ARMY MIL-P-63313 (7)-1993 PRIMER ELECTRIC M80A1 (ALTERNATE) LOADING ASSEMBLING AND PACKING《M80A1式(备用)电引物的装药 组装和包装》.pdf
《ARMY MIL-P-63313 (7)-1993 PRIMER ELECTRIC M80A1 (ALTERNATE) LOADING ASSEMBLING AND PACKING《M80A1式(备用)电引物的装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63313 (7)-1993 PRIMER ELECTRIC M80A1 (ALTERNATE) LOADING ASSEMBLING AND PACKING《M80A1式(备用)电引物的装药 组装和包装》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、I NCH-POUND MIL-P-63313 (AR) AMENDMENT 7 19 August 1993 SUPERSEDING AMENDMENT 6 16 MARCH 1993 MILITARY SPE CI FI CATION PRIMER, ELECTRIC, M80A1 LOADING, ASSEMBLING AND PACKING This amendment forms a part of Military Specification MIL-P-63313 (AR), dated 29 June 1979, and is approved for use by the U
2、. S. Army Armament Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 1.1: Delete 2.1: Add : “MIL-A-70625 - Automated Acceptance Inspection Equipment Design, Testing and Approval, of.?! MIL-E-46215: Delete “Igniter, Electronic
3、 Primer, M83 and Electric Primers, M80A1 and M83“ and substitute “Electric Primers, M80A1, M83 and M120“. AMSC N/A 1 of 9 FSC 1390 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
4、om IHS-,-,-MIL-P-63313 ( AR) AMENDMENT 7 PAGE 2 2.1: Add: “MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributest1. MIL-STD-286: Delete “Propellants: Sampling, Inspection and Testing“ and substitute “MIL-STD-286 - Propellants, Solid : Sampling, Examination and Testing“. Drawings:
5、 8839499: Delete “Sheet 2-If. 3.1.1 : Delete “(Sheet 2)“. 3.3.1: Delete “.at the loading station at the time of loading the ignition element .?I, and substitute I. after drying.“. Deletee ?I .O. 10 percent.? and substitute ?I .0.02 percent.“ PAGE 3 * 3.8.1: Delete: “3.8.1 Assembly torque. Threaded j
6、oints shall withstand subsequent reapplication of the minimum assembly torque specified on the applicable drawing, without moving, while thread sealing compounds (if required) are wet.“ and substitute: “3.8.1 Head loading assembly. The Retainer and Closing Plug Loading Assembly shall comply with dra
7、wing torque requirements. (See 4.5.8.1)“. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63313 (AR) AMENDMENT 7 * 3.8.2: Delete: 1T3.8.2 Disassembly torque. Threaded joints shall withstand application of the minimum disassembly torque specif
8、ied on the applicable drawing, without moving, after thread sealing c ompoun d s ha s cur ed . and substitute: “3.8.2 Primer loading assembly. The Primer Head/Body threaded joint shall comply with drawing torque requirements. ( Se e 4 .5 -8 . 2 1 . PAGE 4 4.2: Delete tlatft and substitute ionyi. 4.3
9、.1: Delete “(Sheet 2)“. PAGE 6 For Head loading assembly: Delete “4.4.2.3 &I1. Examination or Test Block: Delete “-Sheet 2“. PAGE 8 4.4.2.1: Note 1: Delete in its entirety and substitute: “Three samples minimum shall be selected from each drying oven after completion of drying cycle. If the moisture
10、 content of any sample exceeds the requirement, that quantity of material represented by the sample shall either be redried until acceptable results are achieved or rejected. The selected samples must not be dried more than any other unit which could be selected.11 PAGE 10 * 4.4.2.3: Delete in its e
11、ntirety. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63313 (7) m 9999906 1952058 75T m MIL-P-63313 (AR) AMENDMENT 7 PAGE 11 * 4.4.2.4: Delete in its entirety and substitute new paragraph 4.4.2.4 included herein as page 5. 4 Provided by IH
12、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2 O H E- V w a vl z H 7 8 7 E o ai bo m M L O - (u F- In (Jco(uLn=rclcO (u O M MMMMMMMM M . . . . . . . . . . . 7 M -I -I bo M c 3 a c (o S m E 24 L .d ? L O O 44 O a, V S aJ a ad w a il L .-lo 0- m- z (u ma mu3 &cor
13、n 00000000 o 1- CO Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63313 (7) D 9999906 1952060 308 D MIL-P-63313 (AR) AMENDMENT 7 PAGE 12 4.4.2.5: Drawing Number Block: Delete “(sheet 2)“. Add Critical Defect: t 2 Plug missing 100% 3.2 Vi sualV
14、V. Category 201: Delete VisualfT (appearing in Amendment 5) and substitute tlGagelv (as in the Basic Specification). PAGE 19 4.4.3.2.1: Delete “Beginning with the first lot produced and continuing until three and substitute “Beginning with the first lot produced, or the lot following a rejected lot
15、in 4.4.3.2.2, and continuing until three“. 4.4.3.2.2: Add to the end of the paragraph: IfIf a lot is rejected under these criteria, continue testing lots in accordance with 4.4.3.2.1.“ 4.5.2.1: Delete in its entirety and substitute: “4.5.2.1 Igniter charge composition. The moisture content of the ig
16、niter charge composition shall be determined as specified in Method 102.2.1 of MIL-STD-1234 except that the electric ignition element loading assembly and only a two hour drying time shall be used. The upper insulator from the electric ignition element loading assembly may be removed prior to analys
17、is.ll 4.5.2.1.1 : Delete in its entirety. PAGE 20 4.5.2.3: Delete “Method 102.1 and substitute “Method 102.1.3“. * 4.5.3: Line four: Delete and substitute tloflt. Delete sheet 2“. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63313 (AR) AME
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP6331371993PRIMERELECTRICM80A1ALTERNATELOADINGASSEMBLINGANDPACKINGM80A1 备用 引物 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446779.html