1、MIL-P-603L4 (1) 23 O6 0337537 I RI- i .- MIL-P-60314 (MU) Amendment 1 .20 Nmember, 1973 MILITARY SPECIFICATION PRIMER, PERCUSSIONy M32, PARTS FOR: This Amendment forms a part of Military Specification MIL- P-60314 (MU) dated 29 January 1965. In Paragraph 2.1 under Specifications: Delete “MIL-1- . 45
2、607-Inspection Equipment, Supply and Maintenance of,“- Delete 1MIL-I-5208-nspection Requirements, General Specifications for . Add the Following: “MIL-C-4 5 662 -Cal i br at i on S y s t em R e quir em en t s . Paragraph 2.1, under standards, add the following: “MIL-STD-1168 -Lot Numbering of Ammuni
3、tion.“ “MIL-STD-1169 Inert Ammunition Components. -Packaging, P9cking and Marking for Shipment of Paragraph 2.1 under Drawings, delete “Ordnance- Corps“ and -. sub s t it ut e “Army I Paragraph 2.1 under Publications, delete the following: “Ordnance Corps“. “IEL-6112755 - Index of Inspection Equipme
4、nt Lists.“ Paragraph 3.3 -Add the following sentence at end of the para- “All required markings shall be neat and sharply defined.“ graph: Add the following paragraph: . 3.4 First article inspection. -This specification makes provisions for first article inspection,. Requirements for the submission
5、of first article samples by the contractor shall be as specified in the contract. Relete Paragraph 4.1.1 in.its entirety and substitute the following: FSC: 1375 -75 DOCUMENT CONTAINS ., L.PAQB o Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-._ .-.
6、MIT,-P-60314 (NU) Amendnent 1 4.1.1 Submission of product. - At the time each completed lot of items deliverable under the contract is submitted to the Government for aaceptance, the contrator shall sunply the following information accompanied by a certificate which attests that the information movi
7、ded is correct and applicable to the product being submitted: a. A statement that the lot complies with all of the quality assurance provisions snecified in this specification. b. Drawing and saecification number and date, together with identification and date of chcnges thWetQe c. A statement that
8、all material Furchased by the contractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and the certificates of conformance are on file and available for review, Number of items in the lot. d. e. Date Su
9、bmitted. The certificate shall be signed by a resnoncible agent of the - certifying organization, The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his mincinal, Substantiation of the agents authority will not be required with subsequent certificate
10、s unless, during the course of the contract, this authority is Vested in another agent of the certifying organization. . Delete Paragraphs 4.1.2 and 4.1.3 in their entireties. Delete Paragraphs 4.2, 4.2.1, 4.2.2 and 4.2.3 in their entireties and substitute the following: “4.2 First Article insnectio
11、n i i b.2.1 submission. - The contractor shall submit a first arti- cle sample as designated by the contracting officer for evalbation in accordance w5th the provisions of 4.2.2. sable shall consist of 25 assemblies and 25 complete sets of parts (i.ee 25 each of every component and every subassembly
12、) which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, proce- dures and equipment which wiU be used in fulfilling,the contract. All parts and materials, including packaging and packing, shall be obtained from the
13、same source of supply as will be used in regular production. Frior to submission, the contractor shall inspect the samole to the degree necessary to assure that it confarm to the The first article 2 - - * -=-*-) ,u- P . u Provided by IHSNot for ResaleNo reproduction or networking permitted without l
14、icense from IHS-,-,-MIL-P-bo314 (1) 13 m 9997706 0337537 5 m . MIL-P-60314 (MU) . Am en dm en t 1 requirements of the contract and submit a record of this in= spection with the sample, including statements of findings for materials, processes and tests. A sample containing known de- fects will not b
15、e submitted unless specifically authorized- by thereof, as directed by the contracting officer, shall also be . submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a change occurs in manufacturing . process, material used, drawing or specification such as
16、to signi- ficantly affect product uniformity as determined by the Government. 4.2.2 Inspections to be performed.-Assemblies and com- the Contracting Officer. A first article sample, or portion ponents will be subjected by the Government to any or all the examinations or- tests specified in 4,.3.2 of
17、 this specification and any or all requirements of the applicable specifications.“ . “4.2.3 Rejection.-If any assembly or component fails to comply with any of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate its inspection upon
18、any failure of an assembly or component to comply with any of the stated requirements.“ Delete Paragraph 4.3.1 in its entirety and substitute the following: “4.3.1 Lot Formation.-The term “inspection lot“, as used in this specification, is defined as an essentially homogeneous collection of units of
19、 product from which a representative sample is drawn and inspected to determine conformance with applicable requirements. The sample selected shall represent only that quantity of units from which the sample was drawn and shall not be construed to represent any prior or,subsequent quantities present
20、ed for inspection. Homogeneity shall be considered to exist provided the inspection lot has been pro- dced by one manufacturer, in one unchanged process, using the same materials and methods, in accordance with the same drawing, same drawing revisions, same specifications and same specification revi
21、sions, and complies with 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-6034 (MU) Amendment 1 the provisions for submission of product as specified in Standard MIL-STD-105. Changes to the process, specifications or drawings, not affecting sa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP6031411973PRIMERPERCUSSIONM32PARTSFORM32 撞击 引物 部件 PDF

链接地址:http://www.mydoc123.com/p-446625.html