ARMY MIL-P-70439-1984 PROJECTILE 105MM M456A1 AND M622 SPIKE AND CAP ASSEMBLY《M456A1和M622式105 mm射弹用长钉和火帽组合件》.pdf
《ARMY MIL-P-70439-1984 PROJECTILE 105MM M456A1 AND M622 SPIKE AND CAP ASSEMBLY《M456A1和M622式105 mm射弹用长钉和火帽组合件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-70439-1984 PROJECTILE 105MM M456A1 AND M622 SPIKE AND CAP ASSEMBLY《M456A1和M622式105 mm射弹用长钉和火帽组合件》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-70437 13 W 9797906 035Ll288 3 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Arm Armament Research and Development Center, Attn. DRSMC-QA, Dover, New Lrsey 07801 by using th
2、e self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this l , document or by letter. fj -a7 -m- MIL-P-70439 (AR) 24 April 1984 MILITARY SPECIFICATION PROJECTILE, 105MM, HEAT-T, M456A1 SPIKE AND CAP ASSEMBLY This specification is approved for use by th
3、e US Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification contains requirements and provides quality assurance provisions for the fabrication and packing of the spike and cap assem
4、bly for HEAT-T, M456A1 Pro j ec t ile. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise specified, the followinq specifications and standards of the issue llsted in-that issue of-th Department of Defense Index of Specifications and Standards (DoD
5、ISS) specified in the solicitation, form a part of this specification to the extent spec if ied here in. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification for FEDERAL TT-C-490 - Cleaning Methods and Pretreatment of Surfaces For Organic Coa
6、tings FSC 1315 THIS DOCUMENT CONTAINS - -3) . PAGES . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-! MIL-P-70437 13 W 7779706 0354287 5 W MIL-P-70439 (AR) STANDARDS MIL I TARY MIL-STD-105 - Sampling Procedures and Tables For Inspections By Attribu
7、tes MIL-STD-1169 - Packaging, Packing and Marking For Shipment of Inert Ammunitions Components 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein. - - DRAW
8、INGS U.S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC) 9327312 - Packing and Marking for Box, Fiberboard, 9335980 - Spike and Cap Assembly 10521642 - Spike For Spike and Cap Assembly M456A1 or M456A2, or Spike Assembly M456A2 (Copies of specifications, standards, handbooks, drawings, and pub
9、lications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the Contracting Officer.) 2.2 Other publications. The following documents form a part of this specification to the extent specified herein. Unless
10、otherwise-indicated, the issue in effect on date of invitation for bids or request for proposal shall apply. ANSI-B46.1 - Surface Texture. (Application for copies should be addressed to the American National Standards Institute (ANSI), 1430 Broadway, New York, NY 10018 .) ASTM Methods - American Soc
11、iety for Testing and Materials E8 - Tension Testing of Metallic Materials E10 - Brinell Hardness of Metallic Materials, B117 - Salt Spray (Fog) Testing Test for 2 ? P Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-process controls, determined-by to
12、be used in the production of paragraph 4.3.4) MIL-P-70437 I3 U 777770b 0354270 I U MIL-P-70439 (AR) (Application for copies should be addressed to the American Society for Testing and Materials, 1916 Race Street, Phila., PA 19103.) 2.3 Order of precedence. In the event of a conflict between the text
13、 of this specification and the references cited herein, the text of this specification shall take precedence. 3. REQUIREMENTS 3.1 General. Materials, parts and assemblies shall comply with the requirements specified on the applicable drawings, referenced specifications and the following: P 3.2 Heat
14、treatment or stress relief. The heat treatment or stress relief applied shall be uniform throughout each lot of components and shall be so conducted as to produce in each component the mechanical properties specified on the applicable component drawing . 3.2.1 Cold shaping (if applicable). Cold shap
15、ing shall be so accomplished as to produce the required mechanical properties in Che metal parts. relieved at the time and temperature specified on the applicable drawing to achieve stress relief and still meet the required mechanical proper ties. After cold work,- the metal parts chail be stress 3.
16、3 Protective coating. Protective coating shall be in accordance with the applicable drawings and specifications. When protective coating is required by component details, finish requirements will apply to all indicated surf aces of the component regardless of contour configuration. Salt spray testin
17、g shall be in accordance with the applicable drawings. the applicable drawings. All paint and marking shall be dry to the touch before testing and packing for shipment. 3.4 Painting. Painting shall comply with the requirements on 3.5 Process description and controls. The contractor in accordance wit
18、h the contract provisions shall make available a written description of the specified production process and the Government as crucial that are the first article sample (see 3.6 Structural integrity. deformation of the spike during There shall be no breakup or any proving ground test conducted. 3 Pr
19、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-70437 33 W 7777706 0354273 3 U MIL-P-70439 (AR) 3.7 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of the fi
20、rst article samples by the contractor shall be as specified in the contract. 3.8 Workmanship. The requirements for workmanship are as specified on the applicable drawings, referenced specifications and the following: 3.8.1 Metal defects 3.8.1.1 Components. All components, and component cavities shal
21、l be free from cracks, splits, cold shuts, inclusions, pipes, porosity, bursts, folds, seams, and other metal defects. 3.8.1.2 Component cavities. In addition to 3.8.1,l all component cavities shall be free of scale, fins, burrs, draw marks, laminations, imbedded foreign matter, pits, craters, and s
22、harp edges. 3.8.2 Burr. No compnent shall have a burr. 3.8.3 Foreign matter. All parts and assemblies shall be free of dirt, chips, oil, grease? rust, corrosion or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsiblity for inspection and standard quality assurance provisions. Unless
23、 otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspections. The following types of inspections shall be conducted on this item: a. First Article Inspection b. Quality Conformance
24、 Inspection 4.3 First article inspectton 4.3.1 Submission. The contractor shall submit a first article sample designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of the following sample quantities as indicated. 4 Provide
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP704391984PROJECTILE105MMM456A1ANDM622SPIKEANDCAPASSEMBLYM456A1 M622 105 MM 射弹用 长钉 组合 PDF

链接地址:http://www.mydoc123.com/p-446861.html