitute the following:“142. Mechanical properties of body 4.4.3.1.2 3.2143. Properties of rotating band weld 4.4.3.2 3.2Add new mino
9、r defect 211 as follows:“2 11. Radius at cavity base Level V 3.2PAGE 234.4.2.4:4.5.4Visual”4.5.5.14.5.5.2”4.5.74.5.2”4.4.3.7lGage”Delete Major 101, 102, 103, and Minor 201 in their entirety and substitute the following:“ 10 1. Radiographic inspection 100% 3.8.2 4.5.3.2102. Grain flow 4.4.3.5.1 3.2 4
10、.4.3.5.24Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70525 (AR)AMENDMENT 6103. Compression test 4.4.3.5.1 3.8.1 4.5.3.1201. True position of throat diameterwith outside diameter Level V 3.2 Gage”Major 105, Delete “(2 Places)”Add Major 111 a
11、s follows:“111. Angle, aft end Level III 3.2 Gage”PAGE 244.4.2.5:Delete Major defect 101 and 102 in their entirety and substitute the following:“101. Adhesive not present on forward O.D. nozzle edge or rear nozzle I.D. edge (360 degreescoverage required) 100% 3.2 Visual102. Gap between aft end of no
12、zzle and motor body Level III 3.2 Gage”4.4.3.2.1:Delete the second and third sentences and substitute the following:“The chips for the sample shall consist of the copper overlay between 4.20-.Ol and 4.223-.Olinches diameter (full width). All of the chips shall be collected, crushed, and dissolved (s
13、ee6.8.1).”Sixth sentence, delete “samplie” and substitute “sample”PAGE 304.4.3.8.1:Delete “4.5.9” and substitute “4.5.8”Change “3.10” to “3.7”4.4.3.8.2:Add before the last sentence: “If the lot is rejected, the acceptance criteria reverts back to thebeginning of the paragraph.”Delete “4.5.9” and sub
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP7052562002PROJECTILE105MMHERAXM913XM927MOTORBODYBONDINGASSEMBLYFORXM913XM927 105 MM 火箭 助推 榴弹

链接地址:http://www.mydoc123.com/p-446900.html