ARMY MIL-P-63345 A-1984 PROJECTILE PRACTICE 155MM M804 METAL PARTS ASSEMBLY《M804式155 mm教练弹的金属件组件》.pdf
《ARMY MIL-P-63345 A-1984 PROJECTILE PRACTICE 155MM M804 METAL PARTS ASSEMBLY《M804式155 mm教练弹的金属件组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63345 A-1984 PROJECTILE PRACTICE 155MM M804 METAL PARTS ASSEMBLY《M804式155 mm教练弹的金属件组件》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、% ! - L I MIL-P-63345A 13 W 7777906 0348736 7 WI 53 -57 - MIL-P-63 345A (AR) 14 May 1984 SUPERSEDING MIL-P-63345 (AR) 05 December 1980 MILITARY SPECIFICATION PROJECTILE, PRACTICE, 155MM, M804 METAL PARTS ASSEMBLY This specification is approved for use the U.S. Army Armament Muntions and Chemical Com
2、mand, and is available for use by al1 Departments and Agencies of the Department of Defense. 1.1 Scope. This specification covers the Metal Parts Assembly for the Projectile, Practice, 155MM, M804. 2. APPLICABLE DOCUMENTS 2.1 Government Documents 2.1.1 Specifications and standards. Unless otherwise
3、specified (see 6.2), the following specifications and standards of the issue listed in that issue of the Department of Defence Index of Specifi- cations and Standards (DODISS) specified in the solicitation, form a part of this specification to the extent specified herein. SPECIFICATIONS FEDERAL TT-C
4、-490 - Cleaning Methods and Pre-treatment of Ferrous Surfaces for Original Coatings MILITnRY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS MILITARY MIL-STD-105 - Inspection by Attributes MIL-STD-1169 - Packaging, Packing and Marking for Shipment
5、 of Inert Ammunition Components FSC 1320 i I Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Arm Armament Research and Development Center, Attn. DRSMC-QA, Dover, New Arsey 07801 by
6、 using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. THIS DOCUMENT CNTAw Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-633q5A 13 m 9999906 03q8737 7 m MIL-P
7、-63 34 5A (AR) 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein. DRAWINGS (see 6.12) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC) 9331795 - Pr
8、ojectile, 155MM Practice, M804 Metal Parts 9331807 - Packaging and Marking for Pallet, Wood, 9354433 - Alternate Packing and Marking for Pallet, Wood, Assembly Ammunition for Projectile 155MM “ractice, M804 Ammunition, for Projectile, 155MM, Practice, M804 PUBLICATIONS FRANKFORD ARSENAL Operating In
9、structions for Use of Detroit Testing Machine for Band Seat Inspection (Copies of specifications, standards, handbooks, drawings and publications required by manufacturers in connectian with specific acquisition functions should be obtained from the contracting activity or as directed by the contrac
10、ting officer.) 2.2 Other publications. The following documents form a part of this specification to the extent specified herein. The issues of the documents which are indicated as DoD adopted shall be the issue listed in the cxurrent DoDISS and the supplement thereto, if applicable. ANSI B46.1 - Sur
11、face Texture (Application for copies should be addressed to the American National Standards Institute (ANSI), 1430 Broadway, N.Y., N.Y. 10018). ASTM E-8 - Tension Testing of Metallic Materials ASTM E-10 - Brinell Hardness of Metallic Materials ASTM B-117 - Salt Spray (Fog) Testing ASTM A-711 - Carbo
12、n and Alloy Steel Blooms, Billets and Slabs for Forging ASTM E-103 - Rapid Indentation Hardness Testing of Metallic Materials (Application for copies should be addressed to the American Society for Testing and Materials, 916 Race Street, Philadelphia, Pa., 19103) . 2 - Provided by IHSNot for ResaleN
13、o reproduction or networking permitted without license from IHS-,-,-MIL-P-6 3 3 4 5A (AR) 2.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specification shall take precedence. 3. REQUIREMENTS 3.1 Material. Ma
14、terials, parts and assemblies shall comply with the requirements specified on the applicable drawings and specifications. w 3.2 Projectile assembly. The Projectile Assembly and components shall comply with all requirements specified on Drawing (Dwg.) 9331795 and with all requirements specified in ap
15、plicable specitications. 3.3 Steel quality. The item contractor shall establish procedures to provide a forge quality steel in accordance with ASTM A711; i.e., the steel shall be free of pipe, porosity and heavy segregation. The manufacturer will provide a certification to cite the specific revision
16、s of the industry standard under which the steel was manufactured. * 3.4 Pravinq qround. The projectiles, when tested as saecified, shall show no loss or break-up of metal components. The fuzed projectile when assembled with a smoke cannister shall on impact, produce a smoke signature visible across
17、 4000 meters of level terrain. 3.5 Mechanical properties. e 3.5.1 Body. Mechanical properties of the machined body as required by applicable drawing shall apply. 3.5.2 Rotating band. After application and subsequent removal the rotating band shall have the following mechanical properties: a. Tensile
18、 Strength - 206.8 Megapascals (MPa) b. Elongation - 25 percent in 20 millimeters (mm) (30,000 psi) minimum (min) or .75 inch (in) of gage length min. 3.6 Rotatinq band. 3.6.1 Band seat. Prior to banding, the band seat shall be clean and free from oil, grease, dirt, rust or other foreign matter. Shot
19、 or sandblasting shall not be permitted for cleanina the band seat after knurling. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- - - . MIL-P-63345A 13 M 999970b 0398739 2 M MIL-P-63345A (AR) 3.6.2 Band blank - (Gilding metal) . The rotating band
20、 blank shall be in the form of a solid ring, annealed if necessary to comply with the applicable specification; except that when hot banding at not less than 427 degrees Celsius (OC), no prior annealing is necessary. 3.6.3 Application. The bands may be applied by either hot or cold process but if ap
21、plied hot, the bands shall not be heated above 870 degrees Celsius (OC) to prepare them for application to the body. The bands shall be heated uniformly by a process which will prevent oxidation (loose scale) and applied in a manner that will hold the formation of scale between the band and the band
22、 seat to a mi nimum. 3.6.4 Band seatinq sidewall contact. The rotating band shall be applied atter tina1 heat treatment of the body, by carefully pressing the band blank into the band seat so as to make contact with the sidewalls for a minimum of eight-tenths of the band seat depth. The band shall b
23、e applied in such a manner so as not to distort the body wall. In addition, there shall be no surface gap between the rotating band and the sidewalls of the band seat, after the rotating band has been machined to final dimension. 3.6.5 Band seatinq tightness. The diametrical clearance between the ro
24、tatinq band and the band seat shall not exceed 0.15mm (.O06 in), when the-destructive method of testing is used or 0.23mm (. O09 in) when non-destructive method of testing is used. 3.7 Metal defects. - 3.7.1 Body. The body, including the cavity, shall be free from cracks, splits, bursts, cold shuts,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP63345A1984PROJECTILEPRACTICE155MMM804METALPARTSASSEMBLYM804 155 MM 教练 金属件 组件 PDF

链接地址:http://www.mydoc123.com/p-446807.html