ARMY MIL-P-63311-1979 PRIMER ELECTRIC M83 LOADING ASSEMBLING AND PACKING《M83式电引物的装药 组装和包装》.pdf
《ARMY MIL-P-63311-1979 PRIMER ELECTRIC M83 LOADING ASSEMBLING AND PACKING《M83式电引物的装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63311-1979 PRIMER ELECTRIC M83 LOADING ASSEMBLING AND PACKING《M83式电引物的装药 组装和包装》.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、7 - *- MIL-P-b33LL 13 W 779770b O347896 2 c-3744 ;!IL-P-52311 (AR) 29 JUNE 1979 MIL I TAIIY SPEC IF 1 CAT ION PRMER, ELECTRIC, 1%3 (ALTERKATE) LOADI%, ASSEI4BLIlG Al.10 PACKING This specification is approved for usehy the US Army krniament Researc+ and Development Coinmarid, and is available for use
2、 hy all Departments and Agencies of the Department of Defense. 1 SCOPE .- 1.1 Tfiis specification contains requiremetits not covered by the drawings and provides qlial i ty assurance provisions for loading, assembling anti packing of Primer, Electric, I183 (Alternzte), 2. APPLICABLE DOCUIIENTS - 2.3
3、 The following documents of the issue in effect on date of invitation for $ids or request for proposals, form a part of this * , specification to the extent specified herein. SPECIFICATIOr4S P? I L 1 TARY E: I L - P- 1 1 5 - Preservation, Kettiods uf b:IL-P-223 - Powder. Black MIL-E-4C215 - Element,
4、 Ignition, Electric ?etal Parts Assembly, For Igniter, Electronic Primer, f63 and Electric Primers, f480A1 and Y33 MIL-A-48078 - AmiiJnition, Standard Quality Assurance Provisions, General Specification For 7 FSC: 1390 Beneficial commenta (mommendationr, additions, deletions) and any pertinent data
5、which may be of um h improving thin document should be iddremd te: Commander, US Amp Amment Reaeuch and Development Command, Attn. DRDARQA, Dover, New Jenep 07803 by wing the rel-addrewd Strndardiuaon Document Improvement bH (DD Form 1426) appearing at the end of thin document or by letter. P s Prov
6、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-P-6331L 13 W 977770b 0397897 4 KIL-P-63311 (AR) STANDARDS !4 I L 1 TARY MIL-STD-286 - Propellants: Sampl ing, Inspection and Testing WIL-STO-1234 - Pyrotec+cics, Sampling, Inspec tion and Testing DRAWJN
7、GS II S AR t*iY ARMA4E NT RES E A9 C I i .4t:D DEVE LOP t.1 E l4T COMM AFID ( ARR ADCOM 1 8847475 - Prinier Electric, 33 (Sheet 2) Loading Asscrnbly 8847545 - Carton, Packing, Anitnunition, for Primer, Electric, M83 85475415 - Box, Packing, Ammunition, for Priiner, Electric, bl3 (Copies of specifica
8、tions, standards, drah in g s, and publications required by suppl iers in connection with specific procurement fiinctions should be obtained froin the procuring activity or as directed hy the contract ir,g off iccr!, 3. REQUIREHEFJTS 3.1 !kiterials.-#aterials shall be in accordance witti applicable
9、drawings and speci Fications. 3.1.1 Primers.-The loaded primers shall comply with all requirements specified on Drawing 8817475 (Sheet 2) and wit? all requirements specified in appl icab7e specifications. 3.2 Parts.-The parts shall cornply wi til al 1 requirements specifiedarawings listed in paragra
10、ph 2.1 and associated drawings and with all requirements specified in appl icable specifications and standards. 3.3 Moisture content 3.3.1 I nition element charge cornposition.-The moisture content of the ignit?%ent charge coinposition atthe loading station at the time of loading th2 ignition elemen
11、t shall not exceed 0.10 percent. 2 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b . tlIL-P-63311 (AR) 3.3.2 Black owder.-The moisture content of the black powder at 3.3,3 Benite.-T!# moisture content of the benite et the loading the time of + oa
