ARMY MIL-P-70524 (7)-1997 PROJECTILE 105MM HE RA XM913 XM927 WARHEAD INSULATION ASSEMBLY FOR《105毫米炮弹 HE RA XM913 XM927绝缘弹头的组装总成》.pdf
《ARMY MIL-P-70524 (7)-1997 PROJECTILE 105MM HE RA XM913 XM927 WARHEAD INSULATION ASSEMBLY FOR《105毫米炮弹 HE RA XM913 XM927绝缘弹头的组装总成》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70524 (7)-1997 PROJECTILE 105MM HE RA XM913 XM927 WARHEAD INSULATION ASSEMBLY FOR《105毫米炮弹 HE RA XM913 XM927绝缘弹头的组装总成》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-P-70524 (7 1 U O6 2046062 628 D I INCH- PO MIL-P-70524 (AR) AMENDMENT 7 30 May 1997 SUPERSEDING AMENDMENT 6 16 May 1996 MILITARY SPECIFICATION PROJECTILE, 105MM, HE, RA, XM913/XM927 WARHEAD INSULATION ASSEMBLY FOR This amendment forms a part of Military Specification MIL-P-70524 (AR), dated 29
2、October 1990, and is approved for use by the U.S. Army Armaments, Research, Development and Engineering Center and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Title: change “XM913” .to M913” (and wherever it appears). PAGE 3 3.5 Delete in its entirely an
3、d substitute the following: “3.5 Proving ground. There shall be no warhead related premature explosive function, warhead breakup or separation of metal parts in the gun bore or in flight, when tested as specified in 4.5.8. I PAGE 4 * 3.7.1 Line 2, Delete ”100 pounds” and substitute “5000 pounds”. *
4、3.7.2 Delete in its entirety without substitution. (Note, 3.7.2 was added in amendment 6 and deleted in amendment 7) PAGE 7 4.3.1.2 Delete in its entirety. AMSC N/A 1 of 5 FSC 1315 DISTRIBUTION STAT-NT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reprodu
5、ction or networking permitted without license from IHS-,-,- MIL-P-70524 (7) Ob 204bOb3 5b4 MIL-P-70524 (AR) AMEND= 7 PAGE 8 TABLE 1, Warhead insulation and assv. Delete 9341144“ and substitute 9381144“. Warhead (prior to knurlins and threadinq) Delete “4.4.2“ and substitute “4.4.2.2“. Insulation, Bo
6、nding Assembly Pull Test: Delete 25“ and substitute 5“. Delete 4.5“ and substitute 4.5.7“. PAGE 12 4.4 -2.2 Special 1: Delete 3.9“ and substitute“3.11“. PAGE 15 4.4.2.3 Major defect 118, Delete “Effective“ and substitute “Thru“. Major defect 123, change Surface finish of base thread“ to Surface fini
7、sh of base thread undercut“. PAGE 17 4.4.2.4 Special defect 1 Delete 3.5“ and substitute “3.6“. Special defect 2 Delete “3.7“ and substitute “3.9“. Major defect 103 Delete “3 -7“ and substitute “3.9“. PAGE 21 * 4.4.2.7 Major defect 101, change “Insulation of adhesive above minimum recess: to “Insula
8、tion or adhesive above drawing requirement“. Major defect 102, delete “Ultraviolet light“. Add Major defect 103, as follows: “103, Bonding assembly pull test, 4.4.6, 3.7.1, 4.5.7“. PAGE 23 * 4.4.3.5 Delete in its entirety without substitution. (Note, 4.4.3.5 was added in amendment 6 and deleted in a
9、mendment 7 ) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-70524 (7 1 9999906 2046064 4T0 MIL-P-70524 (AR) AMENDMENT 7 PAGE 24 Add New paragraphs 4.4.6, 4.4.6.1 and 4.4.6.2. 4.4.6 Bondinq assembly pull test. Sampling for the adhesive bond
10、test of the Warhead insulator assembly consists of a process qualification and a normal sampling test. Testing shall be performed as specified in 4.5.7. qualification test shall be performed when any of the following conditions exists: The process a. The start of production. b. c. d. The bonding pro
11、cess (which includes surface preparation, e. A lapse in production has exceeded one month. f. A failure has occurred during normal sampling. The lot of adhesive resin or hardener changes. mixing of adhesive, application of adhesive, fixturing and curing conditions) changes. As part of first article
12、inspection. 4.4.6.1 Process aualification sarmlinq. A random sample of five warhead bonding assemblies shall be taken from the initial days production for testing. fails to comply with the requirements of 3.7.1, the production quantity represented by that sample shall be rejected, the process correc
13、ted and an additional sample selected. If any test sample 4.4.6.2 Normal samDlinq. Once qualified per 4.4.6.1, from each days bonding production, the contractor shall have one each assembly selected at random for testing. If any test sample fails to comply with the requirements of 3.7.1, the product
14、ion quantity represented by that sample shall be rejected and the inspection sampling will revert back to 4.4.6.1 once corrective action has been taken on the process.“ 4.5.2 Delete 3.5.3“ and substitute “3.6.3“. PAGE 28 4.5.6.2 Line 12, Delete 3.13“ and substitute 3.8“. PAGE 29 * 4.5.7 Delete in it
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP7052471997PROJECTILE105MMHERAXM913XM927WARHEADINSULATIONASSEMBLYFOR105 毫米 炮弹 HERAXM913XM927 绝缘

链接地址:http://www.mydoc123.com/p-446896.html