ARMY MIL-P-63223 A (3)-1994 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf
《ARMY MIL-P-63223 A (3)-1994 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63223 A (3)-1994 PROJECTILE GUIDED 155MM M712《M712型155 mm制导弹》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-63223A (AR) AMENDMENT 3 03 August 1994 SUPERSEDING AMENDMENT 2 12 July 1989 MILITARY SPECIFICATION PROJECTILE, GUIDED, 155MM, M712 This Amendment forms a part of Military Specification MIL-P- 63223A (AR), dated 5 December 1984, and is approved for use by the US Army Armament, Munitions and Che
2、mical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 7 4.3.2, Insert the following between the word “drawings“ and the word “Environmenta“ in line 4: The scoring criteria shall be in accordance with the reliability scoring criteria in the Appendi
3、x.“ 4.3.3, Delete the first five (5) lines and substitute the following: “4.3.3 Rejection. If any test sample fails to comply with any of the applicable requirements, the first article samples shall be rejected. When launched, not more than four (4) projectiles in each temperature group of i0 projec
4、tiles and not more than seven (7) projectiles totally shall fail to function as defined in 3.3.1.3 or the first article sample shall be re j ected . II PAGE 15 * 4.4.2.5 Major Category change: From: 18109. Painting of dome (window)“ To : “109. Painting of dome (window) workmanship and dimensions“ Mi
5、nor 206 delete in its entirety and substitute the following: . “206 Preparation for delivery 100% 5.0 4.5.8“ PAGE 17 4.4.3.1 Delete the entire paragraph and substitute the following: Licensed by Information Handling Services MIL-P-63223A (3) D 9999906 L998L20 759 D MIL-P-63 22 3A (AR) AMENDMENT 3 “4
6、.4.3.1 Sequential samplinq for fliqht testing. Each inspection lot shall be subjected to the flight test by the procuring activity in accordance with 4.5.7. The scoring criteria shall be in accordance with the reliability scoring criteria in the Appendix. Sampled projectiles from each inspection lot
7、 shall be selected at random by the procuring. activity for the flight test. The test samples shall be . selected from the production .run throughout the period that an inspection lot is being produced. After selection, the test sample shall be stored in containers (MIL-P-63227) in a bonded area and
8、 no further tests on the sample shall be performed by the contractor, The acceptance/rejection criteria shall be in accordance with the sequential sample plan of Table V if there are two or less soft recovery failure, and the criteria shall be in accordance with the sequential sample plan of TabIe V
9、I if there are three or more soft recovery failures. If the number of failures for the six soft recovery rounds is equal to 2, and the score for the six-soft recovery rounds in the previous lot was 2, the sample size and criteria for lot acceptance test shall be as shown in Table VI. If the failure
10、mode(s) identified in a failed soft recovery round is such that the failure mode(s) can be eliminated from the lot by screening or rework, the Contractor may screen or rework the lot to remove the rounds with the failure mode(s1. In this event, th0 failed soft recovery round(s) shall not be scored a
11、s a failure. The Government reserves the right to implement the sample size and acceptance criteria as shown in Table V without regard to the scoring results of the soft recovery tests. In event that an accept/reject decision is determined before all selected projectiles havebeen flight tested, the
12、remaining projectiles shall be returned to the lot for delivery. The environmental test performed on the projectile is not considered destructive and projectiles that have been subjected to environmental tests and ,lot flight tested shall be returned to the lot for delivery. The cannon launch test c
13、onditions shall be in accordance with Table IV.“ 4.4.3.2, Delete the word “three (3) on line 2 of the first 4.4.3.2, Delete the first sentence in the last paragraph and paragraph and substitute the word six (6)“. substitute the following: “The contractor shall select three (3) projectiles from the b
14、eginning of the month and three (3) projectiles from the middle of the month, In each lot, at least two of the soft recovery rounds shall be separated at the seeker electronics package interface and at least two (2) rounds shall be seperated at the guidance section/warhead interface. Three (3) round
15、s, shall be 2 Licensed by Information Handling ServicesMIL-P-63223A (AR) AMENDMENT 3 tested at cold temperature (-25 degrees FI, three (3) rounds shall be tested at high temperature (t145 degrees P) and all six (6) rounds shall be fired at high g using the H119A2 zone 8 charge. In all cases, the rou
16、nds shall be preconditioned to the same temperature for the live sequence phase of the test as they were during the gunfire phase of the test. PAGE 19 Delete Table V and substitute Tables V and VI as follows: (Note: Table V was previously changed by Amendment 1.) .Table V. Sequential sample plan and
17、 accept/reject criteria. Number samples Number Fa i lur e c Re j e c t Ac cep t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 - - - - O O O O 1 1 1 1 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 7 9 a - 3 4 4 4 0 5 5 5 5 5 6 6 6 6 7 7 7 7 8 8 8 8 9 9 9 9 10 10 10 1
18、0 10 3 Licensed by Information Handling ServicesMIL-P-63223A (AR) AMENDMENT 3 NOTES: (a) The number of failures stated above represents functional failures as defined by paragraph 4.5.1.4. A failure of this type is classified as a Major Defect. (h) If a projectile detonates prior to fuze arming the
19、failure is classified as a Critical Defect and the entire lot is rejected. Table VI. Sequential sample plan and acceptheject criteria. Number Samples Number Failures Accept Reject 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 - - - - - - O O O
20、O O 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 4 4 4 4 5 5 5 5 5 6 6 - - - 4 4 5 5 5 5 5 6 6- 6 6 6 7 7 7 7 7 8 8 8 8 0 9 9 9 9 9 1.0 10 10 10 11 11 11 4 Licensed by Information Handling Services MIL-P-63223A (31 m 0b LBL23 468 m MIL-P- 63 2 23A (AR) AMENDMENT 3 38 39 40 41 42 43 44 45 46 47 48 6 6 6 7 7 7 7 7.
21、8 9 10 11 11 11 11 11 11 11 11 1 1. 11 11 NOTES: (a) The number of failures stated above represents functional failures as defined by paragraph 4.5.1.4. A failure of this type is classified as a Major Defect. the failure is classified as a Critica. Defect and the entire lot is rejected.“ (b) If a pr
22、ojectile detonates prior to fuze arming, PAGE 29 4.5.8, Delete line 4 and substitute the following: “been prepared and soft recovered per 4.5.8.1 and figures 7 and 8. The projectile“ 4.5.8, Add figures 7 and 8 included. PAGE 30 Add the following paragragh: 4.5.8.3 Soft recovery scoring criteria I. P
23、rojectiles utilized for soft recovery firing in accordance with 4.5.8.1 shall be subject to the following scoring criteria: a. During gunfire testing, rounds which experience hard impact due to failure of the parachute recovery system will be scored as “NO TEST“. b. During continuity testing at the
24、firing site, failures will be scored only for opens or shorts that are verified by subsequent laboratory testing. 5 Licensed by Information Handling Services MIL-P-63223A 9999906 1998124 31 3T4 MIL-P-63223A(AR) AMENDMENT 3 CONTRACTOR OPE RATION I Guidance Section1 Install Connectors + Radiograph See
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP63223A31994PROJECTILEGUIDED155MMM712M712 155 MM 制导 PDF

链接地址:http://www.mydoc123.com/p-446743.html