ARMY MIL-P-70447-1984 PROJECTILE PRACTICE 155MM M804 LOADING ASSEMBLING AND PACKING《M804式155 mm训练弹的填装 组装和包装》.pdf
《ARMY MIL-P-70447-1984 PROJECTILE PRACTICE 155MM M804 LOADING ASSEMBLING AND PACKING《M804式155 mm训练弹的填装 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70447-1984 PROJECTILE PRACTICE 155MM M804 LOADING ASSEMBLING AND PACKING《M804式155 mm训练弹的填装 组装和包装》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-70447 13 W 9999906 0354585 9 E MIL-P-70447 (AR) 14 May 1984 MILITARY SPECIFICATION PROJECTILE, PRACTICE, 155MM, M804 LOADING, ASSEMBLING AND PACKING This specification is approved for use by the U. S. Army Armament, Munitions and Chemical Command and is available for use by all Departments and
2、 Agencies of the Department of Defense. SCOPE 1. - 1.1 Scope. This specification covers the loading, assembling and packing for the Projectile, Practice, 155MM, M804. 2. APPLICABLE DOCUMENTS 2.1 Government Documents 2.1.1. Specifications and standards. Unless otherwise specified (see 6.2), the follo
3、wing specifications and standards of the issue listed in that issue of the Department of Defence Index of Specifications and Standards (DODISS) specified in the solicitation, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard
4、Quality Assurance Provisions, General Specification For STANDARDS MILITARY MIL-STD-105 - Inspection by Attributes 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this specification to the extent specifi
5、ed herein. FSC 1320 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Arm Armament Research and Development Center, Attn. DRSMC-QA, Dover, New Jersey 07801 by using the self-addresse
6、d Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. I - r - -7- c %. - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70447 13 = 77777Ob 035q5Bb O MIL-P-70447 (AR) DRAWINGS (see 6.
7、8) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC) 8797088 - Spacer 9331794 - Projectile, 155MM: Practice M84, Assembly and Marking Diagram 9331807 - Packaging and Marking for Pallet, Wood, Ammunition for Projectile, 155MM, Practice, M804 9340773 - Liner, Suppl. Chg., Smoke 9354433 - Alterna
8、te Packaging and Marking for Pallet, Wood, Ammunition, for Projectile, 155MM, Practice, M804 i I (Copies of specifications, standards, handbooks, drawings and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or
9、as directed by the contracting officer.) 2.2 Other publications. The following documets forms a part of this specification to the extent specified herein. The issues of the documents which are indicated s DoD adopted shall be the issue listed in the current DoDISS and ther supplement thereto, if app
10、licable. ANSI B46.1 - Surface Testure (Application for copies should be addressed to the American National Stantards Institute (ANSI), 1430 Broadway, NY, NY 10018). 2.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of
11、 this specification shall take precedence. 3. REQUIREMENTS 3.1 Material. Materials, parts and assemblies shall comply with the requirements specified on the applicable drawings and specifications. 3.2 Projectile assembly. The. Projectile Assembly and components shall comply with all requirements spe
12、cified on Drawing (Dwg.) 9331794 and with all requirements specified in applicable specifications. 3.2.1 Smoke canister. There shall he no foreign matter or smoke composition on the exterior of the canister. 3.3 Proving qround. The projectiles, when tested as specified, shall show no loss or break-u
13、p of metal components. The fuzed projectile shall on impact, produce a smoke signature visible across 4000 meters of level terrain. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-iOLILI7 13 W 7797706 0359587 2 = MIL-P-70447 (AR) 3,4 First ar
14、ticle inspection. This specification makes provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3,5 Workmanship. The requirements for workmanship are as shown on the applicable drawings and specific
15、ationsand the following: 3.5.1 Surface preparation. Preparation of metal surfaces shall be as specified on the applicable drawings and specifications. Cleaning and preparation are required by component details, the finish specified shall apply to indicated surfaces regardless of contour configuratio
16、n. 3.5.2 Paintinq. Painting shall comply with the requirements of the applicable drawings and specifications. All paint shall be dry to the touch before packing for shipment. Drying time prior to testing.shal1 be in accordance with the applicable specification. 3.5.3 Surface finish. The requirements
17、 for surface finish are as detailed on the applicable drawing. The roughness comparison specimens prescribed by ANSI-B46.1 shall be used as a basis for surface roughness determinations. 3.5.4 Threads. Threads shall be full and undamaged for the entire minimum length or depth as specified on the appl
18、icable drawing. 3.5.6 - Burr. No part shall have a burr which might interfere with the assembly or function of the projectile or which might be injurious to personnel handling the item. 3.5.7 Foreign matter. No part or assembly shall contain dirt, grease, rust, corrosion or other foreign matter. 3.5
19、.8 Protection of rotatinq band. The machined rotating band shall be protected from being nicked, burred or otherwise damaged in subseqeunt handling prior to shipment. 4 . QUALITY ASS,URANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance. Unless otherwise specified herein
20、 or in the contract, the-provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspections. The following types of inspection shall be conducted on this item: a. First Article Inspection b. Quality Conformance Tnspection 3 Provided by IH
21、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70447 (AR) 4.3 First article inspection. 4.3.1 Submission. The contractor shall submit a first article e sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. Th
22、e first article sample shall consist of the tollowing items in sample quantities as indicated. Part Description Drawinq Quant i ty Pro ectile, 155MM, 7931794 Practice M804 Assembly and Marking Diagram 25 Liner, Suppl Chg, Smoke 9340773 5 Spacer 8798088 5 All assemblies and components shall have been
23、 manufactured using the same production processes, procedures and equipment which will be used in fulfilling. the contract. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP704471984PROJECTILEPRACTICE155MMM804LOADINGASSEMBLINGANDPACKINGM804 155 MM 训练 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446868.html