ARMY MIL-P-63306-1979 PRIMER ELECTRIC M83 METAL PARTS FOR《M83式电引物用金属零件》.pdf
《ARMY MIL-P-63306-1979 PRIMER ELECTRIC M83 METAL PARTS FOR《M83式电引物用金属零件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63306-1979 PRIMER ELECTRIC M83 METAL PARTS FOR《M83式电引物用金属零件》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-P-6330b 13 99999Ob 0347821 4 /Sd 3 74 7, MIL-P-63306 (AR) 29 JUNE 1979 MILITARY SPECIFICATION PRIMER ELECTRIC, M83 METAL PARTS FOR (ALTERNATE) This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all Departments and Agen
2、cies of the Department of Defense. SCOPE 1. - 1.1 This specification covers the metal parts for an 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date alternate design of Primer, Electric, M83. of invitation for bids or request for proposal, form a part of this specifi
3、cation to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provision, General Specification For STANDARDS MIL I TARY MILrSTD-1169 - Packaging, Packing and Marking for Shipment of Inert Ammuni-tion Components 1. FSC: 1390 Beneficial commenta (r
4、eeommsndations, additions, deletions) and any pertinent data which may be of um in improving thin document should be addressed to: Commander, US Army Armament Research and Development Commuid, Ath DRDAR-QA, Dover, New Jersey O7801 by using the self-addressed Standaidization Document Improvement Irop
5、oSol (DD Form 1426) appearing at the end of this document or by letter. . r- r THIS DOCUMENT CONTAINS PAGES. -. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-63306 13 7777706 0347822 b 9 MIL-P-63306 (AR) DRAWINGS ARMY 9327339 - Head Primer 93
6、27342 - Plug, Closing 8839509 - Retainer 9327340 - Body 8831022 - Plug (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer). 3.
7、 REQUIREMENTS 3.1 Material.-Materials shall be in accordance with 3.2 Metal parts components.-The metal parts components applicable drawings and specifications. shall comply with all requirements specified on applicable drawings and with all requirements specified in applicable spec i fi cat i ons .
8、 3.3 Hydrostatic test.-The primer tubing shall withstand the application of a minimum (min.) hydrostatic pressure with- out rupture or indication of flaws, as evidenced by leaks, and without permanent deformation beyond drawing requirements, when tested as specified in 4.5.1 (see 6.4). sharp edges,
9、cracks, unblended radii, surface defects, dirt, grease, rust, corrosion products and other foreign matter. The cleaning method shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat and sharply defined. 3.4 Workmanship.-All p
10、arts shall be free of burrs, chips, 3.5 First article inspection.-This specification makes provisions for first article insDection. Reauirements for submission of first article samples by the contractor shall be as specified in the contract. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for ins
11、pection and standard quality assurance provisions.-Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
12、,-,-MIL-P-b330b 13 777790b 0347823 I - MIL-P-63306 (AR) 4.2 Classification of inspection.-The.following types of inspection shall be conducted on this item. a. First Article Inspection b. Quality Conformance Inspection 4.3 First article inspection 4.3.1 Submission.-The contractor shall submit a firs
13、t article sample as designated by the Contracting Officer. The first article sample shall consist of ten (10) complete sets of parts (.e., ten (10) each of every component). The first article sample shall be evaluated in accordance with the provisions of 4.3.2 and 4.3.3. 4.3.2 Inspections to be perf
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP633061979PRIMERELECTRICM83METALPARTSFORM83 引物 金属 零件 PDF

链接地址:http://www.mydoc123.com/p-446772.html