12、ding the closing plug shall not exceed 0.50 percent. station at the time of loading shall not exceed 1.00 percent 3.4 Electrical resistance test,-Thc head loading assmihly aric! the loaded mimers shall hava an electrical resistance of not less than 0.80 ohms nor more than 1.80 oFms. 3.5 Functianing/
13、non-functionins test (Heit4 loa:!ina assenhly) ?.5.1 Functinnin .-The head ?loadiny assemhl! shall fiinction when a current _1Q of .25 amperes, maximum, is applied. 3.5.2 Mon-functianing.-Thc head loadino assembly shsll not 3.6 Lacquer in flash holes.-The lacauer in prfmer fl?sfi hales function when
14、 a current of l?O to ?O0 milliamperes is applied. shall comply with illustration 1, 2 or 3 or Figure 1. e. 3.7 Provine round.-The primer shall camply with the following - d requirements _Qf_ when ired ballistically: a. The pr?mer shall not fail tn fim. b. The primei- body shall not rupture or become
15、 detached. c. There chal1 he no audih7e hangfire(s) (see C.6.a). d. The primer shall not squib (see 6.G.b). 3.8 Torque requirenients 3.8.1 AsseinIr1 tor ue.-Threaded joints siali withstand subsequent + reapp ication of the minimuni assembly torque specified on the applicable drawing, without moving,
16、 vhile thread sealing compounds ( if required) ax wt. 3.8.2 Disassembly torque.-Threaded joints shall withstand applicationsasscmhly torqrie specified on the applicable druing, without moving, after thread sea1 ing compound has cured. 3.9 First article inspection.-This specification contains technic
17、al pravisions for first article inspection, Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-63311 13 m 797770b 0347897 = MIL-P-
18、53311 (AR) 3.10 Workmansliip.41 1 parts and assemhl i2s slial 1 be fabricate6 and loaded in accordance to the appl icabte spccif ications and drawings. They shall be clean and free of burrs, sharp edges, unblcnded radii, surface defects, c!iips, dirt, grease sild oil (except where specifically requi
19、red), corrosion products 2nd other foreign matter. The cleaning inethoil used shall not be injurious to any part or assembly nor shall they be contaminated by the cleaning agent. Exterior surface coatings shall he continuous except for a f2 light scratches not exposino Inse material. A11 required ma
20、rcings shall he neat and sharply defined. Required packing shall be dry. 4. QUl4LITY ASSURANCE PROVISJOMS - - 11.1 Responsibility for inspection and standard quality assurance provisions.-Unless otfierwise specified herein or in the ccntract, the provisions of RIL-A-48073 shall app7y and are hereby
21、madc a part of this detail specification. - 4.2 Classification of inspections.-The following types of inspection shall benaucted on this-item. - 4 a. First Article Inspection b. Qual i ty Confomance Inspection 4.3 First article inspection 4.3.1 Suhniissioii.-The contractor shall submit a .f irst art
22、icle - sample as d-iy the Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article sample shall consist of the followiiig items in samp?e quantities as indicated in Table 1, Part/Assembly Rescription Eleiiien t , Ign i ti on y Electr icy LrJad i ng Plug. Closin9 L
23、oading Assembly Head Loading Assembly Primer E?ectric, M83 Loading Assembly Ass em!, 1 y Carton, Packing, Animunition for BOX, Packing, Aminunition for Primer, Primer, Electric, 1.183 Electric, i483 4 Drawings 8833505 932734 9327345 3847476 (Sheet 2) 884 7 54 5 8847545 I Quantity 10 10 4oc 100 5 5 I
24、 -I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-63311 13 M 9999906 0347700 O I M I L- P - 6 3 3 1 1 ( AR ) 4.3.2 Irispections to be performed.-See - MIL-A-48078 and Table I specified herein. 4.3.3 Rejection. -See MIL-A-48078. 5 Provided by
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP633111979PRIMERELECTRICM83LOADINGASSEMBLINGANDPACKINGM83 引物 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446775.html