ARMY MIL-P-63312-1979 PRIMER ELECTRIC M80A1 METAL PARTS FOR《M80A1式电引物用金属零件》.pdf
《ARMY MIL-P-63312-1979 PRIMER ELECTRIC M80A1 METAL PARTS FOR《M80A1式电引物用金属零件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63312-1979 PRIMER ELECTRIC M80A1 METAL PARTS FOR《M80A1式电引物用金属零件》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、- HIL-P-b3312 13 7799906 0397725 5 m .f 5- 37- (9 MIL-P-6 3 3 12 (AR) 29 JUNE 1979 MILITARY SPECIFICATION PRIMER ELECTRIC, M80A1 METAL PARTS FOR (ALTERNATE) This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all Departments
2、and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the metal parts for an alternate design of Primer, Electric, M80A1. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this
3、 specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provision, General Specification For STANDARDS MILITARY MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert Ammunition Components FSC: 1390 Beneficial comments
4、(recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Army Armament Research and Development Command, Attn. DRDAR-BA, Dover, New Jersey 07801 by using the self-addressed Standardization Document Improvement
5、 Proposal (DD Form 1426) appearing at the end of this document or by letter. / 7 . THIS DOCUMENT CONTAINS 15 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. , ., MIL-P-b3312 13 77777Ob 0347726 7 = MIL-P-63312 (AR) DRAWINGS ARMY 9327339 - Hea
6、d Primer 9327342 - Plug, Closing 8839509 - Retainer 9327344 - Body 8831022 - Plug I (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting
7、 officer). 3. REQUIREMENTS 3.1 Material.-Materi-als shall be in accordance with applicable drawings and specifications. 3.2 Metal parts components.-The metal parts components shall comply with all requirements specified on applicable drawings and with all requirements specified in applicable specifi
8、cations. 3.3 Hydrostatic test.-The primer tubing shall withstand the application of a minimum (min.) hydrostatic pressure with- out rupture or indication of flaws, as evidenced by leaks, and without permanent deformation beyond drawing requirements, when tested as specified in 4.5.1 (see 6,4). sharp
9、 edges, cracks, unblended radii, surface defects, dirt, grease, rust, corrosion products and other foreign matter. The cleaning method shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat and sharply defined. 3.4 Workmanshi
10、p.-All parts shall be free of burrs, chips, 3.5 First article inspection.-This specification makes provisions for first article inspection. Requirements for submission of first article samples by the contractor shall be as specified in the contract. 2 Provided by IHSNot for ResaleNo reproduction or
11、networking permitted without license from IHS-,-,-MIL-P-b3312 13 W 7797706 03q7727 7 W MIL-P-63312 (AR) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions.-Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 sha
12、ll apply and are hereby made a part of this detail specification. 4.2 Classification of inspection.-The following types of inspection shall be conducted on this item. a. First Article Inspection b. Quality Conformance Inspection 4.3 First article inspection 4.3.1 Submission.-The contractor shall sub
13、mit a first article sample as designated by the Contracting Officer. first article sample shall consist of ten (10) complete sets of parts (i.e.? ten (10) each of every component). The first article sample shall be evaluated in accordance with the provisions of 4.3.2 and 4.3.3. The 4.3.2 Inspections
14、 to be performed.-See MIL-A-48078, and Table I specified herein. 4.3.3 Rejection.-See MIL-A-48078. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 *t *t e e e e e “! h! hl m m m h! ? m m I O rlo O O O rl rl rl rl n w m rn U U al nw wal O rl&l mo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP633121979PRIMERELECTRICM80A1METALPARTSFORM80A1 引物 金属 零件 PDF

链接地址:http://www.mydoc123.com/p-446778.html