ARMY MIL-P-70456 C (6)-1993 PROPELLANT STICK M31A1E1 FOR USE IN CHARGE PROPELLING M203A1《M203A1式发射装药系统用M31A1E1式棒状发射药》.pdf
《ARMY MIL-P-70456 C (6)-1993 PROPELLANT STICK M31A1E1 FOR USE IN CHARGE PROPELLING M203A1《M203A1式发射装药系统用M31A1E1式棒状发射药》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70456 C (6)-1993 PROPELLANT STICK M31A1E1 FOR USE IN CHARGE PROPELLING M203A1《M203A1式发射装药系统用M31A1E1式棒状发射药》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、a . ,. ICI I INCH-POUND MIL-P-70456C (AR) AMENDMENT 6 08 December 1993 SUPERSEDING AMENDMENT 5 6 July 1993 MILITARY SPECIFICATION PROPELLANT, STICK, M31AlE1 FOR USE IN CHARGE PROPELLING M203A1 This Amendment forms a part of Military Specification MIL-P-70456C (AR) dated 28 April 1989, and is approve
2、d for use by the US Army Armament Munitions and Chemical Command and is available for use by all Departments and Agencies of Department of Defense. PAGE 2 2.1.2 Add the following new drawing: “9345098 - Body, Molded“ PAGE 5 3.4.3 Delete the number I129l1 and substi-Ute with the number 1t28.511 where
3、ver it appears in the paragraph. 3.9.1.2 Delete in its entirety and substitute new paragraph 3.9.1.2: ll3.9.1.2 145 deqrees F Dressure. At standard weapon conditions and recommended charge weight, the average pressure at 145 degrees F shall not exceed 56,000 pounds per square inch (psi) (see 4.4.2.5
4、.1) .I1 PAGE 6 3.11 Delete in its entirety and substitute the following new paragraph: “3.11 Blendinq process control. A propellant lot shall be a minimum of 130,000 lbs. unless otherwise specified by the contracting officer. The contractor shall assure that each lot has been sufficiently blended to
5、 meet the ballistic uniformity requirements (see 3.9). The contractor shall submit a blending process control document to the government specifying the blending process control steps which are considered critical for meeting the ballistic uniformity requirements. The blending process control documen
6、t shall be submitted in accordance with 4.1.2.11 AMSC N/A i of a FSC 1376 DISTRIBUTON STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-7045bC (6) = 9999906 1970278 321 = MIL-P-
7、70456C (AR) AMENDMENT 6 PAGE 7 Add the following paragraphs: “4.1.3 Nonconforminq material. The contractors quality program plan (see 6.2) shall include an effective and positive system for controlling nonconforming material to include mixes, batches, or sublots of propellant that do not meet compos
8、itional requirement (see 3.2 and 4.1.3.1). The system shall include procedures for nonconforming material identification, segregation, and disposition. All nonconforming supplies shall be positively identified to prevent unauthorized use, shipment and intermingling with conforming supplies. 4.1.3.1
9、Manufacturinq process. The contractors manufacturing process shall be documented as part of the quality program plan (see 6.2). Under a batch manufacturing process, the contractor shall maintain an effective and positive system (weighing each ingredient) for controlling amounts of ingredients charge
10、d to each mixer to assure the material meets the compositional requirements (see 3.2). Under a continuous process where the batch system is not applicable, the contractor shall maintain an effective and positive system for controlling amounts of ingredients charged to each mixer to assure the materi
11、al meets the compositional requirements (see 3.2). For an unproven propellant manufacturing process which is significantly different from the present propellant manufacturing process, the contractor shall submit his proposed process control system for meeting compositional requirements in the form o
12、f a process control document to the contracting officer for approval by the technical agency. The contractor shall not initiate production without written approval of the process control document from the contracting officer. Once approved the contractor shall not change the process without approval
13、 from the contracting officer (see 6.13).“ PAGE 8 4.3.2.2 Delete in its entirety and substitute new paragraph 4.3.2.2: “4.3.2.2 Testinq to be performed. The following test program shall be used for the first article test. (The first article test is a qualification test for a new contractor or a majo
14、r process change. Once a contractor has demonstrated the ability to produce acceptable stick propellants the first article test may be waived by the Contracting Officer. The 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-7045bC (6) 9999906 L
15、970279 268 MIL-P-70456C (AR) AMENDMENT 6 following test program (see Table III) is the minimum test requirement for the first article test and shall be used when the stick propellant manufacturing process is not significantly different from the present propellant manufacturer. If the new contractors
16、 process or the proposed process change is found to be significantly different from the present manufacturing process, additional testing may be required to qualify the process difference.) TABLE III. FIRST ARTICLE TEST. Test Temp No. of No. of Phase (Deq F) Calibration Rds Test Rds TECOM TOP Propel
17、lant Checkout 70 145 -60 Sequential Environ- mental 145 15 -60 15 PAGE 11 10 TOP-4-2-504 10 TOP-4-2-504 10 TOP-4-2-504 60 60 TOP-4-2-504 TOP-4-2 -504“ 4.4.2.5 Delete in its entirety and substitute new paragraph 4.4.2.5: “4.4.2.5 Permissible individual maximum Pressure. If at any time during testing,
18、 an individual pressure greater than that specified in 3.9.1.1 is observed, testing shall cease and the lot shall be rejected. It PAGE 12 4.4.2.5.1 Delete in its entirety and substitute new paragraph 4.4.2.5.1: “4.4.2.5.1 Averaqe 145 deqrees F Pressure. If the average pressure at 145 degrees F excee
19、ds 56,000 pounds per square inch (psi), the lot shall be referred.“ 4.4.3 Delete the number it2911 and substitute with the number It28.5l1. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1L-P-7045bC (6) 9999906 I1970280 TBT M AMENDMENT 6 MIL-P-704
20、56C (AR) PAGE 13 4.5.1.3 Delete in its entirety and substitute new paragraph 4.5.1.3: Il4.5.1.3 Lenqth. Five hundred (500) sticks shall be randomly selected from each sublot and measured by gage for length. If one stick is found to be exceeding the maximum length requirement, the sublot shall be rej
21、ected. Sticks with a length shorter than the minimum requirement shall be classified by the degree of deviation from the minimum length. The basis for rejection of a sublot shall be: (1) Reject if more than 14 sticks are found shorter than 28-13/16 inches. (2) Reject if more than 7 sticks are found
22、shorter than 28-9/16 inches. (3) Reject if one or more sticks are found shorter than 28-1/2 inches. A 100% inspection on stick length shall be done on the rejected sublot. Each stick shall be measured by gage and any stick which does not meet the length requirement should be removed from the sublot.
23、 The final blending on the entire lot should not be initiated until all sublots are found to be meeting the stick length requirement. The gage design for propellant length measurement shall be submitted to the technical agency for approval.11 PAGE 14 4.5.1.4.1 Delete in its entirety and substitute n
24、ew paragraph 4.5.1.4.1: Il4.5.1.4.1 Carbon black. The actual percentage of carbon black shall be determined in accordance with Method 308.1 or 309.1, MIL-STD-286. I 4.5.1.5 Delete in its entirety and substitute new paragraph 4.5.1.5: ll4.5.1.5 Charqe weiqht loadabilitv. Five (5) 28.5 lb stick propel
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP70456C61993PROPELLANTSTICKM31A1E1FORUSEINCHARGEPROPELLINGM203A1M203A1 发射 系统 M31A1E1 式棒状 PDF

链接地址:http://www.mydoc123.com/p-446873.html