ARMY MIL-P-60096-1964 PRIMER PERCUSSION M62 METAL PARTS FOR《M62撞击引物用金属部件》.pdf
《ARMY MIL-P-60096-1964 PRIMER PERCUSSION M62 METAL PARTS FOR《M62撞击引物用金属部件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60096-1964 PRIMER PERCUSSION M62 METAL PARTS FOR《M62撞击引物用金属部件》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、- U . .- . . . . -. W. . . . . -.*.- . . _. e . , . - . . . . . . . . 1 . 1 . m*. i2:zr?-j -_.- _I_ . MIGP-60096 (MU) 209. Concentricity of inside diameter with pitch dlamter Of th$dbb.rr.C18g8 04016 210. Flniah Ir*.*.*.v;8 04017 211. Protective coating damaged 04018 212. Evidence of poor normahip (
2、baas metal sxpomd) . .Vlsl (see 3.8) .Visual oco19 .i 4.3.3. Teetlm 4 4.3.3.1 Hydroatatla teat (aeb 3.3) Cpitlcal defect - Code No. OSOl“.-Thle test shall be conducted POO percent. shall be performed a8 epeciflsd In B.Q+1 using equipWnt in and no pr-r ucilee shsS1 be Fabricated themfrarn. !Rm teat 3
3、 -3 4.3.4 Xnsggutton Equipwnt.-Index of Inepection 3 “4 9 5 accordance with 4.3.4. with tha applicable requireiwnt, it pihall be claabd defective If any pplm tubing falls to comaply _- -4 Equipment Number IEL 8780970 required to perform the examinationo and tsata prescribed In this section. In accor
4、dance with the InstrmctionfJ fn paregraph 6.3. fdentlflea the inspection equipment me contractor shall dmign in8psctlon squlpmnt 4.3.4.1 Qowrnment rights to documntation.-Inspetion equipment drawings and lists grovlded and revised in accordance with the requlmsents of the IEL may be usad by DOD actl
5、vltlee for doaun, procurersont, mufactwe, teethng, evaluation, production and receiving lnapection, overhaul, ekippSng, atow identification of stock, orbering and storage of replacement parts, inspection of ltema at oV8Fhm1, general maintenance of squlpmnt, conetruction, survey and whenever inapscti
6、on : equlpment drawings are needed. the equipmnt listed on the IEL shall ba In accordance with Specification MILI-45607. 4.3.4.3 Government uua of contractorrs Inspection and teat equlpmcnt,-The contractor shall make available to the (fovernment all lnapaction and test *- equipment neoessary for lo
7、4.3.4.2 Supply and mslntenance.-Supply and maintenance of f- -. - .- . = ,. -. Q, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MILP-60096 (MU) . . . _ .a . 4.4.1 Hydrostatic test. -Prior to machining, the tubing for primer fabrication shall be ass
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP600961964PRIMERPERCUSSIONM62METALPARTSFORM62 撞击 引物 金属 部件 PDF

链接地址:http://www.mydoc123.com/p-446615.html